You are on page 1of 9

BAB III

URAIAN HASIL PRAKTIKUM


1. Sondir
Sondir - Pengolahan Data
Proyek : Sondir Sondir No :
Lokasi : Lapangan Depan Hanggar Aer Elevasi :
Dikerjakan oleh : Kelompok B3 MAT :
Tanggal : 6-Feb-13

Depth Cw Tw Kw qc LF LF x 20 cm JHP Fr
(m) (kg/cm ) (kg/cm ) (Tw - Cw) (kg/cm ) (kg/cm )
2 2 2 2
(kg/cm) (kg/cm) (%)
0 0 0 0 0 0 0 0 0
0.2 0 0 0 0 0 0 0 0
0.4 5 9 4 5 0.36 7.20 7.20 7.20
0.6 9 12 3 9 0.27 5.40 12.60 3.00
0.8 8 10 2 8 0.18 3.60 16.20 2.25
1 9 12 3 9 0.27 5.40 21.60 3.00
1.2 9 12 3 9 0.27 5.40 27.00 3.00
1.4 9 12 3 9 0.27 5.40 32.40 3.00
1.6 16 30 14 16 1.26 25.20 57.60 7.88
1.8 15 30 15 15 1.35 27.00 84.60 9.00
2 9 15 6 9 0.54 10.80 95.40 6.00
2.2 9 11 2 9 0.18 3.60 99.00 2.00
2.4 8 10 2 8 0.18 3.60 102.60 2.25
2.6 4 10 6 4 0.54 10.80 113.40 13.50
2.8 9 14 5 9 0.45 9.00 122.40 5.00
3 10 14 4 10 0.36 7.20 129.60 3.60
3.2 10 13 3 10 0.27 5.40 135.00 2.70
3.4 10 12 2 10 0.18 3.60 138.60 1.80
3.6 10 11 1 10 0.09 1.80 140.40 0.90
3.8 8 9 1 8 0.09 1.80 142.20 1.13
4 11 12 1 11 0.09 1.80 144.00 0.82
4.2 12 14 2 12 0.18 3.60 147.60 1.50
4.4 19 20 1 19 0.09 1.80 149.40 0.47
4.6 20 24 4 20 0.36 7.20 156.60 1.80
4.8 14 22 8 14 0.72 14.40 171.00 5.14
5 19 24 5 19 0.45 9.00 180.00 2.37
5.2 22 27 5 22 0.45 9.00 189.00 2.05
5.4 12 19 7 12 0.63 12.60 201.60 5.25
5.6 16 24 8 16 0.72 14.40 216.00 4.50
5.8 14 20 6 14 0.54 10.80 226.80 3.86
6 12 21 9 12 0.81 16.20 243.00 6.75
6.2 44 52 8 44 0.72 14.40 257.40 1.64
6.4 150 185 35 150 3.15 63.00 320.40 2.10
Da = 3.65 cm
Db = 3.6 cm Ac = 10.17 cm2
Dpl = 3.6 cm Apl = 10.17 cm2
L = 9.5 cm
Lokasi :
MAT :
Tanggal :
Titik :

Depth qc JHP Fr
(m) (kg/cm2) (kg/cm) (%)
0.00 0 0.00 0.00
0.20 0 0.00 0.00
0.40 5 7.20 7.20
0.60 9 12.60 3.00
0.80 8 16.20 2.25
1.00 9 21.60 3.00
1.20 9 27.00 3.00
1.40 9 32.40 3.00
1.60 16 57.60 7.88
1.80 15 84.60 9.00
2.00 9 95.40 6.00
2.20 9 99.00 2.00
2.40 8 102.60 2.25
2.60 4 113.40 13.50
2.80 9 122.40 5.00
3.00 10 129.60 3.60
3.20 10 135.00 2.70
3.40 10 138.60 1.80
3.60 10 140.40 0.90
3.80 8 142.20 1.13
4.00 11 144.00 0.82
4.20 12 147.60 1.50
4.40 19 149.40 0.47
4.60 20 156.60 1.80
4.80 14 171.00 5.14
5.00 19 180.00 2.37
5.20 22 189.00 2.05
5.40 12 201.60 5.25
5.60 16 216.00 4.50
5.80 14 226.80 3.86
6.00 12 243.00 6.75
6.20 44 257.40 1.64
6.40 150 320.40 2.10
GRAFIK SONDIR

