Design Drawing
For Smartfren LTE project
ZSLO_1034
Vendor ID : ZSLO_1034
Site ID : SOL0167
Surveyor : Ali
Note:It is forbidden to operate on customer`s network until customer permission and confirmation is
obtained.
Page 2 of 13
Doc. Name:Site Survey detailed site-wise design
Mounting antenna available NA Available Length pipe/boom : ……….m and qty : ……..pcs
Remarks __________________________________________________________________________
Remarks __________________________________________________________________________
Page 3 of 13
Doc. Name:Site Survey detailed site-wise design
Others :_______________
__________
Power Equipment Type Qty.
Rectifier Rack Proposed ZXDU68 W201 1
Rectifier Module Proposed ZXDR B8200 3
DC
Power Battery Proposed 2*100AH 2
DC Distribution N/A
Breaker N/A
AC
AC Distribution Box
ACPDB to BTS AC cable Length (Rectifier cabinet) : 9M
DC cable from rectifier to BBU : 8M
BTS to Grounding Bar (eNB plinth to Nearest Grounding Bar) : 8M
New Antenna
Sector No Pole No Ant Model Pole Height Ant Height Azimuth Down tilt
1 1 BA-B7B74Q7X90V-00 40 90 2/2
Antenna Type 2 1 BA-B7B74Q7X90V-00 40 180 2/2
3 1 BA-B7B74Q7X90V-00 40 320 2/2
4
5
Remarks _________________________________________________________________________________________________________________
Page 4 of 13
Doc. Name:Site Survey detailed site-wise design
17 Other YES 1
2 30 degree YES 1
3 60 degree YES 1
4 90 degree YES 1
Page 5 of 14
Doc. Name:Site Survey detailed site-wise design
Page 6 of 14
Doc. Name:Site Survey detailed site-wise design
4 Site photo
S : -7.38713
E : 110.78080
1. Site Overview Photo(ground) 2. Tower overview photo(from groud to tower top) 3. GPS photo
N/A
4. Existing main MCB at KWH meter 5. Existing ACPDB 6. Existing AC Current Load
7. Existing Rectifier Cabinet 8. Existing DC Current Load 9. Existing DCPDB internal (at rectifier rack)
10. Existing DCPDB external (outside rectifier rack) 11. Existing Battery System 12. Existing Transmission Equipment
Page 7 of 13
Doc. Name:Site Survey detailed site-wise design
N/A
13. Existing Cable Tray/ladder(from BBU to Tower) 14. Existing Indoor Grounding Bar 15. Existing Outdoor Grounding Bar
N/A N/A
Page 8 of 13
Doc. Name:Site Survey detailed site-wise design
13. Antenna azimuth sector 1 14. Antenna azimuth sector 2 15. Antenna azimuth sector 3
16. Antenna Mechnical down tile sector 1 17. Antenna Mechnical down tile sector 2 18. Antenna Mechnical down tile sector 3
N/A N/A
1. Proposed New BBU location 2. Proposed new Rectifier System location 3. Proposed New RF Antenna and height
Page 9 of 13
Doc. Name:Site Survey detailed site-wise design
ACPDB SMARTFREN
PROPOSED
PROPOSED
FOUNDATION SMARTFREN
2000 X 1300 MM
PROPOSED
ZXDU68 W201
PROPOSED
CONTROL
BOX SMARTFREN
PROPOSED
FOUNDATION SMARTFREN
2000 X 1300 MM
PROPOSED
ZXDU68 W201
PROPOSED
CONTROL
BOX SMARTFREN
Page 10 of 13
Doc. Name:Site Survey detailed site-wise design
±42.0 M.A.G.L
Page 11 of 13
Doc. Name:Site Survey detailed site-wise design
ACPDB SMARTFREN
PROPOSED
PROPOSED
FOUNDATION SMARTFREN
2000 X 1300 MM
PROPOSED
ZXDU68 W201
PROPOSED
CONTROL
BOX SMARTFREN
Battery
Lithium
100AH
Battery
Lithium
100AH
Page 12 of 13
Doc. Name:Site Survey detailed site-wise design
R8978
PRO POS ED ANT ENNA LT E 850 & 2300 MHz
12 por ts (BA-B7B74Q7X90V-00 ) on 40 m
R8862A Filter
BS8200 R8978
(TDD+FDD) PRO POS ED ANT ENNA LT E 850 & 2300 MHz
12 por ts (BA-B7B74Q7X90V-00 ) on 40 m
R8862A Filter
R8978
PRO POS ED ANT ENNA LT E 850 & 2300 MHz
12 por ts (BA-B7B74Q7X90V-00 ) on 40 m
R8862A Filter
ZXDU68
W201
See TX Database
Legend :
DC Power Cable
Fiber Optic
Jumper 1/2"
Page 13 of 13
秘密▲
<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 共1⻚,第1⻚
Design Pack New Site Drawing
ZSLO_1034/ GENENG
29 Mei 2020
REMARKS
DESIGN PACK
APPROVED BY
N
NW
NE
W
E
SE
SW
S
PREPARED BY
PROJECT NAME
Smartfren Project
Approved by : Sign.
