You are on page 1of 5

Resume of NAME

*******************@gmail.com

Contact: +91*************

SUMMARY
• 7 years 2monthsof comprehensive SAP–ABAP/Workflow experience with full 5 life cycle
implementations, 3 Enhancement Project and 3 upgrade in each of the areas of my expertise.
• A comprehensive Onsite Experience about 1.5 years years in Implementation, Upgrade and
Support
• With a rich industry background with substantial knowledge in Pharmaceutical, Utility industry,
Aerospace Leasing, Global Trade management.
• Worked on SAP- SD, FI, MM, PM & IS- Utilities Modules.
• Worked on workflow for HCM Forms.
• Having excellent working knowledge of ABAP/4 Development Workbench Tools.
• Worked on ABAP/Workflow,ABAP-ISU.

EMPLOYMENT HISTORY

Date Company Name Role

July/2015 - Present [Company Name] Senior Consultant

Sep/2008 – July/2015 [Company Name] Senior Consultant

QUALIFICATIONS

Level Subject College / University

Degree BTECH BPUT

ACHIEVEMENT

Organizational O2 Award / 2014 , [Company Name]


CMMI level Got Certificate for CMMI
Training Webdynpro training, Workflow ,IS-Utilities

SKILLS

Process SAP- Implementations, Support and Upgrade (PM Smart & APSE tool)
Technology SAP-ABAP
SAP ABAP ,Unicode Upgrade, EMIGAL , LSMW, Business Object, Workflow,Webdynpro
Languages English

PROJECTS

Company Project Duration Role


RWEGROUP (NPOWER) Implementation July/2015 to Till date ABAP Technical Lead

NFG,USA Implementation July-2014 to July-2015 ABAP Technical Lead


Leo Pharma, Denmark Implementation Sept-2013 to july-2014 ABAP Workflow lead
Bank of Ireland ,Ireland Enhancement June-2013-Sept-2013 Technical
Developer(Offshore)
ROKKO, Denka Japan Rollout Feb 2013 to June 2013 Technical Developer(Onsite)
Hissan , Denka Japan Implementation Feb 2012 to Feb 2013 Technical Developer(Onsite)
Union Pacific Implementation Dec 2010 to Jan 2012 Technical Developer (Onsite)
Railroad,USA
Uniting Care Health, Upgrade Oct 2010 to Dec 2010 Technical Developer
Australia (Offshore)
Corning, USA Upgrade March 2010 to Sep 2010 Technical Developer
(Offshore)
Modus Link Global Enhancement Nov 2009  to  Mar 2010 Technical Developer
Solutions / Sony Ericsson (Offshore)
The Irvine Company , Enhancement Apr 2009  to  Oct 2009 Technical Developer
USA (Offshore)
Pratt & Whitney Canada Implementation Jan 2009 to Apr 2009 Technical Developer
(Offshore)
Armstrong,USA Upgrade Oct- 2008 to Jan-2009 Technical Developer
(Offshore)

PROJECT DETAILS

Company RWE GROUP (NPOWER),UK (IS-UTILITIES Implementation)


Responsibilities
• Lead the Technical team from offshore, Develop complex programs and Workflow.
Deliverables

Created several function modules also have done changes


• Downloaded the data into application server and also read the
data from application server.
• Worked on BAPI.
• Worked on outbound proxy that is passed the data via proxy
to the another system and inbound proxy that is received the
data via proxy from another system
• Worked on Idoc.
• Worked on EMMA Case And Application Log.
• Worked on ISU module as part of the team responsible for developing
reports , function modules and supporting for the project.

Company NFG,USA (IS-UTILITIES Implementation)


Responsibilities
• Lead the Technical team from offshore, Develop complex programs and Workflow.
Deliverables
• Provided solution for issues in areas for IS-U
• Worked on Enhancements ,Reports
• Worked on Proxy

Company Leo Pharma, (Implementation)


Responsibilities
• Lead the Technical Workflow team from Offshore, Develop Workflow for HCM forms.
Deliverables
• Worked on HCM forms and Workflows
• Worked on workflow for POL Notification
• Worked on Reports.
• Worked on BADI for POL
• Developed PDD Enhancements
Company Bank of Ireland , (Enhancement)
Responsibilities
• Worked as a Technical Developer from offshore. Technical Feasibility Study Proposed technical solutions,
Estimation of developments, development of ABAP objects. Worked in as a development Integration testing.
Deliverables
• Worked on workflow for POL Notification
• Worked on Reports.
• Worked on BADI for POL.