Proyek : Sondir Sondir No :


Lokasi : Lapangan Depan Hanggar Aero Elevasi :
Dikerjakan oleh : Kelompok B3 MAT :
Tanggal : 6-Feb-13

0 50 100 150
0.00

1.00

2.00

3.00
Depth [m]

4.00

5.00

6.00

7.00

8.00

qc [kg/cm2 ]
9.00
8.00

qc [kg/cm2 ]
9.00
0 200 400 600 800 1000 0 5 10 15 20 25 30 35 40 45
JHP qc
JHP [kg/cm] FR [%]
LABORATORIUM UJI TANAH
JURUSAN TEKNIK SIPIL - POLITEKNIK NEGERI BANDUNG

Da = 3.65 cm Fr (%)Perkiraan Jenis Tanah


Db = 3.6 cm Ac = 10.17 cm2 0-0,5 Kerikil
Dpl = 3.6 cm Apl = 10.17 cm2 0,2-2 Pasir
L = 9.5 cm 2,0-5 Lanau
>5 Lempung

No. Depth Cw Tw Kw qc Lf Lf x 20 JHP Fr


(m) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm ) 2
(kg/cm) (kg/cm) (kg/cm) (%)
1 0 0 0 0 0 0 0 0 0
2 0.2 0 0 0 0 0 0 0 0
3 0.4 5 9 4 5 0.36 7.20 7.20 7.20
4 0.6 9 12 3 9 0.27 5.40 12.60 3.00
5 0.8 8 10 2 8 0.18 3.60 16.20 2.25
6 1 9 12 3 9 0.27 5.40 21.60 3.00
7 1.2 9 12 3 9 0.27 5.40 27.00 3.00
8 1.4 9 12 3 9 0.27 5.40 32.40 3.00
9 1.6 16 30 14 16 1.26 25.20 57.60 7.88
10 1.8 15 30 15 15 1.35 27.00 84.60 9.00
11 2 9 15 6 9 0.54 10.80 95.40 6.00
12 2.2 9 11 2 9 0.18 3.60 99.00 2.00
13 2.4 8 10 2 8 0.18 3.60 102.60 2.25
14 2.6 4 10 6 4 0.54 10.80 113.40 13.50
15 2.8 9 14 5 9 0.45 9.00 122.40 5.00
16 3 10 14 4 10 0.36 7.20 129.60 3.60
17 3.2 10 13 3 10 0.27 5.40 135.00 2.70
18 3.4 10 12 2 10 0.18 3.60 138.60 1.80
19 3.6 10 11 1 10 0.09 1.80 140.40 0.90
20 3.8 8 9 1 8 0.09 1.80 142.20 1.13
21 4 11 12 1 11 0.09 1.80 144.00 0.82
22 4.2 12 14 2 12 0.18 3.60 147.60 1.50
23 4.4 19 20 1 19 0.09 1.80 149.40 0.47
24 4.6 20 24 4 20 0.36 7.20 156.60 1.80
25 4.8 14 22 8 14 0.72 14.40 171.00 5.14
26 5 19 24 5 19 0.45 9.00 180.00 2.37
27 5.2 22 27 5 22 0.45 9.00 189.00 2.05
28 5.4 12 19 7 12 0.63 12.60 201.60 5.25
29 5.6 16 24 8 16 0.72 14.40 216.00 4.50
30 5.8 14 20 6 14 0.54 10.80 226.80 3.86
31 6 12 21 9 12 0.81 16.20 243.00 6.75
32 6.2 44 52 8 44 0.72 14.40 257.40 1.64
33 6.4 150 185 35 150 3.15 63.00 320.40 2.10
G

kiraan Jenis Tanah

Perkiraan
Jenis Tanah
-
-
Lempung
Lanau
Lanau
Lanau
Lanau
Lanau
Lempung
Lempung
Lempung
Lanau
Lanau
Lempung
Lempung
Lanau
Lanau
Pasir
Pasir
Pasir
Pasir
Pasir
Kerikil
Pasir
Lempung
Lanau
Lanau
Lempung
Lanau
Lanau
Lempung
Pasir
Lanau