Technical Site Survey Report And

Design Drawing
For Smartfren LTE project
ZSLO_1034

Vendor ID : ZSLO_1034

Site ID : SOL0167

Site Name : Geneng

Subcon Contact Person : DAP

Surveyor : Ali

Survey Date : 21-May-20

Propose Configuration : NEW INFILL TDD(8T8R)+FDD(4T2R)

Note:It is forbidden to operate on customer`s network until customer permission and confirmation is
obtained.

SOW_TSSR_Design Drawing_ZSLO_1034_Geneng/Cover Page 1 of 13


Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034

SITE LOCATION MAP


(GOOCLE MAP)

Page 2 of 13
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034
1 Current Information
1.1 Site Information
Survey Items Survey Contents
Site ID SOL0167 Site Name Geneng
Site Location Information Address Jl. Pelem No.rt12, Kebayanan I, Geneng, Kec. Miri, Kabupaten Sragen, Jawa Tengah 57276.
Longitude (E) 110.78080 Latitude (S) -7.38713
Property Type Equipment Room Location Installation Type
High Rise Bldg Rooftop Fan room Shelter
Gov. Premises Greenfield Meter room Equipment room
Public Housing Water tank Other: Cabinet/ODC
Site Environment Checking Greenfield Building Floor no Specify _________________ Other:
Ruko Elevator room Specify _________________
MCP On Pole `
Other: Pump room
Specify _________________
Office
Site Owner/Principle owner IBS
Defined by coverage Macro Micro/SmallCell/Shooter In Building
Defined by location Indoor/Shelter Outdoor
Site type: Rooftop Greenfield Core Site
Site Type 3 Legged 4 Legged Monopole RT Pole
Tower type:
Guyed Must Camouflage Others Specify ____________
Tower/Pole Height (m) (AGL) 42 m Building Height: m
Outdoor foundation / PAD NA Available W*D Specify ……m x …..m
Shelter/RooM Building NA Available H*W*D Specify ……m x ….m x ….m
Remarks

1.2 Existing Equipment Information


Existing equipment TDD+FDD TDD Only FDD Only
AC DC
PLN Voltage: V Voltage VDC
PLN Capacity : KVA Current Load A
Main Breaker rate at KWH : A Max Rectifier Module Qty Pcs
Single Phase Three Phases Rectifier Module Equipped Pcs
Current Load R R A Each Rectifier Module Capacity A
S A Max Battery Bank Qty Bank
T A Battery Bank Equipped Qty Bank
Power Supply Rectifier MCB cap at ACPDB A Each Battery Capacity Ah

1P Spare MCB at ACPDB LLVD 1 MCB Spare


Qty Qty
Cap Cap
3P Spare MCB at ACPDB LLVD 2 MCB Spare
Qty Qty
Cap Cap
Fix Genset Available Not Available Capacity : KVA
Main Grounding bar Qty / number of port (Outdoor): __1Pcs__ / __14Port_ Length from Grouding bar to BBU (m) /
Grounding Main Grounding Bar Qty / number of port (Indoor) 2Pcs / 14 Port Length from Grouding bar to BBU (m) 8M
Tower/Pole Grounding bar Qty / number of port : 1Pcs / 14Port Length from Grouding bar to RRU (m) 7M
Transmission Type MW Optical Sharelink Others Specify ____________
Tower/Pole No Diameter Antenna Height (AGL) Type Pole No Azimuth
1
2
Transmission 3
IDU Brand Capacity FE Sye ID
1
2
3
Length of GPS Cable to BTS 25 M
Existing GPS System
GPS Antenna Height (AGL) 14
Remark _________________________________________________________________________________________________________________

1.3 Existing Feeder and Antenna Information,


Antenna Type TDD+FDD TDD Only FDD Only
Sector No. Model Azimuth (º) Downtilt (º) Ant. Height (m)* Jumper length (m) Feeder length (m) Remark
1
2
3
4
Remark *) Building+Pole/ Tower (m)
Antenna Type(extra antenna) TDD+FDD TDD Only FDD Only
Outdoor Antenna and
Cable/Feeder Ant No. Model Azimuth (º) Downtilt (º) Ant. Height Jumper length (m) Feeder length (m) Remark
1
2
3
4
Remark *) Building+Pole/ Tower (m)
Tray cable from euipment to antenna available NA Available Width cable tray : ……….cm.

Mounting antenna available NA Available Length pipe/boom : ……….m and qty : ……..pcs

Remarks __________________________________________________________________________

Space available for new equipment (indoor/outdoor): Yes No


Civil work Outdoor foundation / PAD Concrete Steel Base Frame W*D Specify ……m x …..m
Shelter/RooM Building Brick Wall Wall Shelter H*W*D Specify ……m x ….m x ….m

Remarks __________________________________________________________________________

Page 3 of 13
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And Design


Drawing
For Smartfren LTE project
ZSLO_1034
2 New Equipment Information
2.1 Summary
New Equipment for LTE (eNodeB) without Power
New Equipment for LTE (eNodeB) including Power
Implementation summary
TDD / FDD Upgrade
Sectorization

2.2 Preliminary Solution


BBU INSTALLATION LOCATION
Indoor Outdoor
BBU in new 19 Rack BBU in new Power system cabinet
Site Configuration
BBU in existing 19 Rack BBU on top ODC (min space 1600mm from top cabinet to canopy)
information
BBU in new Power system cabinet Others BBU In Cabinet Balitower
BBU in existing Power system cabinet

Others :_______________
__________
Power Equipment Type Qty.
Rectifier Rack Proposed ZXDU68 W201 1
Rectifier Module Proposed ZXDR B8200 3
DC
Power Battery Proposed 2*100AH 2
DC Distribution N/A
Breaker N/A
AC
AC Distribution Box
ACPDB to BTS AC cable Length (Rectifier cabinet) : 9M
DC cable from rectifier to BBU : 8M
BTS to Grounding Bar (eNB plinth to Nearest Grounding Bar) : 8M

ID OD Cable Routing Sct1 Sct2 Sct3 Sct4 Sct5 Sct6


ID OD DC Rectifier-RRU cable length (m) 60 60 60
Cable
ID OD BBU-RRU Optical fiber length (m) 60 60 60
ID OD Jumper cable RRU-Filter (m) 2 2 2
ID OD Jumper cable RRU-Antenna (m) 5 5 5
ID OD RRU GND to Nearest Ground bar (m) 7 7 7
BBU Transmission Cable Required No Yes Length m ________
Items Existing Proposed Length/Height (m)
Proposed GPS System GPS Cable 25

GPS Antenna Height 11+ 6

New Antenna
Sector No Pole No Ant Model Pole Height Ant Height Azimuth Down tilt
1 1 BA-B7B74Q7X90V-00 40 90 2/2
Antenna Type 2 1 BA-B7B74Q7X90V-00 40 180 2/2
3 1 BA-B7B74Q7X90V-00 40 320 2/2

4
5
Remarks _________________________________________________________________________________________________________________

Page 4 of 13
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034
SN Detail Photo Taken Num Of Photo

4.1 Site Overview Photo YES


1 Site Overview Photo(ground) YES 1

2 Tower overview photo(from groud to tower top) YES 1

3 GPS photo YES 1

4.2 Existing Equipment Information YES


1 Existing Antenna RF YES 1

2 Existing Antenna MW YES 1

3 Existing KWH Meter YES 1

4 Existing main MCB at KWH meter YES 1

5 Existing ACPDB YES 1

6 Existing AC Current Load YES 1

7 Existing Rectifier Cabinet YES 1

8 Existing DC Current Load YES 1

9 Existing DCPDB internal (at rectifier rack) YES 1

10 Existing DCPDB external (outside rectifier rack) YES 1

11 Existing Battery System YES 1

12 Existing Transmission Equipment YES 1

13 Existing Cable Tray/ladder(from BBU to Tower) YES 1

14 Existing Indoor Grounding Bar YES 1

15 Existing Outdoor Grounding Bar YES 1

16 Existing Foundation Outdoor YES 1

17 Other YES 1

4.3 Panoramic View YES


1 0 degree YES 1

2 30 degree YES 1

3 60 degree YES 1

4 90 degree YES 1

5 120 degree YES 1

6 150 degree YES 1

7 180 degree YES 1

8 210 degree YES 1

9 240 degree YES 1

10 270 degree YES 1

11 300 degree YES 1

12 330 degree YES 1

13 Antenna azimuth sector 1 YES 1

14 Antenna azimuth sector 2 YES 1

15 Antenna azimuth sector 3 YES 1

16 Antenna Mechnical down tile sector 1 YES 1

17 Antenna Mechnical down tile sector 2 YES 1

18 Antenna Mechnical down tile sector 3 YES 1

4.4 New Equipment Proposal YES


1 Proposed New BBU location YES 1

Page 5 of 14
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034
SN Detail Photo Taken Num Of Photo

