STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02

REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

I. PILE JACKETING
A. Details

Note: Concrete Cover = 70 mm

B. Additional Notes

1. This is the section of the pile (780x780) that we considered when we


run our structural analysis and if we reduce this section there will be an
effect to the pier capacity
2. The material to be used for wrapping the existing pile is carbon fiber
which is not currently available in the market. We have tried to inquire
other materials, such as the fiberglass reinforced plastic (GRP). One of
the suppliers said that is not recommended underwater.
3. The cost of this material (item 2) is 50% higher than the conventional
pile jacketing.
4. With regards to the existing pile jacket that has cracks or damage, we
can chip off the concrete until we expose the rebars and we fill it again
with concrete. Cross-section details are shown below.

1
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

Notes:
1. Existing concrete jacketing will be chipped off until rebars are
exposed.
2. Rebars are to be added or replaced if necessary.

C. Table for Details of Concrete Jacketing

FULL CONCRETE JACKETING

Reference in the
Bent No. Pile ID Original Add: Cover+bottom Length (m)
Report

1. Final Report, Section


II-C, Section IV-B
3 A 3.1 2.1 5.20
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
4 A 6.6 2.1 8.70
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
4 B 6.6 2.1 8.70
2. CED Drawings,
Sheet S-06

2
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

FULL CONCRETE JACKETING

Reference in the
Bent No. Pile ID Original Add: Cover+bottom Length (m)
Report

1. Final Report, Section


II-C, Section IV-B
4 D 5.8 2.1 7.90
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
4 F 5.8 2.1 7.90
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
5 A 6.9 2.1 9.00
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
5 E 8.3 2.1 10.40
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
5 F 8.3 2.1 10.40
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
6 A 8.5 2.1 10.60
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
6 B 8.5 2.1 10.60
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
6 C 8 2.1 10.10
2. CED Drawings,
Sheet S-06

3
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

FULL CONCRETE JACKETING

Reference in the
Bent No. Pile ID Original Add: Cover+bottom Length (m)
Report

1. Final Report, Section


II-C, Section IV-B
7 D 8.75 2.1 10.85
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
7 E 8.3 2.1 10.40
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
12 D 8.1 2.1 10.20
2. CED Drawings,
Sheet S-06

1. Final Report, Section


II-C, Section IV-B
12 G 7.9 2.1 10.00
2. CED Drawings,
Sheet S-06

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
3 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
8 A
water • CED Drawings,
Sheet S-06
• Appendix 5

4
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
10 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
1.3 from Section II-C,
ceiling Section IV-B
11 B 0.70 0.20 0.90
on south
• CED Drawings,
side
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
11 E
water • CED Drawings,
Sheet S-06
• Appendix 5
Crack • Final Report,
above Section II-C,
2.00 0.20 2.20 and Section IV-B
12 A1
below • CED Drawings,
water Sheet S-06
• Appendix 5
Crack • Final Report,
above Section II-C,
2.90 0.20 3.10 and Section IV-B
12 F
below • CED Drawings,
water Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 above Section IV-B
13 E
water • CED Drawings,
Sheet S-06
• Appendix 5
Exposed • Final Report,
rebar Section II-C,
0.36 0.20 0.56 5.70 m Section IV-B
13 E
from • CED Drawings,
ceiling Sheet S-06
• Appendix 5

5
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
14 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
5.70 0.20 5.90 below Section IV-B
14 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
15 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 above Section IV-B
15 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
15 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
16 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
16 C
water • CED Drawings,
Sheet S-06
• Appendix 5

6
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
Crack • Final Report,
underwa Section II-C,
0.60 0.20 0.80 ter 2m Section IV-B
16 C
from • CED Drawings,
ceiling Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
17 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
18 A
water • CED Drawings,
Sheet S-06
• Appendix 5
Crack • Final Report,
underwa Section II-C,
0.40 0.20 0.60 ter 1.2m Section IV-B
18 A
from • CED Drawings,
ceiling Sheet S-06
• Appendix 5
Crack • Final Report,
above Section II-C,
water Section IV-B
19 B 2.20 0.20 2.40
and
• CED Drawings,
below
Sheet S-06
water
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
19 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Exposed Section II-C,
rebar Section IV-B
19 E 0.60 0.20 0.80
above
• CED Drawings,
water
Sheet S-06
• Appendix 5

7
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
20 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 below Section IV-B
20 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Section II-C,
Exposed Section IV-B
20 C 0.70 0.20 0.90
rebar
• CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.60 0.20 1.80 above Section IV-B
20 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Northea Section II-C,
5.60 0.20 5.80 st corner Section IV-B
20 G1
crack • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Northwe Section II-C,
5.40 0.20 5.60 st corner Section IV-B
20 G1
crack • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Southea Section II-C,
1.50 0.20 1.70 st corner Section IV-B
20 G1
crack • CED Drawings,
Sheet S-06
• Appendix 5

