I. PILE JACKETING
A. Details
B. Additional Notes
1
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes:
1. Existing concrete jacketing will be chipped off until rebars are
exposed.
2. Rebars are to be added or replaced if necessary.
Reference in the
Bent No. Pile ID Original Add: Cover+bottom Length (m)
Report
2
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Reference in the
Bent No. Pile ID Original Add: Cover+bottom Length (m)
Report
3
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Reference in the
Bent No. Pile ID Original Add: Cover+bottom Length (m)
Report
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
3 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
8 A
water • CED Drawings,
Sheet S-06
• Appendix 5
4
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
10 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
1.3 from Section II-C,
ceiling Section IV-B
11 B 0.70 0.20 0.90
on south
• CED Drawings,
side
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
11 E
water • CED Drawings,
Sheet S-06
• Appendix 5
Crack • Final Report,
above Section II-C,
2.00 0.20 2.20 and Section IV-B
12 A1
below • CED Drawings,
water Sheet S-06
• Appendix 5
Crack • Final Report,
above Section II-C,
2.90 0.20 3.10 and Section IV-B
12 F
below • CED Drawings,
water Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 above Section IV-B
13 E
water • CED Drawings,
Sheet S-06
• Appendix 5
Exposed • Final Report,
rebar Section II-C,
0.36 0.20 0.56 5.70 m Section IV-B
13 E
from • CED Drawings,
ceiling Sheet S-06
• Appendix 5
5
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
14 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
5.70 0.20 5.90 below Section IV-B
14 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
15 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 above Section IV-B
15 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
15 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
16 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
16 C
water • CED Drawings,
Sheet S-06
• Appendix 5
6
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
Crack • Final Report,
underwa Section II-C,
0.60 0.20 0.80 ter 2m Section IV-B
16 C
from • CED Drawings,
ceiling Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
17 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
18 A
water • CED Drawings,
Sheet S-06
• Appendix 5
Crack • Final Report,
underwa Section II-C,
0.40 0.20 0.60 ter 1.2m Section IV-B
18 A
from • CED Drawings,
ceiling Sheet S-06
• Appendix 5
Crack • Final Report,
above Section II-C,
water Section IV-B
19 B 2.20 0.20 2.40
and
• CED Drawings,
below
Sheet S-06
water
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
19 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Exposed Section II-C,
rebar Section IV-B
19 E 0.60 0.20 0.80
above
• CED Drawings,
water
Sheet S-06
• Appendix 5
7
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
20 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 below Section IV-B
20 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Section II-C,
Exposed Section IV-B
20 C 0.70 0.20 0.90
rebar
• CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.60 0.20 1.80 above Section IV-B
20 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Northea Section II-C,
5.60 0.20 5.80 st corner Section IV-B
20 G1
crack • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Northwe Section II-C,
5.40 0.20 5.60 st corner Section IV-B
20 G1
crack • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Southea Section II-C,
1.50 0.20 1.70 st corner Section IV-B
20 G1
crack • CED Drawings,
Sheet S-06
• Appendix 5
8
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Section II-C,
Midsecti Section IV-B
21 A1 6.75 0.20 6.95
on crack
• CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 above Section IV-B
21 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 below Section IV-B
21 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 below Section IV-B
21 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.80 0.20 1.00 the Section IV-B
21 B
bottom • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
3.00 0.20 3.20 above Section IV-B
21 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.8m Section IV-B
21 G1 0.80 0.20 1.00
from the
• CED Drawings,
ceiling
Sheet S-06
• Appendix 5
9
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 below Section IV-B
21 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.20 0.20 1.40 above Section IV-B
22 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Section II-C,
Horizont Section IV-B
22 E 0.12 0.20 0.32
al crack
• CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 below Section IV-B
22 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.40 0.20 1.60 the Section IV-B
22 G
bottom • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.60 0.20 1.80 above Section IV-B
24 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.77 0.20 0.97 below Section IV-B
24 B
water • CED Drawings,
Sheet S-06
• Appendix 5
10
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
24 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
24 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
24 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
