You are on page 1of 1

LAPORAN STRESSING (STRESSING REPORT)

STRESSING SATU ARAH (STRESSED FROM ONE END)


WIKA BETON POST-TENSION
Proyek/ Project : Jembatan Preservasi Jlan Lintas Timur Sumatra di Prov. Riau
Kontraktor Utama : PT. Citra Lautan Teduh
Konsultan : 0

Struktur/ Structure :
PRECAST I - GIRDER SEGMENTAL H- Jumlah Strand/ No. of strand : 12 Dihitung/ Calculated by:

125cm; L-16m; CTC-220cm Luas Strand/ Area :


1184,52
Luas area piston/piston area 57727 mm Diperiksa/ Checked by:
No. Tendon/ Duct No : C1
Jacking Force :
75%
Jack No. :
Pressure Gauge Elongation
Anchor Stressing Length of
Stressing Force
Location order Tendon
Calc. Read Calc. Meas. difference
m KN % Mpa Mpa mm mm mm % Girder No :
1 1 3 4 5 6 7 8 9 10 = 9 - 8 11 = 10/8*100
SISI A
(END A) 16
0 0 0 0 Date :
413 25 7,15 25,75
825 50 14,3 51,5
1238 75 21,45 77,25
1651 100 28,6 103
Note :
Min 96
Ideal 103
Max 110

Proposed by: Known by:


PT. Wika Beton Consultant Contractor

Name: Name: Name: