51.13mtr
5.49mtr
846.15 ton
12.33mtr 149.03 ton
995.18 ton
846.15 * 5.49 + 149.04 * 51.13 = 995.18 * 12.33
12,265.7787 12,270.5694 Ok
Bending zone
STS Relative centerline
15.4 51.13mtr as per NCSC1146
48.722mtr to bending line
Machine
house
5.49mtr 2.2
12.605
12.33mtr 17.4 4.5 15.142
1.1
5. 25.472 5.758
0.5
20.9
2
38.3
50.3
27.472
32.71mtr
15.4
Machine
house
5.49mtr
9.57mtr
32.71mtr
5.49mtr
149.03 ton
846.15 ton
9.57mtr
995.18 ton
846.15 * 5.49 + 149.04 * 32.71 = 995.18 * 9.57
9,520.4619 9,523.8726 Ok
Xfs ‐‐ X fixed structure
Xb ‐‐‐ X boom
Xt ‐‐ X total
Xbnew ‐‐ X boom after bend
Xtnew ‐‐ X total after bend
ΔXt ‐‐ Change in X total
Xb
Xbnew
Xb
Xbnew ΔXb
Machine
house
Xfs
5.49mtr
Xtnew 149.03 ton
Xt Xtnew ΔXt
25.472
Xt
9.57mtr
995.18 ton
846.15 * Xfs + 149.04 * Xb = 995.18 * Xt 1
846.15 * Xfs + 149.04 * Xbnew = 995.18 * Xtnew
27.472
846.15 * Xfs + 149.04 * (Xb ‐ ΔXb) = 995.18 * (Xt ‐ ΔXt)
846.15 * Xfs + 149.04 * Xb ‐ 149.04 * ΔXb = 995.18 * Xt ‐ 995.18 * ΔXt
995.18 * Xt ‐ 149.04 * ΔXb = 995.18 * Xt ‐ 995.18 * ΔXt
149.04 * ΔXb = 995.18 * ΔXt
ΔXb = 6.677 * ΔXt
If, ΔXt = 4mtr
ΔXb = 6.677 * 4
ΔXb = 26.7mtr
Impossible
Xfs ‐‐ X fixed structure
Xb ‐‐‐ X boom Due to bending @
If, ΔXt = 9.57‐9.4 mtr = 0.17 mtr
Xth ‐‐ X total @boom horizontal ΔXtm = 12.33 ‐ 9.4 mtr = 2.93 mtr
Xtv ‐‐ X total @boom vertical From horizontal to
Xbnew ‐‐ X boom after bend bending position,
Xtnew ‐‐ X total after bend
ΔXt ‐‐ Change in X total
ΔXb ‐‐ Change in X boom
ΔXtm ‐‐ Change in X boom for Mobilization
Load shearing @ boom bending position
B,A = (995.18 * 9.4/27.472)/2 = 163 ton
D,C = (995.18 * 15.142/27.472)/2 = 314 ton
Xb
@ Boom
@ Boom
bending position
Xbnew horizontal position
27.472 D 27.472
D A
A 9.15
9.15 18.3
18.3
9.4
12.33 B
B C
C
995.18 ton 995.18 ton
Land side Sea side
Machine
house
Load shearing @ boom horizontal position
B,A = (995.18 * 12.33/27.472)/2 = 214 ton
Xfs
D,C = (995.18 * 15.142/27.472)/2 = 263 ton
Xtnew 51.13mtr
Xt
Xb
25.472
Xbnew ΔXb
Xth
12.33mtr
27.472
Xfs
5.49mtr
Xtnew ΔXt
9.4mtr 0.17mtr
149.03 ton
Xtv
9.57mtr
995.18 ton
Xtbb mtr
Xtbb ‐ X sts with beam and brackets
1160.7ton
165.52ton
STS @ Boom horizontal position COG = 12.33 mtr
995.18 * 12.33 + 165.52 * 13.736 = 1160.7 * Xtbb
Xtbb = 12.53mtr
STS @ Boom bending position COG = 9.4 mtr
995.18 * 9.4 + 165.52 * 13.736 = 1160.7 * Xtbb
Xtbb = 10.02mtr
STS @ Boom vertical position COG = 9.57 mtr
995.18 * 9.57 + 165.52 * 13.736 = 1160.7 * Xtbb
Xtbb = 10.16mtr
Machine
house
Xtnew
Xt
25.472
27.472
13.736
2.43 9.521
1.78