3.00 0.20 3.20 the Section IV-B
24 E
bottom • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
2.10 0.20 2.30 from the Section IV-B
25 A1
ceiling • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.17 0.20 0.37 below Section IV-B
25 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
2.10 0.20 2.30 above Section IV-B
25 B
water • CED Drawings,
Sheet S-06
• Appendix 5
11
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
2.10 0.20 2.30 midsecti Section IV-B
25 B
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
2.90 0.20 3.10 the Section IV-B
25 B
bottom • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
25 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
2.30 0.20 2.50 above Section IV-B
25 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.00 0.20 1.20 midsecti Section IV-B
25 F
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 above Section IV-B
25 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.25 0.20 0.45 midsecti Section IV-B
25 G
on • CED Drawings,
Sheet S-06
• Appendix 5
12
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
3.50 0.20 3.70 midsecti Section IV-B
25 G
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
3.30 0.20 3.50 above Section IV-B
26 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.80 0.20 2.00 midsecti Section IV-B
26 A
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.20 0.20 1.40 above Section IV-B
26 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.60 0.20 1.80 midsecti Section IV-B
26 C
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
4m from Section IV-B
26 C 1.90 0.20 2.10
the
• CED Drawings,
ceiling
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.40 0.20 1.60 above Section IV-B
26 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
13
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
1.8m Section IV-B
26 G1 0.20 0.20 0.40
from
• CED Drawings,
ceiling
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 above Section IV-B
27 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
28 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Section II-C,
0.40 Section IV-B
28 E
• CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
28 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
28 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.15 0.20 1.35 above Section IV-B
29 B
water • CED Drawings,
Sheet S-06
• Appendix 5
14
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 below Section IV-B
29 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
30 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.60 0.20 1.80 below Section IV-B
30 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
31 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
31 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 below Section IV-B
31 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.70 0.20 0.90 midsecti Section IV-B
31 C
on • CED Drawings,
Sheet S-06
• Appendix 5
15
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
below Section IV-B
31 C 1.80 0.20 2.00
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
31 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.70 0.20 1.90 below Section IV-B
31 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.90 0.20 1.10 midsecti Section IV-B
31 F
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
31 F 0.90 0.20 1.10
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
31 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 below Section IV-B
31 G
water • CED Drawings,
Sheet S-06
• Appendix 5
16
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
31 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
31 G1 6.50 0.20 6.70
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
32 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
32 E
water • CED Drawings,
Sheet S-06
• Appendix 5
damage • Final Report,
below Section II-C,
0.60 0.20 0.80 water, Section IV-B
32 G
exposed • CED Drawings,
rebar Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
33 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.30 0.20 1.50 below Section IV-B
33 A
water • CED Drawings,
Sheet S-06
• Appendix 5
17
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
Crack • Final Report,
above Section II-C,
1.70 0.20 1.90 and Section IV-B
33 C
below • CED Drawings,
water Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
33 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
33 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 below Section IV-B
33 G
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
33 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
7.10 0.20 7.30 below Section IV-B
33 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
34 A
water • CED Drawings,
Sheet S-06
• Appendix 5
18
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
0.70 0.20 0.90 midsecti Section IV-B
34 A
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
35 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 below Section IV-B
35 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.95 0.20 1.15 above Section IV-B
36 A
water • CED Drawings,
Sheet S-06
• Appendix 5
Crack • Final Report,
above Section II-C,
1.50 0.20 1.70 water, Section IV-B
36 A2
exposed • CED Drawings,
