You are on page 1of 1

Collect all materials needed.

Mix the dry materials ( Plastic, Sand, Gravels ).

Add water, then mix again.

Put the mixture to the hollow blocks molding machine.

For the curing process, leave under direct sunlight for three days.

For testing the durability, we will use the testing machine.

You might also like