Company ROKKO , DKK Japan (Global Trade Rollout)


Responsibilities

• Worked as a Technical team member in Onsite Technical Feasibility Study, Proposed technical solutions, Estimation
of developments, development of ABAP objects. Worked in Onsite as a development Integration testing.
Deliverables
• Worked on Cost Allocation Report
• AR clearing Report
• Workflow method for Payment Preparation
• Interest Accrued report
• Bill Of Exchange Report

Company Hissan , DKK Japan (Global Trade Implementation)


Responsibilities

• Worked as a Technical team member in Onsite Technical Feasibility Study, Proposed technical solutions, Estimation
of developments, development of ABAP objects. Worked in Onsite as a development Integration testing.
Deliverables
• Worked on Cost Allocation Report
• AR clearing Report
• Workflow method for Payment Preparation
• Interest Accrued report
• Bill Of Exchange Report

Company Union Pacific Railroad, USA (Implementation PM and MM module for


MRO)
Responsibilities
• Technical Feasibility Study, Proposed technical solutions, Estimation of developments, Technical specification
creation , development of ABAP objects and unit test document creation.
Deliverables
• Data migration of the legacy material master record to SAP. Legacy sources come from MMS, E-Proc, and PC Warehouse.
Upload method will use SAP standard LSMW transaction. There will be one mapping template to be utilized for all three
sources of data. However, each will have its own transformation rules and upload files. Also delivered Equipment Master .
• Data Migration to Upload Vendor Master and Contacts through BDC.
• Worked on Enhancement Spot to add a new field in the selection screen as well as in the output for the standard transaction
MB52.
• Worked on User exit to add a button in standard transaction MD04 for inventory turnover.
• Worked on Abap Webdynpro for MRP Update and Storage bin update.
• Standard WD Enhancement of Maintenance Order Creation, Change and Display. Standard WD Enhancement of
Maintenance Notification Creation ,Change and Display Standard WD Enhancement Equipment Overview .
• Migration for MRP Area using IDoc (Intermediate Document).
• Migration for Material Classification using Direct Input.
• Migration for Material Inspection Text using Direct Input.
• Migration for Material Basic Data and Purchasing Long Text using Direct Input

Company Uniting Care Health, Australia (Upgrade 4.7 to ECC Non-Unicode)


Responsibilities
• Estimation, SPDD, SPAU adjustment and provide solution for Upgrade errors for customized objects.
Deliverables

• SPDD Adjustments during Basis Upgrade/ SPAU Correction/ Upgrade Correction of objects
Company Corning, USA (Upgrade Cable Solution to DIMP)
Responsibilities
• Worked as Technical team from Offshore. Role: Technical Feasibility Study , Proposed technical solutions.
Deliverables
• SPDD Adjustments during Basis Upgrade/SPAU Correction
• Unicode Correction of custom objects including
• Developed New RICEF for DIMP Enhancements

Company Modus Link Global Solutions / Sony Ericsson(Enhancement)


Responsibilities
• Worked as a Technical team member from Offshore. Technical Feasibility Study, Proposed technical solutions,
Estimation of developments , development of ABAP objects.

Deliverables
• Reviewing Technical Specifications.
• Initiating Development Kick Off.
• Worked on Technical Objects Spanning from Module Pool, Badi, User Exit, Function Modules, Workflow, and
Reports.
• Project Status Tracking and Attending Management meeting for communicating development phase and addres
concerns raised by client team.

Company The Irvine Company (Enhancement)


Responsibilities
• Worked as a Technical team member from Offshore. Technical Feasibility Study, Proposed technical solutions,
Estimation of developments , development of ABAP objects.

Deliverables
• Proposed the workflow document according to Business scenario
• Design the workflow.
• Developed the Workflow.
• Created the Business Object for the Workflow.
• Created the Function Module which is required for the workflow.
• Developed the RFC for Sourcing Cockpit, Purchase Order which gets triggered from the Portal

Company Pratt & Whitney Canada (Leasing Implementation)


Responsibilities
• Worked as the Technical team from Offshore. Role: Proposed technical solutions, Preparation technical
specification, Estimation of developments & development of ABAP objects, worked on data migration .
• .
Deliverables
• Developed a Cross application (PM, SD, MM) report called Engine available report with interactive facilities.
• Developed Enhancement for Equipment installation and Dismantle at a Functional Location using BAPI in user exit
of T’code VL02.
• Developed Enhancement to change Equipment Use Status during various transactions like (PGR, PGI, and MIGO).
• Developed SAP Script for Engine Movement for Shipping party (DHL) called EMF.
• Developed Email Alert to the Sales User group with PDF attachment called Pre Alert SO.
Company Armstrong ,USA(Upgrade)
Responsibilities
• Worked on a Unicode Upgrade project..
• Maintained documentation for each and every object worked on.
•  Created a document listing out the obsolete statements and function modules of 4.6 C version and sample codes of
new statements and functional modules to be inserted in place of the obsolete ones in the new version ECC 6.0.
• Thorough study of nature of the project viz. the up gradation procedure from 4.6C to ECC 6.0 and the concept of
Unicode. Understanding Client Instruction Manual which documented the steps that are to be carried out in the
course of the project.
• .
Deliverables
• To check the syntax error.
• To check the Unicode in Reports
• Change the Obsolete Code which does not support in ECC6.0..
• To change the obsolete table which doesn’t support in ECC 6.0.

You might also like