2 Proposed new Rectifier System location YES 1

3 Proposed New RF Antenna and height YES 1

4 Proposed Reuse existing/new MCB for eNB YES 1

Page 6 of 14
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034

4 Site photo

4.1. Site Overview Photo

S : -7.38713
E : 110.78080

1. Site Overview Photo(ground) 2. Tower overview photo(from groud to tower top) 3. GPS photo

4.2. Existing Equipment Information

1. Existing Antenna RF 2. Existing Antenna MW 3. Existing KWH Meter

N/A

4. Existing main MCB at KWH meter 5. Existing ACPDB 6. Existing AC Current Load

N/A N/A N/A

7. Existing Rectifier Cabinet 8. Existing DC Current Load 9. Existing DCPDB internal (at rectifier rack)

N/A N/A N/A

10. Existing DCPDB external (outside rectifier rack) 11. Existing Battery System 12. Existing Transmission Equipment

Page 7 of 13
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034

N/A

13. Existing Cable Tray/ladder(from BBU to Tower) 14. Existing Indoor Grounding Bar 15. Existing Outdoor Grounding Bar

N/A N/A

16. Existing Foundation Outdoor 17. Other 17. Other

4.3. Panoramic View

1. 0 degree 2. 30 degree 3. 60 degree

4. 90 degree 5. 120 degree 6. 150 degree

7. 180 degree 8. 210 degree 9. 240 degree

Page 8 of 13
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034

10. 270 degree 11. 300 degree 12. 330 degree

AZ. 90 AZ. 180 AZ. 320

13. Antenna azimuth sector 1 14. Antenna azimuth sector 2 15. Antenna azimuth sector 3

N/A N/A N/A

16. Antenna Mechnical down tile sector 1 17. Antenna Mechnical down tile sector 2 18. Antenna Mechnical down tile sector 3

4.4. New Equipment Proposal

N/A N/A

1. Proposed New BBU location 2. Proposed new Rectifier System location 3. Proposed New RF Antenna and height

N/A N/A N/A

4. Proposed Reuse existing/new MCB for eNB

Page 9 of 13
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034

5.1 Site lay out ZSLO_1034

ACPDB SMARTFREN
PROPOSED

PROPOSED
FOUNDATION SMARTFREN
2000 X 1300 MM

PROPOSED
ZXDU68 W201

PROPOSED
CONTROL
BOX SMARTFREN

5.2 Proposed Equipment layout ZSLO_1034


ACPDB SMARTFREN
PROPOSED

PROPOSED
FOUNDATION SMARTFREN
2000 X 1300 MM

PROPOSED
ZXDU68 W201

PROPOSED
CONTROL
BOX SMARTFREN

Page 10 of 13
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034
5.3.1 Proposed RRU & antenna placement ZSLO_1034

PROPOSED RRU TDD


HEIGHT ±40.0 On Mounting
PROPOSED RRU FDD PROPOSED ANTENNA RF SMARTFREN 12
HEIGHT ±40.0 On Mounting H : ±40.0 M.A.G.L LEG A,C,D
PROPOSED FILTER
HEIGHT ±40.0 On Mounting
PROPOSED MW SF
HEIGHT ±37.0 M Ø0.6

±42.0 M.A.G.L

5.3.2 Proposed RRU & antenna placement ZSLO_1034

PROPOSED RRU TDD


HEIGHT ±40.0 On Mounting
PROPOSED RRU FDD PROPOSED ANTENNA RF SMARTFREN 12
HEIGHT ±40.0 On Mounting H : ±40.0 M.A.G.L LEG A,C,D
PROPOSED FILTER
HEIGHT ±40.0 On Mounting
PROPOSED MW SF
HEIGHT ±37.0 M Ø0.6

