Drawing (1)

Lifting Plan No: LP022


Stability @ horizontal boom

51.13mtr 

5.49mtr 
846.15 ton 
12.33mtr  149.03 ton 

995.18 ton 

846.15 * 5.49 + 149.04 * 51.13 = 995.18 * 12.33
12,265.7787          12,270.5694                          Ok

Bending zone

STS Relative centerline

15.4 51.13mtr as per NCSC1146

48.722mtr to bending line
Machine 
house

5.49mtr  2.2
12.605
12.33mtr  17.4 4.5 15.142
1.1

5. 25.472 5.758
0.5

20.9
2
38.3
50.3

27.472

Approvals & Signatures ‫ﺍﻻﻋﺗﻣﺎﺩ ﻭﺍﻻﻣﺿﺎءﺍﺕ‬


Planned By: Signature: Date:
Hassan Ramadan 8-Feb-2023
‫ﺍﻋﺩﺍﺩ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬ ‫ﺍﻟﺗﺎﺭﻳﺦ‬
Reviewed By: Signature:
Mahmoud Elhelw
‫ﻣﺭﺍﺟﻌﺔ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬
Drawing (2)
Lifting Plan No: LP022
Stability @ vertical boom

32.71mtr 

15.4

Machine 
house

5.49mtr 
9.57mtr 
32.71mtr 

5.49mtr 
149.03 ton 
846.15 ton 
9.57mtr 

995.18 ton 

846.15 * 5.49 + 149.04 * 32.71 = 995.18 * 9.57
9,520.4619           9,523.8726                        Ok

Approvals & Signatures ‫ﺍﻻﻋﺗﻣﺎﺩ ﻭﺍﻻﻣﺿﺎءﺍﺕ‬


Planned By: Signature: Date:
Hassan Ramadan 8-Feb-2023
‫ﺍﻋﺩﺍﺩ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬ ‫ﺍﻟﺗﺎﺭﻳﺦ‬
Reviewed By: Signature:
Mahmoud Elhelw
‫ﻣﺭﺍﺟﻌﺔ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬
Drawing (3)
Lifting Plan No: LP022
Stability @ Bending boom

Xfs ‐‐ X fixed structure
Xb ‐‐‐ X boom
Xt  ‐‐ X total

Xbnew  ‐‐ X boom after bend
Xtnew  ‐‐ X total after bend

ΔXt ‐‐ Change in X total

Xb

Xbnew

Xb

Xbnew ΔXb
Machine 
house

Xfs

5.49mtr 
Xtnew 149.03 ton 
Xt Xtnew ΔXt

25.472
Xt
9.57mtr 
995.18 ton 
846.15 * Xfs + 149.04 * Xb = 995.18 * Xt 1

846.15 * Xfs + 149.04 * Xbnew = 995.18 * Xtnew
27.472
846.15 * Xfs + 149.04 * (Xb ‐ ΔXb) = 995.18 * (Xt ‐ ΔXt)
846.15 * Xfs + 149.04 * Xb ‐ 149.04 * ΔXb = 995.18 * Xt ‐ 995.18 * ΔXt
995.18 * Xt ‐ 149.04 * ΔXb = 995.18 * Xt ‐ 995.18 * ΔXt
149.04 * ΔXb =  995.18 * ΔXt
ΔXb =  6.677 * ΔXt

If,   ΔXt = 4mtr
ΔXb =  6.677 * 4 
ΔXb =  26.7mtr 
Impossible

Approvals & Signatures ‫ﺍﻻﻋﺗﻣﺎﺩ ﻭﺍﻻﻣﺿﺎءﺍﺕ‬


Planned By: Signature: Date:
Hassan Ramadan 8-Feb-2023
‫ﺍﻋﺩﺍﺩ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬ ‫ﺍﻟﺗﺎﺭﻳﺦ‬
Reviewed By: Signature:
Mahmoud Elhelw
‫ﻣﺭﺍﺟﻌﺔ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬
Drawing (4)
Lifting Plan No: LP022
Load shearing @ boom horizontal & bend position

Xfs ‐‐ X fixed structure
Xb ‐‐‐ X boom Due to bending @
If,   ΔXt = 9.57‐9.4 mtr = 0.17 mtr
Xth  ‐‐ X total @boom horizontal ΔXtm =  12.33 ‐ 9.4 mtr = 2.93 mtr
Xtv  ‐‐ X total @boom vertical From horizontal to 
Xbnew  ‐‐ X boom after bend bending position,
Xtnew  ‐‐ X total after bend
ΔXt ‐‐ Change in X total
ΔXb ‐‐ Change in X boom
ΔXtm ‐‐ Change in X boom for Mobilization
Load shearing @ boom bending position
B,A = (995.18 * 9.4/27.472)/2 = 163 ton
D,C = (995.18 * 15.142/27.472)/2 = 314 ton
Xb
@ Boom
@ Boom 
bending position
Xbnew horizontal  position

27.472 D 27.472
D A
A 9.15
9.15 18.3
18.3
9.4
12.33 B
B C
C
995.18 ton  995.18 ton 
Land side Sea side
Machine 
house

Load shearing @ boom horizontal  position
B,A = (995.18 * 12.33/27.472)/2 = 214 ton
Xfs
D,C = (995.18 * 15.142/27.472)/2 = 263 ton

Xtnew 51.13mtr 
Xt
Xb
25.472
Xbnew ΔXb

Xth
12.33mtr 

27.472

Xfs
5.49mtr 
Xtnew ΔXt
9.4mtr  0.17mtr 
149.03 ton 
Xtv
9.57mtr 
995.18 ton 

Approvals & Signatures ‫ﺍﻻﻋﺗﻣﺎﺩ ﻭﺍﻻﻣﺿﺎءﺍﺕ‬


Planned By: Signature: Date:
Hassan Ramadan 8-Feb-2023
‫ﺍﻋﺩﺍﺩ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬ ‫ﺍﻟﺗﺎﺭﻳﺦ‬
Reviewed By: Signature:
Mahmoud Elhelw
‫ﻣﺭﺍﺟﻌﺔ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬
Drawing (5)
Lifting Plan No: LP022
COG @ with beam and brackets
27.472
Cases need to check   13.736 mtr 
STS @ Boom horizontal position COG = 12.33 mtr 12.33 mtr 
STS @ Boom bending position COG = 9.4 mtr
STS @ Boom vertical position COG = 9.57 mtr 9.4 mtr 
FS without boom COG = 5.49 mtr

Xtbb mtr 

Xtbb ‐ X sts with beam and brackets
1160.7ton

165.52ton 

STS @ Boom horizontal position COG = 12.33 mtr
995.18 * 12.33 + 165.52 * 13.736 = 1160.7 * Xtbb
Xtbb = 12.53mtr

STS @ Boom bending position COG = 9.4 mtr
995.18 * 9.4 + 165.52 * 13.736 = 1160.7 * Xtbb
Xtbb = 10.02mtr

STS @ Boom vertical position COG = 9.57 mtr
995.18 * 9.57 + 165.52 * 13.736 = 1160.7 * Xtbb
Xtbb = 10.16mtr
Machine 
house

FS without boom COG = 5.49 mtr


846.15 * 5.49 + 165.52 * 13.736 = 1011.67 * Xtbb
Xtbb = 11.66mtr
Xfs

Xtnew
Xt

25.472

27.472

13.736
2.43 9.521
1.78

Approvals & Signatures ‫ﺍﻻﻋﺗﻣﺎﺩ ﻭﺍﻻﻣﺿﺎءﺍﺕ‬


Planned By: Signature: Date:
Hassan Ramadan 8-Feb-2023
‫ﺍﻋﺩﺍﺩ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬ ‫ﺍﻟﺗﺎﺭﻳﺦ‬
Reviewed By: Signature:
Mahmoud Elhelw
‫ﻣﺭﺍﺟﻌﺔ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