8
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Section II-C,
Midsecti Section IV-B
21 A1 6.75 0.20 6.95
on crack
• CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 above Section IV-B
21 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 below Section IV-B
21 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 below Section IV-B
21 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.80 0.20 1.00 the Section IV-B
21 B
bottom • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
3.00 0.20 3.20 above Section IV-B
21 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.8m Section IV-B
21 G1 0.80 0.20 1.00
from the
• CED Drawings,
ceiling
Sheet S-06
• Appendix 5

9
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 below Section IV-B
21 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.20 0.20 1.40 above Section IV-B
22 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Section II-C,
Horizont Section IV-B
22 E 0.12 0.20 0.32
al crack
• CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 below Section IV-B
22 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.40 0.20 1.60 the Section IV-B
22 G
bottom • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.60 0.20 1.80 above Section IV-B
24 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.77 0.20 0.97 below Section IV-B
24 B
water • CED Drawings,
Sheet S-06
• Appendix 5

10
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
24 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
24 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
24 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
3.00 0.20 3.20 the Section IV-B
24 E
bottom • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
2.10 0.20 2.30 from the Section IV-B
25 A1
ceiling • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.17 0.20 0.37 below Section IV-B
25 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
2.10 0.20 2.30 above Section IV-B
25 B
water • CED Drawings,
Sheet S-06
• Appendix 5

11
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
2.10 0.20 2.30 midsecti Section IV-B
25 B
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
2.90 0.20 3.10 the Section IV-B
25 B
bottom • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
25 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
2.30 0.20 2.50 above Section IV-B
25 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.00 0.20 1.20 midsecti Section IV-B
25 F
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 above Section IV-B
25 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.25 0.20 0.45 midsecti Section IV-B
25 G
on • CED Drawings,
Sheet S-06
• Appendix 5

12
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
3.50 0.20 3.70 midsecti Section IV-B
25 G
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
3.30 0.20 3.50 above Section IV-B
26 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.80 0.20 2.00 midsecti Section IV-B
26 A
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.20 0.20 1.40 above Section IV-B
26 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.60 0.20 1.80 midsecti Section IV-B
26 C
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
4m from Section IV-B
26 C 1.90 0.20 2.10
the
• CED Drawings,
ceiling
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.40 0.20 1.60 above Section IV-B
26 G1
water • CED Drawings,
Sheet S-06
• Appendix 5

13
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
1.8m Section IV-B
26 G1 0.20 0.20 0.40
from
• CED Drawings,
ceiling
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 above Section IV-B
27 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
28 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Section II-C,
0.40 Section IV-B
28 E
• CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
28 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
28 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.15 0.20 1.35 above Section IV-B
29 B
water • CED Drawings,
Sheet S-06
• Appendix 5

14
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 below Section IV-B
29 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
30 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.60 0.20 1.80 below Section IV-B
30 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
31 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
31 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 below Section IV-B
31 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.70 0.20 0.90 midsecti Section IV-B
31 C
on • CED Drawings,
Sheet S-06
• Appendix 5

15
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
below Section IV-B
31 C 1.80 0.20 2.00
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
31 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.70 0.20 1.90 below Section IV-B
31 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.90 0.20 1.10 midsecti Section IV-B
31 F
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
31 F 0.90 0.20 1.10
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
31 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 below Section IV-B
31 G
water • CED Drawings,
Sheet S-06
• Appendix 5

16
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
31 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
31 G1 6.50 0.20 6.70
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
32 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
32 E
water • CED Drawings,
Sheet S-06
• Appendix 5
damage • Final Report,
below Section II-C,
0.60 0.20 0.80 water, Section IV-B
32 G
exposed • CED Drawings,
rebar Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
33 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.30 0.20 1.50 below Section IV-B
33 A
water • CED Drawings,
Sheet S-06
• Appendix 5

17
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
Crack • Final Report,
above Section II-C,
1.70 0.20 1.90 and Section IV-B
33 C
below • CED Drawings,
water Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
33 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
33 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 below Section IV-B
33 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
33 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
7.10 0.20 7.30 below Section IV-B
33 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
34 A
water • CED Drawings,
Sheet S-06
• Appendix 5

18
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
0.70 0.20 0.90 midsecti Section IV-B
34 A
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
35 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 below Section IV-B
35 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.95 0.20 1.15 above Section IV-B
36 A
water • CED Drawings,
Sheet S-06
• Appendix 5
Crack • Final Report,
above Section II-C,
1.50 0.20 1.70 water, Section IV-B
36 A2
exposed • CED Drawings,
rebar Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 below Section IV-B
36 A2
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.40 0.20 0.60 midsecti Section IV-B
36 A2
on • CED Drawings,
Sheet S-06
• Appendix 5