Page 11 of 13
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034
5.4 Proposed cable routing layout and table ZSLO_1034

ACPDB SMARTFREN
PROPOSED

PROPOSED
FOUNDATION SMARTFREN
2000 X 1300 MM

PROPOSED
ZXDU68 W201

PROPOSED
CONTROL
BOX SMARTFREN

5.5 Rectifier DCPDB MCB allocation ZSLO_1034

Battery
Lithium
100AH

Battery
Lithium
100AH

Page 12 of 13
Doc. Name:Site Survey detailed site-wise design

Technical Site Survey Report And


Design Drawing
For Smartfren LTE project
ZSLO_1034
5.6 Conectivity wiring diagram of power monitoring/new monitoring ZSLO_1034

5.6 Block Diagram ZSLO_1034

R8978
PRO POS ED ANT ENNA LT E 850 & 2300 MHz
12 por ts (BA-B7B74Q7X90V-00 ) on 40 m
R8862A Filter

BS8200 R8978
(TDD+FDD) PRO POS ED ANT ENNA LT E 850 & 2300 MHz
12 por ts (BA-B7B74Q7X90V-00 ) on 40 m
R8862A Filter

R8978
PRO POS ED ANT ENNA LT E 850 & 2300 MHz
12 por ts (BA-B7B74Q7X90V-00 ) on 40 m
R8862A Filter

ZXDU68
W201

See TX Database

Legend :

DC Power Cable
Fiber Optic
Jumper 1/2"

Page 13 of 13
秘密▲

Technical Site Survey And


Design Report
For Smartfren-LTE project
ZSLO_1034

6.INSTALLATION AUXILIARY MATERIALS


Item Unit Length(m) Qty
ZXDU48 H002 Installation
6 mm2 outdoor black power cable(From ACDB to H002) m
16 mm2 PVC cable jacket of Kelly(Grouding cable of ZXDU48 Rack) m
35 mm2 grouding cable(AL core) m
S301 Installation
3*16mm2+1core PVC cable jacket of black(From ACDB to S301) m
16 mm2 PVC cable jacket of gules(From S301 to Battery,red) m
16 mm2 PVC cable jacket of blove(From S301 to Battery,blue) m
35 mm2PVC cable jacket of Kelly(Grounding cable for S301,yellow-
m
green)
ZXDU68 W201 Installation
Base Frame pcs
4*10mm2 AC Power Cable (From ACDB to W201) m
Grounding cable for W201 or 19" Rack(16mm2) m
35 mm2 grouding cable(AL core) m
DCPD6 Installation
16 mm2 outdoor red power cable(From DC Power system to DCPD6) m
16 mm2 outdoor blue power cable(From DC Power system to DCPD6) m
BBU Installation
New Indoor 19" rack(Frame) pcs -
BBU power cable m
BBU grounding cable(6mm2) m
R8984E /R8978(TDD RRU) Installation
Qty. of R8984E/R8978 pcs -
2 core shielded power cable(4mm2, length<=50m) m
2 core shielded power cable(6mm2,50m<length<=75m) m
2 core shielded power cable(10mm2,75m<length<=115m) m
Grounding Cable(16mm2) m
R8862A (FDD RRU) Installation
Qty. of R8862A set -
2 core shielded power cable(4mm2, length<=50m) m
2 core shielded power cable(6mm2,50<length<=80m) m
2 core shielded power cable(10mm2,80m<length<=140m) m
ODCPD (for 10mm2 power cable, transfer box) pcs -
Grounding Cable(16mm2) m
Filter(For FDD RRU) Installation
Grounding Cable(16mm2) m
Fiber
Outdoor fiber(30m) 30m -
Outdoor fiber(40m) 40m -
Outdoor fiber(50m) 50m -
Outdoor fiber(60m) 60m -
Outdoor fiber(70m) 70m -
Outdoor fiber(80m) 80m -
Outdoor fiber(100m) 100m -
Outdoor fiber(120m) 110m -
Outdoor fiber(160m) 160m -
Outdoor fiber(200m) 205m -
Outdoor fiber(220m) 220m -
Outdoor fiber(250m) 250m -
Outdoor fiber(280m) 280m -
Outdoor fiber(300m) 310m -
Fiber Holder pcs -
GPS Antenna
GPS feeder cable m

