You are on page 1of 7

POWER ELECTRONICS

EPO510

SOFTWARE ASSIGNMENT

CLASS GROUP: EE2425D

GROUP NUMBER: 5

NAME STUDENT ID

NOR ZULAIKA ZAFIRAH AZMIN 2019314963


GROUP 5
MUHAMAD AMIRRUL ASYRAF KHAIRUDDIN 2018206644

RAJA MUHAMMAD AIMAN RAJA AHZAN 2017970703


(SOFTWARE) ASSIGNMENT EVALUATION FORM

POWER ELECTRONICS (EPO510), FACULTY OF ELECTRICAL ENGINEERING, UNIVERSITI TEKNOLOGI MARA

LECTURER’S NAME: PN NAJWA NASUHA MAHZAN

GROUP NO: 5 SUBMISSION DATE: 23/1/2021

PROBLEM NO: 4 PRESENTATION DATE: 22/1/2021

STUDENT’S NAME ID NO.

1. MUHAMAD AMIRRUL ASYRAF BIN KHAIRUDDIN 2018206644


2. NOR ZULAIKA ZAFIRAH AZMIN 2019314963

3. RAJA MUHAMMAD AIMAN RAJA AHZAN 2017970703


4.

SIMULATION WORK (10 MARKS) (To be filled up by Lecturer)

Marks (M) Weighted


Assessment Psychomotor Marks Marks
CO PO
Criteria Level (P) Allocated 0 1 2 3 4 5 Obtained
(WMO)
Demonstrate the 3 3 5 5 Construct a Construct a Construct a Construct a Construct a Construct a =(M X 1)
construction of simulation simulation simulation simulation simulation simulation
converter circuit circuit circuit circuit circuit circuit
circuits according to according to according to according to according to according to
correctly. the question. the question. the question. the question. the question. the question.
(more than 8 (7 – 8 (5 – 6 (3 -4 (1 -2 (No mistake)
mistakes) mistakes) mistakes) mistakes) mistakes)
Demonstrate the 1 3 5 5 Generate Generate Generate Generate Generate Generate =(M X 1)
generation of control signals control signals control signals control signals control signals control signals
correct control according to according to according to according to according to according to
signals. the question. the question. the question. the question. the question. the question.
(more than 8 (7 – 8 (5 – 6 (3 – 4 (1 – 2 (No mistake)
mistakes) mistakes) mistakes) mistakes) mistakes)
Marks (M) Weighted
Assessment Psychomotor Marks Marks
CO PO
Criteria Level (P) Allocated 0 1 2 3 4 5 Obtained
(WMO)
Presentation 2 3 5 10 Spoken and Spoken and Attempts to Integrates Good Excellent =(M X 2)
and delivery visual visual integrate spoken integration of integration
presentation presentation spoken and and visual spoken and of spoken and
is not is difficult visual presentation visual visual
understandabl to follow and presentation. well. presentation. presentation.
e. understand.

Ability to verify 4 3 5 10 Unable to 20% of 40% of 60% of 80% of All simulation =(M X 2)
simulation verify all simulation simulation simulation simulation results have
results using simulation results have results have results have results have been
suitable results. been been been been successfully
simulation tools. successfully successfully successfully successfully verified.
verified. verified. verified. verified.

Max Marks 30 Total Evaluated Marks (TEM)

Total WMO (14%) i.e. TEM x 1/3

Note:

Each group should submit


1. demonstration video*,
2. simulation file, and
3. report (mark rubric, question, simulation circuit with label and simulation results).

*Video content:
(a) simulation work.
(b) presenter.
4
Software Assignment

According to these following requirements, construct and simulate a single-phase full-bridge


inverter with SPWM control technique.

DC supply, Vs 120 V

Semiconductor power device Ideal IGBT

AC load R = 10 
L=-

Reference signal Vr Amplitude = 80% of Vs

Carrier ratio. mf 5

Switching frequency 500 Hz

Carrier signal, Vc
Type = Bipolar
Use ONE triangular source only. Waveshape = M-shape triangular

Modulation index, ma 0.8

Switching rules When Vr > Vc, PWM = 1


When Vr < Vc, PWM = 0

Measurement for simulation results a) Reference signal, Vr & Vc → adjust the y-


axis =  Vc.
b) PWM signal of (a), PWM1.
c) Inverter PWM signal of (b), PWM2
Use difference screen for (a) – (e) to show all d) Vout.
waveforms within 4 s  t  4.02 s. e) RMS output voltage, Vo_rms.
f) Harmonic spectrum of Vout. Set the x-axis
as follows:
• Scale = linear
• Range = from 0 to 1 kHz.

Simulation Control Total time = refer to the time range in the


Measurement cell.
Print time = refer to the time range in the
Measurement cell.
Software Assignment

Circuit

Figure 1: Single-phase full bridge inverter with SPWM control technique


a) Reference signal, Vr & Vc → adjust the yaxis =  Vc.

b) PWM signal of (a), PWM1.

c ) Inverter PWM signal of (b), PWM2


d) Vout

e) RMS output voltage, Vo_rns

f) Harmonic spectrum of Vout. Set the x-axis as follows:

• Scale = linear

• Range = from 0 to 1 kHz.

You might also like