Checked by : Sign.
PROPOSED
FOUNDATIONSMARTFREN ZSLO_1034 / GENENG
2000X1300MM
Scale :
REGION : Central Java
nts
PROPOSED
ZXDU68W201
Ref. : Drawing
No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG
01
DRAWING TITLE
Site Layout A4
REMARKS
DESIGN PACK
APPROVED BY
PROPOSED
ACPDB SMARTFREN
PROPOSED PREPARED BY
FOUNDATION SMARTFREN
2000 X 1300 MM PROJECT NAME
Smartfren Project
PROPOSED
ZXDU68 W201 Approved by : Sign.
Checked by : Sign.
Scale :
REGION : Central Java
PROPOSED Ref. : Drawing
1:30
CONTROL
No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 02
DRAWING TITLE
Equipments Layout A4
PROPOSED RRU TDD
HEIGHT ±40.0 On Mounting
PROPOSED RRU FDD PROPOSED ANTENNA RF SMARTFREN 12
HEIGHT ±40.0 On Mounting H : ±40.0 M.A.G.L LEG A,C,D REMARKS
PROPOSED FILTER
HEIGHT ±40.0 On Mounting N
NW
NE
PROPOSED MW SF
E
SE
SW
S
DESIGN PACK
APPROVED BY
PREPARED BY
PROJECT NAME
Smartfren Project
Approved by : Sign.
Checked by : Sign.
Scale :
REGION : Central Java
nts
Ref. : Drawing
No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 03
1 New Creation
Ground Level
±42.0 M.A.G.L
DRAWING TITLE
Antenna placement A4
Information
PROPOSED RRU TDD
HEIGHT ±40.0 On Mounting REMARKS
PREPARED BY
PROJECT NAME
Smartfren Project
Approved by : Sign.
Checked by : Sign.
Scale :
REGION : Central Java
NTS
Ref. : Drawing
09 No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 04
1 New Creation
N
NW
NE
W
E
SE
SW
S
DRAWING TITLE
RRU Placement A4
Information
REMARKS
DESIGN PACK
APPROVED BY
PREPARED BY
PROJECT NAME
Smartfren Project
Approved by : Sign.
Checked by : Sign.
Ref. : Drawing
No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 05
PROPOSED
ZXDU68W201 Ed. Description Date : Drawn by :
1 New Creation
PROPOSED
CONTROL DRAWING TITLE
BOX SMARTFREN
Routing Cable Layout A4
REMARKS
DESIGN PACK
APPROVED BY
BPN2
PM5 FAN
BPL1
SAO CCFO
GPS
to PM BBU to RRU TDD to RRU FDD to MW to Dry Contact to FAN
63A 25A 25A 25A 25A 25A 25A 25A 20A 16A 16A 16A 16A 16A 16A 16A 16A 100A
PREPARED BY
BATT1 BATT2
DC SPD LLVD1 BLVD
ZXD3000 ZXD3000
ZXD3000
PROJECT NAME
Smartfren Project
Approved by : Sign.
Battery
Lithium Checked by : Sign.
100AH
Checked by ( PT. ZTE) : Sign.
Scale :
REGION : Central Java
nts
Ref. : Drawing
08 No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 06
Battery Ed. Description Date : Drawn by :
100AH
DRAWING TITLE
Door Open DB 25
8 Cabinet/Shelter ZTE
Pin 8 -21
End B3
PROJECT NAME
Smartfren Project
Convertor
① ② ③ ④ ⑤ ⑥ ⑦ ⑧ Approved by : Sign.
0.3mm2 black single core heat resistant
1.0mm2 black dual core heat resistant
Scale :
REGION : Central Java
Flexible power cable
NTS
Ref. : Drawing
06 No.:07 Unit : mm
BTS/DP/ ZSLO_1034/GENENG
1 New Creation
BS8200 R8978
(TDD+FDD) PROPOSED ANTENNA LTE 850 & 2300 MHz
12 ports (BA-B7B74Q7X90V-00) on 40 m
R8862A Filter
R8978
PROPOSED ANTENNA LTE 850 & 2300 MHz
12 ports (BA-B7B74Q7X90V-00) on 40 m PREPARED BY
R8862A Filter
PROJECT NAME
-48V Smartfren Project
ZXDU68
W201
Approved by : Sign.
-48V TX
See TX Database ODU Use New MW
RX
Checked by : Sign.
Scale :
Legend: REGION : Central Java
NTS
Ref. : 07 Drawing
DC Power Cable BTS/DP/ ZSLO_1034/GENENG
No.: Unit : mm
08
Fiber Optic
Ed. Description Date : Drawn by :
Jumper 1/2"
1 New Creation
DRAWING TITLE
Block Diagram A4