19
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
2.20 0.20 2.40 above Section IV-B
37 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 below Section IV-B
37 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
37 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.40 0.20 1.60 below Section IV-B
37 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.55 0.20 0.75 below Section IV-B
37 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.70 0.20 1.90 above Section IV-B
37 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.50 0.20 0.70 below Section IV-B
37 B
water • CED Drawings,
Sheet S-06
• Appendix 5

20
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
Crack • Final Report,
above Section II-C,
1.40 0.20 1.60 water, Section IV-B
37 D1
exposed • CED Drawings,
rebar Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 below Section IV-B
37 D1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
37 D2
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 below Section IV-B
37 D2
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.50 0.20 1.70 midsecti Section IV-B
37 D2
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
37 D2 0.50 0.20 0.70
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.20 0.20 1.40 above Section IV-B
37 G1
water • CED Drawings,
Sheet S-06
• Appendix 5

21
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
8.00 0.20 8.20 below Section IV-B
37 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.10 0.20 0.30 below Section IV-B
37 G2
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
37 G3
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.60 0.20 1.80 midsecti Section IV-B
37 G3
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
37 G3 1.20 0.20 1.40
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.90 0.20 2.10 below Section IV-B
37 G4
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
7.60 0.20 7.80 midsecti Section IV-B
37 G4
on • CED Drawings,
Sheet S-06
• Appendix 5

22
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
37 G4
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 above Section IV-B
37 G5
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
37 G5
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.40 0.20 0.60 midsecti Section IV-B
37 G5
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
MDA-1 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
MDA-1 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
MDA-3 B
water • CED Drawings,
Sheet S-06
• Appendix 5

23
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
MDA-3 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.20 0.20 0.40 below Section IV-B
MDA-3 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
MDA-7 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.30 0.20 0.50 midsecti Section IV-B
MDA-7 C
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
MDA-7 C 0.30 0.20 0.50
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.50 0.20 0.70 above Section IV-B
MDB-1 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.50 0.20 0.70 below Section IV-B
MDB-1 A
water • CED Drawings,
Sheet S-06
• Appendix 5

24
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
0.80 0.20 1.00 midsecti Section IV-B
MDB-1 A
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.55 0.20 0.75 below Section IV-B
MDB-1 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.30 0.20 0.50 above Section IV-B
MDB-1 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 below Section IV-B
MDB-1 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
MDB-1 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.50 0.20 0.70 midsecti Section IV-B
MDB-1 D
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
MDB-2 C
water • CED Drawings,
Sheet S-06
• Appendix 5

25
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
MDB-3 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.70 0.20 0.90 midsecti Section IV-B
MDB-3 D
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
MDB-3 D 2.70 0.20 2.90
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
MDB-4 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.65 0.20 0.85 midsecti Section IV-B
MDB-4 B
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.30 0.20 0.50 above Section IV-B
MDB-6 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
MDB-6 C
water • CED Drawings,
Sheet S-06
• Appendix 5

26
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
MDB-7 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
MDB-7 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 above Section IV-B
MDC-1 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
9.20 0.20 9.40 midsecti Section IV-B
MDC-1 D
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.75 0.20 0.95 above Section IV-B
MDC-3 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
MDC-3 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
MDC-5 A
water • CED Drawings,
Sheet S-06
• Appendix 5

27
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
MDC-6 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.50 0.20 8.70 below Section IV-B
MDC-6 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.30 0.20 8.50 below Section IV-B
MDC-7 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.00 0.20 8.20 below Section IV-B
MDC-7 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
9.50 0.20 9.70 below Section IV-B
MDC-7 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
2.50 0.20 2.70 midsecti Section IV-B
MDC-8 D
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.40 0.20 1.60 below Section IV-B
MDC-8 D
water • CED Drawings,
Sheet S-06
• Appendix 5

28
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

SECTIONAL CONCRETE JACKETING

Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.30 0.20 0.50 below Section IV-B
MDC-9 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.50 0.20 8.70 below Section IV-B
MDC-9 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.40 0.20 8.60 below Section IV-B
MDC-10 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
7.10 0.20 7.30 below Section IV-B
MDC-11 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.30 0.20 0.50 above Section IV-B
MDC-11 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
9.90 0.20 10.10 below Section IV-B
MDC-11 D
water • CED Drawings,
Sheet S-06
• Appendix 5
HC
HAIRLINE 61.20 above • Final Report,
CRACKS water Section IV-A

29
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

II. SLABS, FENDERS AND BOLLARDS

A. Under Deck Slab

Under Deck Slab (Area)