<以上所有信息均为中兴通讯股份有限公司所有,不得外传> 共1⻚,第1⻚
Design Pack New Site Drawing
ZSLO_1034/ GENENG

29 Mei 2020
REMARKS

DESIGN PACK
APPROVED BY
N
NW

NE
W

E
SE

SW
S

PREPARED BY

PROJECT NAME

Smartfren Project

Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

SITE NAME/SF ID/SITE ID :


PROPOSED
ACPDBSMARTFREN

PROPOSED
FOUNDATIONSMARTFREN ZSLO_1034 / GENENG
2000X1300MM
Scale :
REGION : Central Java
nts
PROPOSED
ZXDU68W201
Ref. : Drawing
No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG
01

PROPOSED Ed. Description Date : Drawn by :


CONTROL
1 New Creation
BOXSMARTFREN

DRAWING TITLE

Site Layout A4
REMARKS

DESIGN PACK
APPROVED BY
PROPOSED
ACPDB SMARTFREN

PROPOSED PREPARED BY

FOUNDATION SMARTFREN
2000 X 1300 MM PROJECT NAME

Smartfren Project

PROPOSED
ZXDU68 W201 Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

SITE NAME/SF ID/SITE ID :


ZSLO_1034 / GENENG

Scale :
REGION : Central Java
PROPOSED Ref. : Drawing
1:30

CONTROL
No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 02

Ed. Description Date : Drawn by :

BOX SMARTFREN 1 New Creation

DRAWING TITLE

Equipments Layout A4
PROPOSED RRU TDD
HEIGHT ±40.0 On Mounting
PROPOSED RRU FDD PROPOSED ANTENNA RF SMARTFREN 12
HEIGHT ±40.0 On Mounting H : ±40.0 M.A.G.L LEG A,C,D REMARKS
PROPOSED FILTER
HEIGHT ±40.0 On Mounting N

NW

NE
PROPOSED MW SF

E
SE

SW
S

HEIGHT ±37.0 M ∅0.6

DESIGN PACK
APPROVED BY

PREPARED BY

PROJECT NAME

Smartfren Project

Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

SITE NAME/SF ID/SITE ID :


ZSLO_1034 / GENENG

Scale :
REGION : Central Java
nts

Ref. : Drawing
No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 03

Ed. Description Date : Drawn by :

1 New Creation

Ground Level
±42.0 M.A.G.L
DRAWING TITLE

Antenna placement A4
Information
PROPOSED RRU TDD
HEIGHT ±40.0 On Mounting REMARKS

PROPOSED RRU FDD PROPOSED ANTENNA RF SMARTFREN 12


HEIGHT ±40.0 On Mounting H : ±40.0 M.A.G.L LEG A,C,D
PROPOSED FILTER
HEIGHT ±40.0 On Mounting DESIGN PACK
APPROVED BY
PROPOSED MW SF
HEIGHT ±37.0 M ∅0.6

PREPARED BY

PROJECT NAME

Smartfren Project

Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

SITE NAME/SF ID/SITE ID :


ZSLO_1034 / GENENG

Scale :
REGION : Central Java
NTS

Ref. : Drawing
09 No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 04

Ed. Description Date : Drawn by :

1 New Creation

N
NW
NE
W

E
SE

SW
S

DRAWING TITLE

RRU Placement A4
Information
REMARKS

DESIGN PACK
APPROVED BY

PREPARED BY

PROJECT NAME

Smartfren Project

Approved by : Sign.

Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

SITE NAME/SF ID/SITE ID :


PROPOSED
ACPDB SMARTFREN

PROPOSED ZSLO_1034 / GENENG

FOUNDATION SMARTFREN Scale :


REGION : Central Java
2000 X 1300 MM NTS

Ref. : Drawing
No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 05
PROPOSED
ZXDU68W201 Ed. Description Date : Drawn by :

1 New Creation

PROPOSED
CONTROL DRAWING TITLE
BOX SMARTFREN
Routing Cable Layout A4
REMARKS

DESIGN PACK
APPROVED BY

BPN2

PM5 FAN
BPL1

SAO CCFO
GPS
to PM BBU to RRU TDD to RRU FDD to MW to Dry Contact to FAN

63A 25A 25A 25A 25A 25A 25A 25A 20A 16A 16A 16A 16A 16A 16A 16A 16A 100A
PREPARED BY
BATT1 BATT2
DC SPD LLVD1 BLVD

ZXD3000 ZXD3000

ZXD3000
PROJECT NAME

Smartfren Project

Approved by : Sign.
Battery
Lithium Checked by : Sign.

