You are on page 1of 37

BILL OF QUANTITIES

MEP WORKS
Arab open University New Extension
Al Shorouq City, Egypt

BILL OF QUANTITIES
MEP WORKS

TABLE OF CONTENTS

DIVISION NO. 14 - VERTICAL TRANSPORTATION

DIVISION NO. 21 - FIRE FIGHTING

DIVISION NO. 22 - PLUMBING

DIVISION NO. 23 - HVAC WORK

DIVISION NO. 26 - METALS

DIVISION NO. 27 - ELECTRICAL WORKS

DIVISION NO. 28 - COMMUNICATION WORKS

DIVISION NO. 32 - EXTERIOR IMPROVEMENT

TENDER SUMMARY T Sum 1/1

Arab open University New Extension


AOU-TDR-BOQ-CVL-01-REV00
February,2023 IND / 1 MEB INDEX
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 14 - VERTICAL TRANSPORTATION

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 142100- Vertical Transportation

1 Supply, delivery at site, installation, testing,


commissioning, starting up, training and maintenance
during the guarantee period all in a neat workmanlike
manner as per drawings and technical specifications
of the following:
A Factory assembled electric passenger machine room
elevator, Simplex control type, of capacity 1150 kg (17
persons), 4 stops , speed = 1.5 m/sec, VVVF control
system, complete with-but not limited to automatic
landing doors, automatic car door, doors to be center
telescopic opening and all other neccesary accecories
and components to make a complete job all as per
specification and drawing. Set 2
Floor Served : B,G,1st, and 2nd

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 1/2 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 14 - VERTICAL TRANSPORTATION

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

COLLECTION:
VERTICAL TRANSPORTATION

Page 1

TOTAL CARRIED TO SUMMARY

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 2/2 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 21 - FIRE FIGHTING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 210000- FIRE FIGHTING (Building)


Supply, delivery at site, installation, testing,
commissioning, starting up, training and maintenance
during the guarantee period all in a neat workmanlike
manner as per attached drawings and technical
specifications of the following:

1 FIRE PIPING NETWORK


Fire piping network including pipes, expansion pieces,
guides, valves, flow switches, grooved fittings, flexable
/ fixed coupling, automatic air vents, pressure reducing
valves, supports, hangers, steel I beam pipe rackes /
suports, etc, together with all necessary accessories for
workmanlike piping system from black steel
ERW(ELECTRIC RESISTANCE WELDED STEEL)
ASTM A53/A135 Schedule 40, complete with protective
coating, etc, and all other necessary accessories,
components and devices to make a complete job.

a-diameter 1.5" m 6
b-diameter 2.5" m 25
c-diameter 4" m 70
d-diameter 6" m 110

2 FIRE TRACE EXTINGUISHER SYSTEM

Fire Trace Extinguisher for elec. pannels CO2 gas 10


kg UL listed and FM approved complete with thermal
tube, pressure guage, extinguishing control panel, etc,
and all other necessary accessories and components,
all work are in a neat workmanlike manner as per
specification and drawings.
The system should be complete as shown on the
drawings and as indicated in the fire fighting
specifications and to comply with NFPA standards.

no 36

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 1/9 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 21 - FIRE FIGHTING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 CLEAN AGENT AUTOMATIC EXTINGUISHER


SYSTEM (FM-200)
CLEFM200 fire protection system, The system will have
the following components:
• FM200 cylinder(s) complete with the solenoid actuator
kit, brackets, etc
• Piping system from seamless carbon steel Sch.40
complete with all fittings, supports, valves, nozzles, etc.
• Fire detection, alarm and extinguishing control panel –
two zones double knock
• Optical smoke detector (s)
• Heat detector (s)
• Fire alarm bell with flash light; two Manual alarm &
break glass unit
• Manual release station, abort switch
and all other necessary accessories, components and
devices to make a complete job.
The system should be complete as shown on the
drawings and as indicated in both the fire fighting and
fire alarm specifications and to comply with NFPA
standards. UL listed and FM approved.AN AGENT
AUTOMATIC EXTINGUISHER SYSTEM (FM-200)

a-FM-200 Cylinder 40 kg. no 1


b-FM-200 Cylinder 42 kg. no 1
c-FM-200 Cylinder 45 kg. no 1
d-FM-200 Cylinder 47 kg. no 1

