1. Check for verticality of the hoist mast 2. Is anchorage for the mast and supporting structure adequate? Yes/No 3. Is end mast piece is provided? Yes/No 4. Is over hoist limit switch working? Yes/No 5. Condition of ropes and diversion pulleys Yes/No 6. Is hoist position safe, free from falling material hazard? Yes/No 7. Is Winch platform strong, provided with hand rail & toe-board? Yes/No 8. Is hoist break checked? Yes/No 9. Operator’s visibility to all unloading platforms and vice versa is clear? Yes/No 10. Are warning signals established& used? Yes/No 11. Is hoist protected from unauthorized operations? Yes/No 12. Is earthing provided? Yes/No 13. Are rotating parts of hoist adequately guarded including finger Guard for bucket movement? Yes/No 14. Is ground level entry to winch area is restricted with wicket gate? Yes/No 15. Is protection against tripping hazards due to railing of ropes provided? Yes/No 16. Are signaling system functioning (Light & Bell)? Yes/No 17. Are daily check procedure followed? Yes/No 18. Checked the operator’s fitness Yes/No 19. Are authorized operators are allowed all the time? Yes/No 20. SWL displays in terms of load, materials etc.? Yes/No 21. Restriction on the size &loading in the bucket? Yes/No
Any other safety issues: ……………………………………………………………………………………………………………………………
OHSE Incharge of Contractor signature/Name/Date: …………………./………………/……………………
Discipline P&M Engineer of Contractor Signature/Name/Date: ……………………../……………………../…………………