Professional Documents
Culture Documents
Job Ref.
Engineering Consultants Group CHECKING AND PACKING HALL
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.
2)-DIM. OF SECTION :-
Mx
The section is Rolled section IPE 600
bFL.U = 220 mm
tFL.U = 19.0 mm
hWEB = 600 mm
tWEB = 12.0 mm
bFL.L = 220 mm
tFL.L = 19.0 mm
m.nour
3)-COLUMN DATA :- Mx
Total length of column = 8.50 m Y
Lu act.of comp. Flange = 8.50 m bY
Y
Length subject to buckling in plan = 11.10 m tfl
Length subject to buckling out plan = 8.50 m
Length of girder Lg = 11.00 m
Ix (rafter) = 16270.00 cm4 X
X h tw
Base type = Fixed
My
4)- PROPERTIES OF SECTION :-
A = 156.00 cm2 Y
Y = 300.00 cm
X = 110.00 cm
Ix = 92080.00 cm4
Iy = 3390.00 cm4
Sx = 3070.00 cm3
Sy = 308.00 cm3
rx = 24.30 cm
ry = 4.66 cm
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.
fca / Fc = 0.15
Cmx = 0.85
A1 = 1.00
Cmy = 1.00
A2 = 1.00
Bldg. 2, Block 10, El Sefarat District Calc. By Date Checked By Date Rev.