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 2/9 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 21 - FIRE FIGHTING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 FIRE HOSE CABINET


Hose reel fire cabinets, fully recessed / exposed (FHC),
as per arch. site engineer, complete with 2.5" service
ball valve, 1.5" brass angle valve, fire hose reel, 1" fire
hose 30 m long, steel cabinet, adjustable nozzle, 2.5"
pressure reducing valve, 2.5" landing valve for firemen
use only, 2.5" fire hose 30 m long, fire extinguisher co2,
fire extinguisher dry chemical bowder and all other
necessary accessories, components and devices to
make a complete job.All accesories should be UL listed
and FM approved .
Class III no 15

2 Manual fire extinguishers


a- 6 kg CO2 portable fire extinguisher complete with
wall/floor mounting bracket, and all other necessary
accessories, components and devices to make a
complete job. no 44
b- 6 kg multi-purpose dry powder fire extinguisher
complete with wall mounting bracket, and all other
necessary accessories, components and devices to
make a complete job no 33
c- Foam wheeled fire extinguishing device 45 litre with
external pressure cylinder complete with all other
necessary accessories, components and devices to
make a complete job. no 1

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 3/9 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 21 - FIRE FIGHTING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

VALVES

1 OS&Y Indicating valve with electric tamper switch All


components should be UL listed and FM approved
a- 6” OS&Y no 1
b- 4” OS&Y no 3

2 Fire Brigade Siamese connection, two-way valves of


sizes 6"x21/2"x21/2" and main pipe size 6" as approved
by Fire Brigade and NFPA listed. At location as shown
on the design drawing, complete with pipe fitting, check
valve 6" and supports, and all other necessary
accessories, components and devices to make a
complete job.
no 1

3 Water flow detector (vane type),suitable for pipe size


and system pressure All components should be UL
listed and FM approved .
a- 6” no 1
b- 4” no 3

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 4/9 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 21 - FIRE FIGHTING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 210000- FIRE FIGHTING (layout)

1 Yard Fire Cabint


Hose reel fire cabinets, as per arch. site engineer,
complete with 2.5" fire hose reel, 30 m long, steel
cabinet, adjustable nozzle, and all adapters and fittings
required for the complete assembly as per
specifications and drawings. no 5

2 Fire Hydrant
Wet Fire hydrant 6" with two outlet 2 1/2" x 4" pumper
complete with Non Rising stem (NRS) as per
specifications and drawings, UL listed & FM approved,
all other necessary accessories, components and
devices to make a complete job. no 5

3 FIRE PIPING NETWORK


Fire piping network including pipes, supports,
expansion pieces, guides, fittings, pressure reducing
devices, etc, together with all necessary accessories for
workmanlike piping system from HDPE , PN16 ,
complete with protective coating, etc, as per
specifications and drawings.
a- diameter 6" m 350

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 5/9 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 21 - FIRE FIGHTING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

Valves
1 4” Air Vent Valve with isolating valve (Gate valve)
including all accessories, fitting, valve champer
construction, and valve champer cover to make
complete job..and all components should be UL listed
and FM approved .
no 1

2 4” Wash Out Valve including all accessories, fitting,


valve champer construction, and valve champer cover
to make complete job. and all components should be
UL listed and FM approved .
no 1

3 6” Non rising stem (NRS) valve with post indicator


including all accessories and fitting to make complete
job. All components should be UL listed and FM
approved. no 3

4 Fire Brigade Siamese connection, two-way valves of


sizes 6"x21/2"x21/2" and main pipe size 6" as approved
by Fire Brigade and NFPA listed. At location as shown
on the design drawing, complete with pipe fitting, check
valve 6" and supports, and all other necessary
accessories, components and devices to make a
complete job.
no 1

