DAFTAR KUANTITAS DAN HARGA

SKPA : Dinas Pengairan


Sub Kegiatan : Pembangunan Seawall dan Bangunan Pengaman Pantai
Pekerjaan : Supervisi Pembangunan Bangunan Pengaman Pantai Muara Batu Kab. Aceh Utara
Lokasi : Kabupaten Aceh Utara
Tahun Angaran : 2022 pagu
selisih
HARGA JUMLAH Harga Setelah
NO. URAIAN PEKERJAAN VOLUME SAT. PPn 10%
SATUAN (Rp.) HARGA (Rp.) Pajak
1 2 3 4 5 6 6 7

I. BIAYA LANGSUNG PERSONIL #REF!


A TENAGA AHLI
1 Ketua Tim S-1 (3 tahun) 1 Org x 7.00 Bln 7.00 OB 23,457,000.00 164,199,000.00 16,419,900.00 180,618,900.00
A. BIAYA TENAGA PENDUKUNG 109,000,000.00
1 Inspector D-3 (3 tahun) 1 Org x 7.00 Bln 7.00 OB 8,500,000.00 59,500,000.00 5,950,000.00 65,450,000.00
2 Surveyor D-3 (4 tahun) 1 Org x 2.00 Bln 2.00 OB 9,000,000.00 18,000,000.00 1,800,000.00 19,800,000.00
3 Tenaga K3 SMK 1 Org x 7.00 Bln 7.00 OB 4,500,000.00 31,500,000.00 3,150,000.00 34,650,000.00
4 Tenaga Lokal 1 Org x 2.00 Bln 2.00 OB 3,100,000.00 6,200,000.00 620,000.00 6,820,000.00

II. BIAYA LANGSUNG NON PERSONIL #REF!


A. BIAYA KANTOR 23,800,000.00
1 Base Camp 1 Unit x 7.00 Bln 7.00 Bln 1,000,000.00 7,000,000.00 700,000.00 7,700,000.00
2 Biaya Komunikasi 7.00 Ls/Bln 1,000,000.00 7,000,000.00 700,000.00 7,700,000.00
3 Personal computer (sewa) 1 Unit x 7.00 Bln 7.00 unit bln 400,000.00 2,800,000.00 280,000.00 3,080,000.00
4 Printer A3 1 Unit x 7.00 Bln 7.00 unit bln 250,000.00 1,750,000.00 175,000.00 1,925,000.00
5 Alat Tulis Kantor dan Bahan Komputer 7.00 Ls/Bln 750,000.00 5,250,000.00 525,000.00 5,775,000.00

B. BIAYA SEWA KENDARAAN 24,000,000.00


1 Kendaraan roda dua 1 1 Unit x 7.00 Bln 7.00 unit bln 1,500,000.00 10,500,000.00 1,050,000.00 11,550,000.00
2 Kendaraan roda dua 2 1 Unit x 7.00 Bln 7.00 unit bln 1,500,000.00 10,500,000.00 1,050,000.00 11,550,000.00
3 Kendaraan roda dua 3 1 Unit x 2.00 Bln 2.00 unit bln 1,500,000.00 3,000,000.00 300,000.00 3,300,000.00

C. PERLENGKAPAN KESELAMATAN DAN KESEHATAN KERJA (K3) 2,625,000

1 Topi Pelindung (Safety Helmet) 5.00 Bh 75,000.00 375,000.00 37,500.00 412,500.00


2 Pelindung Penafasan dan Mulut (Masker) 5.00 Bh 50,000.00 250,000.00 25,000.00 275,000.00
3 Pelindung Mata (Goggles,Spectacles) 5.00 Bh 50,000.00 250,000.00 25,000.00 275,000.00
4 Sarung Tangan (Safety Gloves) 5.00 Pasang 50,000.00 250,000.00 25,000.00 275,000.00
5 Sepatu Keselamatan (Safety Shoes) 5.00 Pasang 150,000.00 750,000.00 75,000.00 825,000.00
6 Rompi Keselamatan (Safety Vest) 5.00 Bh 50,000.00 250,000.00 25,000.00 275,000.00
7 Peralatan P3K 1.00 Ls 500,000.00 500,000.00 50,000.00 550,000.00

D. BIAYA PELAPORAN (PENGGANDAAN) 6,150,000.00


1 Rencana Mutu Kontrak 1.0 Bk x 3 Copy 3.00 Buku 100,000.00 300,000.00 30,000.00 330,000.00
2 Laporan bulanan 2 Buku x 7.00 Bln 14.00 Buku 100,000.00 1,400,000.00 140,000.00 1,540,000.00
3 Laporan Pelaksanaan RKK 1 Buku x 7.00 Bln 7.00 Buku 100,000.00 700,000.00 70,000.00 770,000.00
4 Final Laporan :
- Laporan Pendahuluan 1.0 Bk x 3 Copy 3.00 Buku 100,000.00 300,000.00 30,000.00 330,000.00
- Laporan Akhir (Cover Exclusive) 1.0 Bk x 2 Copy 3.00 Buku 150,000.00 450,000.00 45,000.00 495,000.00
5 Shop & As Built Drawing (A3) 1.0 Bk x 5 Copy 3.00 Buku 150,000.00 450,000.00 45,000.00 495,000.00
6 Laporan Hasil Pengukuran MC (Awal & Akhir) 1.0 Bk x 2 Copy 3.00 Buku 100,000.00 300,000.00 30,000.00 330,000.00
Exernal Memory 1 TB (berisi Procecing data, Peta, Perancangan, Foto-foto dan
7 1.00 Bh 1,500,000.00 1,500,000.00 150,000.00 1,650,000.00
seluruh Laporan)
8 Foto Dokumentasi 1.0 Bk x 3 Copy 3.00 Album 250,000.00 750,000.00 75,000.00 825,000.00

TOTAL 369,571,400.00

............, ...................., 2022


Penyedia Jasa,

Nama Lengkap
Jabatan