You are on page 1of 40

Lanpan

(CoReg 200613209N)

WEEKLY CHECK CONTENT


AHT. LANPAN 27

No. Item Description


1 Smoke detector/Fire alarm Check and test functional.
2 CO2 system Test alarm.
3 Quick Closing Valave Check and Test.
4 Water Tight Door Alarm System Check and Test.
5 FIFI Monitor System Grease, Check Electrical System and Test if require.
6 Fix Emergency Fire Pump Check and Test Operation.
7 Hyd. Deck Machinery Check and Test if required.
8 Bilge High Level Alarm Check and Test.
9 Emergency Generator Check Oil level and Test if required.
10 Battery/Emergency Light Check Electrical System and Test if require.
11 Emergency Steering Check Oil level and Test if Require.
12 Telegraph / Internal Telephone Check and Test.
13 Rescue Boat Check and Test if required.
14 Oily Water Separator Check and Test if required.
15 Sewage Treatment Plant Check system and electrical part/functional

ADDITIONAL COMMENT:
1. PLEASE LOG DOWN AFTER CHECKED OR TESTED ALL EQUIPMENTS IN ENGINE LOG BOOK AND P.M.S.
2. WEEKLY CHECK COULD BE DELAYED WHEN EQUIPMENT FAILURE OR OPERATION CONDITION.

PREPARED BY:
CHIEF ENGINEER
Interval
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly
Weekly

OOK AND P.M.S.


NDITION.

EPARED BY:
EF ENGINEER
Lanpan
(CoReg 200613209N)

FIRE ALARM SYSTEM WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE HEAT DETECTOR SMOKE DETECTOR MANUAL CALL POINT REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

CO2 SYSTEM WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE CO2 MAIN V/V SWITCH NO.1 CO2 BOX SWITCH NO.2 CO2 BOX SWITCH REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

QUICK CLOSING VALVE WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE AIR RESERV. PRESS. VALVE TO BE TESTED AIR RELEASE VALVE REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

WATER TIGHT DOOR ALARM WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE SG/R (P) SG/R (S) AFT E/R (C) AFT E/R (P) FWD E/R (P) FWD E/R (S) REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

FIFI MONITOR WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

MANUAL OPERATING REMOTE OPERATING


DATE REMARKS
TEST PORT STBD TEST PORT STBD
UP UP
DOWN DOWN
LEFT LEFT
RIGHT RIGHT
NOZZLE NOZZLE
UP UP
DOWN DOWN
LEFT LEFT
RIGHT RIGHT
NOZZLE NOZZLE
UP UP
DOWN DOWN
LEFT LEFT
RIGHT RIGHT
NOZZLE NOZZLE
UP UP
DOWN DOWN
LEFT LEFT
RIGHT RIGHT
NOZZLE NOZZLE
UP UP
DOWN DOWN
LEFT LEFT
RIGHT RIGHT
NOZZLE NOZZLE
UP UP
DOWN DOWN
LEFT LEFT
RIGHT RIGHT
NOZZLE NOZZLE

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

FIX EMERGENCY FIRE PUMP WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE LOCAL START/STOP BRIDGE START/STOP DISCHARGE PRESSURE REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

DECK MACHINERY WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

AHT WINCH FWD TOWING WINCH ANCHOR WINDLASS TUGGER WINCH VERTICAL CAPSTAN WIRE STORAGE KARM FORK
DATE REMARKS
Check Local Remote Check Local Remote Check Port Stbd Check Port Stbd Check Port Stbd Check No.1 No.2 Check Local Remote
Clutch In Clutch In Clutch In Clutch In Clutch In Clutch In Pin Up
Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Pin Down
Break On Break On Break On Break On Break On Break On Fork Up
Break Off Break Off Break Off Break Off Break Off Break Off Fork Down
Ratchet Ratchet
Clutch In Clutch In Clutch In Clutch In Clutch In Clutch In Pin Up
Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Pin Down
Break On Break On Break On Break On Break On Break On Fork Up
Break Off Break Off Break Off Break Off Break Off Break Off Fork Down
Ratchet Ratchet
Clutch In Clutch In Clutch In Clutch In Clutch In Clutch In Pin Up
Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Pin Down
Break On Break On Break On Break On Break On Break On Fork Up
Break Off Break Off Break Off Break Off Break Off Break Off Fork Down
Ratchet Ratchet
Clutch In Clutch In Clutch In Clutch In Clutch In Clutch In Pin Up
Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Pin Down
Break On Break On Break On Break On Break On Break On Fork Up
Break Off Break Off Break Off Break Off Break Off Break Off Fork Down
Ratchet Ratchet
Clutch In Clutch In Clutch In Clutch In Clutch In Clutch In Pin Up
Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Pin Down
Break On Break On Break On Break On Break On Break On Fork Up
Break Off Break Off Break Off Break Off Break Off Break Off Fork Down
Ratchet Ratchet
Clutch In Clutch In Clutch In Clutch In Clutch In Clutch In Pin Up
Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Clutch Out Pin Down
Break On Break On Break On Break On Break On Break On Fork Up
Break Off Break Off Break Off Break Off Break Off Break Off Fork Down
Ratchet Ratchet

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

BILGES ALARM WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE FWD. ER (P) FWD. ER (S) AFT. ER (P) AFT. ER (S) BTR (C) SGR (C) REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

EMERGENCY GENERATOR WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE SPRING START ELECTRIC START BLACKOUT AUTO START & LOAD REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

BATTERY/EMERGENCY LIGHT WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

A/E No.1 A/E No.2 A/E No.3 A/E No.4 BT/E EG/E EM/L No.1 EM/L No.1 GMDSS FR BOAT ALDIS
DATE DESCRIPTION REMARKS
1 2 1 2 1 2 1 2 1 2 1 2 1 2 3 4 1 2 3 4 1 2 1 2 1 2
Battery Voltage
(+) Connection
(-) Connection
Charger
Battery Voltage
(+) Connection
(-) Connection
Charger
Battery Voltage
(+) Connection
(-) Connection
Charger
Battery Voltage
(+) Connection
(-) Connection
Charger
Battery Voltage
(+) Connection
(-) Connection
Charger
Battery Voltage
(+) Connection
(-) Connection
Charger

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

EMERGENCY STEERING WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

MANUAL WHEEL OPERATED ELECTRIC SOLENOID OPERATED


DATE REMARKS
PORT RUDDER STBD RUDDER PORT RUDDER STBD RUDDER

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

ENGINE TELEGRAPH & INTERNAL TELECOM WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

W/H TO E.C.R TELEGRAPH W/H TO E/R TELEGRAPH


DATE REMARKS
PORT STBD PORT STBD

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

RESCUE BOAT ENGINE & DAVIT CRANE WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE ENGINE TEST DAVIT CRANE TEST BATTERY CHECK/CHARGING REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

OILY WATER SEPARATOR WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE PLUNGER PUMP SOLENOID 3 WAY V/V 15 PPM ALARM SENSOR REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER
Lanpan
(CoReg 200613209N)

SEWAGE TREATMENT PLANT WEEKLY CHECK


AHT. LANPAN 27

MONTH OF JANUARY 2017

DATE AIR P/P NO.1 AIR P/P NO.2 CRUSH P/P DISCH. P/P SUCT. P/P HL. ALARM REMARKS

ADDITIONAL COMMENT:

ACKNOWLEDGE BY:

CHIEF ENGINEER

You might also like