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 6/9 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 21 - FIRE FIGHTING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 213113 - Electrical Fire Pumps

Supply, delivery at site, installation, testing,


commissioning, starting up, training and maintenance
during the guarantee period all in a neat workmanlike
manner as per attached drawings and technical
specifications of the following:

1 Electric horizontal, centrifugal split-case fire pump


complete as specified designed to deliver 1000 GPM at
a total head of 8 bar complete with the specified drivers,
controls, pressure gauges, suctions, delivery piping,
valves, fittings, connections, automatic air release valve
and pump rated accessory items, including pump
controller, all shall be UL listed, FM approval & NFPA -
20 standard. The item includes also a base with
concrete inertia foundation, suction and delivery piping,
valves, fittings, power and control cables, galvanized
steel conduits, galvnized cable trays,....etc. from the
electric disconect switch to the control panel of the
pump,all necessary equioment,ATS,modules and all the
work to Connect pumps to Emergency power supply as
per standrads in aturn key job, and all other necessary
accessories, components and devices to make a
complete job.
set 2

SECTION 213400 - Pressure Maintenance Pumps


2 Jockey electrical fire fighting pump of capacity 50 GPM,
head 8.7 bar, frame NEMA standard, mechanical seal,
pressure gauges and pump controller complete with all
suctions, delivery piping, valves, fittings, connections,
The item includes also a base with concrete inertia
foundation, suction and delivery piping, valves, fittings,
power and control cables, galvanized steel conduits,
galvnized cable trays,....etc. from the electric disconect
switch to the control of the pump, and all other
necessary accessories, components and devices to
make a complete job.
set 1

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 7/9 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 21 - FIRE FIGHTING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 210000 - Fire Suppression


SECTION 211313 - Wet Pipe Sprinkler System_S

SECTION Y Clauses_ Mechanical & PH


1 Piping network inside the pump room from black
seamless steel pipes Schedule 40, complete with
valves, check valves,strainers, fittings, coupling,
gauges, pressure & flow switches, venture -type test
flow meter (UL listed & FM approved), hangers,
supports, Puddle Flanges, etc. all in a workman like
manner as per drawings and specifications. The pump
room piping work and valves layout should satisfies the
NFPA20. The item includes Automatic wet alarm valve
with water gong (UL Listed, FM approved) and also
automatic pressure relief valve according to NFPA 20,
and all other necessary accessories, components and
devices to make a complete job.
l.sum 1

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 8/9 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 21 - FIRE FIGHTING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

COLLECTION:
FIRE FIGHTING

Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8

TOTAL CARRIED TO SUMMARY

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 9/9 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 22 000- plumbing fixtur units


1 Per number, Supply, install, test and commission
Western water closet (floor standing close coupled
back to wall wc bowl with sandwich type soft closing
seat & cover (thin),fixation set with douche). with
flushing tank from the best quality , specified color
according to drawings and technical consultant
approval , the price include all fittings and special parts
, valves and all horizontal & vertical piping (drainge &
water) with uPVC pipes to sewage riser outside w.c or
to the nearest Inspection chamber, water supply by
polypropylene pipes from the nearest source of water
supplyand all the necessary items to complete the work
according to the principles of industry.
no 30

2 Western water closet (handicap floor standing close


coupled wc bowl including fixation set with douche).
with flushing tank from the best quality , specified color
according to drawings and technical consultant
approval , the price include all fittings and special parts
, valves and all horizontal & vertical piping (drainge &
water) with uPVC pipes to sewage riser outside w.c or
to the nearest Inspection chamber, water supply by
polypropylene pipes from the nearest source of water
supplyand all the necessary items to complete the work
according to the principles of industry.
no 8

3 Per number,Supply, install, test and commission


lavatory (countertop round 48cm, wash basin central
tap hole punshed) from the best quality , specified color
according to drawings and technical consultant
approval , the price include all fittings and special parts
,hot water mixer, valves and all horizontal & vertical
piping (drainge & water) with uPVC pipes to sewage
riser outside w.c or to the nearest Inspection chamber,
water supply by polypropylene pipes from the nearest
source of water supplyand all the necessary items to
complete the work according to the principles of
industry. no 48