Estimated
Length Width
No. Location Area Reference in the Report
(mm) (mm)
(sq.m)
1. Final Report, Section II-
E, Section IV-C
1 Grid 2-3, Pile ID A-B 4877 2965
2. CED Drawings, Sheet
14.46 S-07
1. Final Report, Section II-
E, Section IV-C
2 Grid 2-3, Pile ID B-C 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
3 Grid 3-4, Pile ID A-B 4877 2965
2. CED Drawings, Sheet
14.46 S-07
1. Final Report, Section II-
E, Section IV-C
4 Grid 3-4, Pile ID B-C (1) 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
5 Grid 3-4, Pile ID B-C (2) 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
6 Grid 4-5, Pile ID E-F 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
7 Grid 5 Beam (1) 5865 526
2. CED Drawings, Sheet
3.08 S-07
1. Final Report, Section II-
E, Section IV-C
8 Grid 5 Beam (2) 5865 526
2. CED Drawings, Sheet
3.08 S-07
1. Final Report, Section II-
E, Section IV-C
9 Grid 5-6, Pile ID E-F 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
10 Grid 5-6, Pile ID F-G 4877 2287
2. CED Drawings, Sheet
11.15 S-07

30
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

Under Deck Slab (Area)

Estimated
Length Width
No. Location Area Reference in the Report
(mm) (mm)
(sq.m)
1. Final Report, Section II-
E, Section IV-C
11 Grid 6-7, Pile ID E-G 4877 4574
2. CED Drawings, Sheet
22.31 S-07
1. Final Report, Section II-
E, Section IV-C
12 Grid 11-12, Pile ID C 4877 2230
2. CED Drawings, Sheet
10.88 S-07
1. Final Report, Section II-
E, Section IV-C
13 Grid 13-14, Pile ID B-C 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
14 Grid 13-14, Pile ID E-G 4877 4574
2. CED Drawings, Sheet
22.31 S-07
1. Final Report, Section II-
E, Section IV-C
15 Grid 15-16, Pile ID E-F 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
16 Grid 15-16, Pile ID F 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
17 Grid 15-16, Pile ID F-G 4877 2287 E, Section IV-C2. CED
11.15 Drawings, Sheet S-07
1. Final Report, Section II-
E, Section IV-C
18 Grid 16-17, Pile ID B 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
19 Grid 19-20, Pile ID C 4877 2230
2. CED Drawings, Sheet
10.88 S-07
1. Final Report, Section II-
E, Section IV-C
20 Grid 23 Beam 5865 1052
2. CED Drawings, Sheet
6.17 S-07
1. Final Report, Section II-
E, Section IV-C
21 Grid 27-28, Pile ID E 4877 4574
2. CED Drawings, Sheet
22.31 S-07
1. Final Report, Section II-
E, Section IV-C
22 Grid 32-33, Pile ID A-B 4877 2965
2. CED Drawings, Sheet
14.46 S-07

31
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

Under Deck Slab (Area)

Estimated
Length Width
No. Location Area Reference in the Report
(mm) (mm)
(sq.m)
1. Final Report, Section II-
E, Section IV-C
23 Grid 32-33, Pile ID B-C 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
24 Grid 33, Pile ID E 4877 2230
2. CED Drawings, Sheet
10.88 S-07
1. Final Report, Section II-
E, Section IV-C
25 Grid 33, Pile ID F-G 4877 4574
2. CED Drawings, Sheet
22.31 S-07
1. Final Report, Section II-
E, Section IV-C
26 Grid 34-35, Pile ID C-D (1) 4877 2173
2. CED Drawings, Sheet
10.60 S-07
1. Final Report, Section II-
E, Section IV-C
27 Grid 34-35, Pile ID C-D (2) 4877 2173
2. CED Drawings, Sheet
10.60 S-07

B. Fenders

FENDERS

Type
No. Location Notes Reference in the Report
of Fender

1. Final Report, Section II-F


2. CED Drawings, Sheet S-08A
1 A-16 Arch For full replacement and Sheet S-08B
1. Final Report, Section II-F
2. CED Drawings, Sheet S-08A
2 F-13 1700H For full replacement and Sheet S-08B
1. Final Report, Section II-F
2. CED Drawings, Sheet S-08A
3 F-7 1000H For full replacement and Sheet S-08B
1. Final Report, Section II-F
2. CED Drawings, Sheet S-08A
4 F-8 1700H For full replacement and Sheet S-08B

32
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022

1. Final Report, Section II-F


2. CED Drawings, Sheet S-08A
5 F-16 1700H For full replacement and Sheet S-08B
1. Final Report, Section II-F
2. CED Drawings, Sheet S-08A
6 D-4 Arch For full replacement and Sheet S-08B

33