100AH
Checked by ( PT. ZTE) : Sign.

SITE NAME/SF ID/SITE ID :


ZSLO_1034 / GENENG

Scale :
REGION : Central Java
nts

Ref. : Drawing
08 No.: Unit : mm
BTS/DP/ ZSLO_1034/GENENG 06
Battery Ed. Description Date : Drawn by :

Lithium 1 New Creation

100AH

DRAWING TITLE

Rectifier Front View A4


OMCR
REMARKS
Server eNode-B
NO. Alarm Source ZTE LTE BBU SOW
Input Alarm
DB 25
1 PLN Failure ACPDB ZTE
Pin 1 -14
DB 25
Transmission 2 Rectifier Module Rectifier
Pin 2 -15 ZTE
DESIGN PACK
DC Low Voltage DB 25
3 Rectifier ZTE APPROVED BY
Pin 3 -16
Input SPD PLN DB 25
4 Failure
ACPDB Pin 4 -17
ZTE
Battery Stolen DB 25
5 Rectifier/Device ZTE
Pin 5 -18
BBU DB 25
6 High Temp Rectifier ZTE
Pin 6 -19
SA Board Diesel Generator DB 25 PREPARED BY
7 DG Set Smartfren
Set On Pin 7 -20
SA panel cable

Door Open DB 25
8 Cabinet/Shelter ZTE
Pin 8 -21
End B3

PROJECT NAME

Smartfren Project

Convertor
① ② ③ ④ ⑤ ⑥ ⑦ ⑧ Approved by : Sign.
0.3mm2 black single core heat resistant
1.0mm2 black dual core heat resistant

1.0mm2 black dual core heat resistant

1.0mm2 black dual core heat resistant

1.0mm2 black dual core heat resistant

1.0mm2 black dual core heat resistant

1.0mm2 black dual core heat resistant


Temperature Transducer Cable (NTC)
Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

SITE NAME/SF ID/SITE ID :


ZSLO_1034 / GENENG

Scale :
REGION : Central Java
Flexible power cable

Flexible power cable

Flexible power cable

Flexible power cable

Flexible power cable

Flexible power cable


Flexible power cable

NTS

Ref. : Drawing
06 No.:07 Unit : mm
BTS/DP/ ZSLO_1034/GENENG

Ed. Description Date : Drawn by :

1 New Creation

PLN Rectifier DC Low SPD Battery High DG Door DRAWING TITLE


Failure Module Voltage PLN Failure Stolen Temp Fuel Tank Open
Failure
Conectivity wiring diagram of
power monitoring/new monitoring
A4
REMARKS

R8978 DESIGN PACK


PROPOSED ANTENNA LTE 850 & 2300 MHz
12 ports (BA-B7B74Q7X90V-00) on 40 m APPROVED BY
R8862A Filter

BS8200 R8978
(TDD+FDD) PROPOSED ANTENNA LTE 850 & 2300 MHz
12 ports (BA-B7B74Q7X90V-00) on 40 m
R8862A Filter

R8978
PROPOSED ANTENNA LTE 850 & 2300 MHz
12 ports (BA-B7B74Q7X90V-00) on 40 m PREPARED BY
R8862A Filter

PROJECT NAME
-48V Smartfren Project
ZXDU68
W201

Approved by : Sign.
-48V TX
See TX Database ODU Use New MW
RX
Checked by : Sign.

Checked by ( PT. ZTE) : Sign.

SITE NAME/SF ID/SITE ID :


ZSLO_1034 / GENENG

Scale :
Legend: REGION : Central Java
NTS

Ref. : 07 Drawing
DC Power Cable BTS/DP/ ZSLO_1034/GENENG
No.: Unit : mm
08
Fiber Optic
Ed. Description Date : Drawn by :
Jumper 1/2"
1 New Creation

DRAWING TITLE

Block Diagram A4