rebar Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 below Section IV-B
36 A2
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.40 0.20 0.60 midsecti Section IV-B
36 A2
on • CED Drawings,
Sheet S-06
• Appendix 5
19
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
2.20 0.20 2.40 above Section IV-B
37 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 below Section IV-B
37 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
37 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.40 0.20 1.60 below Section IV-B
37 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.55 0.20 0.75 below Section IV-B
37 A1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.70 0.20 1.90 above Section IV-B
37 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.50 0.20 0.70 below Section IV-B
37 B
water • CED Drawings,
Sheet S-06
• Appendix 5
20
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
Crack • Final Report,
above Section II-C,
1.40 0.20 1.60 water, Section IV-B
37 D1
exposed • CED Drawings,
rebar Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 below Section IV-B
37 D1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.10 0.20 1.30 above Section IV-B
37 D2
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 below Section IV-B
37 D2
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.50 0.20 1.70 midsecti Section IV-B
37 D2
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
37 D2 0.50 0.20 0.70
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.20 0.20 1.40 above Section IV-B
37 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
21
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
8.00 0.20 8.20 below Section IV-B
37 G1
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.10 0.20 0.30 below Section IV-B
37 G2
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
37 G3
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
1.60 0.20 1.80 midsecti Section IV-B
37 G3
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
37 G3 1.20 0.20 1.40
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.90 0.20 2.10 below Section IV-B
37 G4
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
7.60 0.20 7.80 midsecti Section IV-B
37 G4
on • CED Drawings,
Sheet S-06
• Appendix 5
22
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
37 G4
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.50 0.20 1.70 above Section IV-B
37 G5
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
37 G5
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.40 0.20 0.60 midsecti Section IV-B
37 G5
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
MDA-1 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
MDA-1 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
MDA-3 B
water • CED Drawings,
Sheet S-06
• Appendix 5
23
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
MDA-3 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.20 0.20 0.40 below Section IV-B
MDA-3 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
MDA-7 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.30 0.20 0.50 midsecti Section IV-B
MDA-7 C
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
MDA-7 C 0.30 0.20 0.50
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.50 0.20 0.70 above Section IV-B
MDB-1 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.50 0.20 0.70 below Section IV-B
MDB-1 A
water • CED Drawings,
Sheet S-06
• Appendix 5
24
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack at Section II-C,
0.80 0.20 1.00 midsecti Section IV-B
MDB-1 A
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.55 0.20 0.75 below Section IV-B
MDB-1 A
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.30 0.20 0.50 above Section IV-B
MDB-1 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 below Section IV-B
MDB-1 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.00 0.20 1.20 above Section IV-B
MDB-1 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.50 0.20 0.70 midsecti Section IV-B
MDB-1 D
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
MDB-2 C
water • CED Drawings,
Sheet S-06
• Appendix 5
25
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 above Section IV-B
MDB-3 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.70 0.20 0.90 midsecti Section IV-B
MDB-3 D
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
below Section IV-B
MDB-3 D 2.70 0.20 2.90
water,
• CED Drawings,
bottom
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
MDB-4 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
0.65 0.20 0.85 midsecti Section IV-B
MDB-4 B
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.30 0.20 0.50 above Section IV-B
MDB-6 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
MDB-6 C
water • CED Drawings,
Sheet S-06
• Appendix 5
26
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.90 0.20 1.10 above Section IV-B
MDB-7 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 below Section IV-B
MDB-7 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.60 0.20 0.80 above Section IV-B
MDC-1 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
9.20 0.20 9.40 midsecti Section IV-B
MDC-1 D
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.75 0.20 0.95 above Section IV-B
MDC-3 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.80 0.20 1.00 above Section IV-B
MDC-3 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.70 0.20 0.90 above Section IV-B
MDC-5 A
water • CED Drawings,
Sheet S-06
• Appendix 5
27
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.40 0.20 0.60 below Section IV-B
MDC-6 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.50 0.20 8.70 below Section IV-B
MDC-6 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.30 0.20 8.50 below Section IV-B
MDC-7 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.00 0.20 8.20 below Section IV-B
MDC-7 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
9.50 0.20 9.70 below Section IV-B
MDC-7 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack at Section II-C,
2.50 0.20 2.70 midsecti Section IV-B
MDC-8 D
on • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
1.40 0.20 1.60 below Section IV-B
MDC-8 D
water • CED Drawings,
Sheet S-06
• Appendix 5
28
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Notes
Original Add: Length (from Reference from
Bent No. Pile ID
(m) Cover (m) Harbor Report
Star)
• Final Report,
Crack Section II-C,
0.30 0.20 0.50 below Section IV-B
MDC-9 E
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.50 0.20 8.70 below Section IV-B
MDC-9 F
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
8.40 0.20 8.60 below Section IV-B
MDC-10 C
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
7.10 0.20 7.30 below Section IV-B
MDC-11 B
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
0.30 0.20 0.50 above Section IV-B
MDC-11 D
water • CED Drawings,
Sheet S-06
• Appendix 5
• Final Report,
Crack Section II-C,
9.90 0.20 10.10 below Section IV-B
MDC-11 D
water • CED Drawings,
Sheet S-06
• Appendix 5
HC
HAIRLINE 61.20 above • Final Report,
CRACKS water Section IV-A
29
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Estimated
Length Width
No. Location Area Reference in the Report
(mm) (mm)
(sq.m)
1. Final Report, Section II-
E, Section IV-C
1 Grid 2-3, Pile ID A-B 4877 2965
2. CED Drawings, Sheet
14.46 S-07
1. Final Report, Section II-
E, Section IV-C
2 Grid 2-3, Pile ID B-C 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
3 Grid 3-4, Pile ID A-B 4877 2965
2. CED Drawings, Sheet
14.46 S-07
1. Final Report, Section II-
E, Section IV-C
4 Grid 3-4, Pile ID B-C (1) 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
5 Grid 3-4, Pile ID B-C (2) 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
6 Grid 4-5, Pile ID E-F 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
7 Grid 5 Beam (1) 5865 526
2. CED Drawings, Sheet
3.08 S-07
1. Final Report, Section II-
E, Section IV-C
8 Grid 5 Beam (2) 5865 526
2. CED Drawings, Sheet
3.08 S-07
1. Final Report, Section II-
E, Section IV-C
9 Grid 5-6, Pile ID E-F 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
10 Grid 5-6, Pile ID F-G 4877 2287
2. CED Drawings, Sheet
11.15 S-07
30
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Estimated
Length Width
No. Location Area Reference in the Report
(mm) (mm)
(sq.m)
1. Final Report, Section II-
E, Section IV-C
11 Grid 6-7, Pile ID E-G 4877 4574
2. CED Drawings, Sheet
22.31 S-07
1. Final Report, Section II-
E, Section IV-C
12 Grid 11-12, Pile ID C 4877 2230
2. CED Drawings, Sheet
10.88 S-07
1. Final Report, Section II-
E, Section IV-C
13 Grid 13-14, Pile ID B-C 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
14 Grid 13-14, Pile ID E-G 4877 4574
2. CED Drawings, Sheet
22.31 S-07
1. Final Report, Section II-
E, Section IV-C
15 Grid 15-16, Pile ID E-F 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
16 Grid 15-16, Pile ID F 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
17 Grid 15-16, Pile ID F-G 4877 2287 E, Section IV-C2. CED
11.15 Drawings, Sheet S-07
1. Final Report, Section II-
E, Section IV-C
18 Grid 16-17, Pile ID B 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
19 Grid 19-20, Pile ID C 4877 2230
2. CED Drawings, Sheet
10.88 S-07
1. Final Report, Section II-
E, Section IV-C
20 Grid 23 Beam 5865 1052
2. CED Drawings, Sheet
6.17 S-07
1. Final Report, Section II-
E, Section IV-C
21 Grid 27-28, Pile ID E 4877 4574
2. CED Drawings, Sheet
22.31 S-07
1. Final Report, Section II-
E, Section IV-C
22 Grid 32-33, Pile ID A-B 4877 2965
2. CED Drawings, Sheet
14.46 S-07
31
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
Estimated
Length Width
No. Location Area Reference in the Report
(mm) (mm)
(sq.m)
1. Final Report, Section II-
E, Section IV-C
23 Grid 32-33, Pile ID B-C 4877 2287
2. CED Drawings, Sheet
11.15 S-07
1. Final Report, Section II-
E, Section IV-C
24 Grid 33, Pile ID E 4877 2230
2. CED Drawings, Sheet
10.88 S-07
1. Final Report, Section II-
E, Section IV-C
25 Grid 33, Pile ID F-G 4877 4574
2. CED Drawings, Sheet
22.31 S-07
1. Final Report, Section II-
E, Section IV-C
26 Grid 34-35, Pile ID C-D (1) 4877 2173
2. CED Drawings, Sheet
10.60 S-07
1. Final Report, Section II-
E, Section IV-C
27 Grid 34-35, Pile ID C-D (2) 4877 2173
2. CED Drawings, Sheet
10.60 S-07
B. Fenders
FENDERS
Type
No. Location Notes Reference in the Report
of Fender
32
STRUCTURAL ASSESSMENT AND PROPOSED SUPPLEMENT TO THE FINAL REPORT Rev 02
REHABILITATION/ REPAIR WORKS FOR POL PIER 1 June 2022
33