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 1/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 Per number,Supply, install, test and commission


lavatory (wash basin handicap 61cm with elbow
support, central tap hole punched) from the best quality
, specified color according to drawings and technical
consultant approval , the price include all fittings and
special parts ,hot water mixer, valves and all horizontal
& vertical piping (drainge & water) with uPVC pipes to
sewage riser outside w.c or to the nearest Inspection
chamber, water supply by polypropylene pipes from the
nearest source of water supplyand all the necessary
items to complete the work according to the principles
of industry. no 8
2 Per number,Supply, install, test and commission urinal
(mini washbrook urinal w/douche back inlet) on wall
from the best quality , specified color according to
drawings and technical consultant approval , the price
include all fittings and special parts , valves and all
horizontal & vertical piping (drainge & water) with uPVC
pipes to sewage riser outside w.c or to the nearest
Inspection chamber, water supply by polypropylene
pipes from the nearest source of water supply and all
the necessary items to complete the work according to
the principles of industry.
no 24
3 Per number,Supply, install, test and commission
shower (square shower tray 90x90cm for floor standing
installation or floor recessed installation) from the best
quality , specified color according to drawings and
technical consultant approval , the price include all
fittings and special parts ,hot water mixer, valves and all
horizontal & vertical piping (drainge & water) with uPVC
pipes to sewage riser outside w.c or to the nearest
Inspection chamber, water supply by polypropylene
pipes from the nearest source of water supply and all
the necessary items to complete the work according to
the principles of industry.
no 2

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 2/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 Per number,Supply, install, test and commission


hadicap shower (square shower tray handicap 90x90cm
for floor standing installation or floor recessed
installation) from the best quality , specified color
according to drawings and technical consultant
approval , the price include all fittings and special parts
,hot water mixer, valves and all horizontal & vertical
piping (drainge & water) with uPVC pipes to sewage
riser outside w.c or to the nearest Inspection chamber,
water supply by polypropylene pipes from the nearest
source of water supply and all the necessary items to
complete the work according to the principles of
industry.
no 1

2 Solar Energy For Heating Supply and installation Solar


Energy For Heating, including Electric Heater Unit ,
Solar Cells Panels ,thermometer ,hot water circulating
pump ,pressure gauge, pressure reducing valve , Non
Return Valve, all Valve , fitting , all necessary
accessories as specified and as shown on drawings

a- 500 liter no 4

Water SUPPLY PIPES

3 Per linear meter Supply, install, test and commission


polypropline pipes PN 16 cold water under groud
complete with all fittings , flexiable joints,valves ,
supports , fixing , special peices and all necessary
works according to the drawing and the technical
consultant approval with the following diameters .
a- Diameter 110 mm m 17

4 Per linear meter Supply, install, test and commission


polypropline pipes PN16 Insulated pipes for cold water
supply pipes at roof complete with all fittings, flexiable
joints,valves,Isolation, and special pieces according to
the drawings, technical spcs. and all accessories to
complete the work with the following diameters .

a- Diameter 20mm m 45
b- Diameter 25mm m 5
c- Diameter 63mm m 40

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 3/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 Per linear meter Supply, install, test and commission


polypropline pipes PN 20 Insulated pipes for hot water
& return risers and suspended pipes on Roof and all
Floors complete with all fittings , flexiable joints,valves ,
supports , fixing , special peices and all necessary
works according to the drawing and the technical
consultant approval with the following diameters .

a- Diameter 20mm
m 360
b- Diameter 25mm
m 160
c- Diameter 32mm
m 55
d- Diameter 40mm
m 60
e- Diameter 50mm
m 20
f- Diameter 63mm
m 40

2 Per linear meter Supply, install, test and commission


polypropline pipes PN 16 for cold water supply risers
and suspended pipes complete with all fittings,
flexiable joints,valves and special pieces according to
the drawings, technical spcs. and all accessories to
complete the work with the following diameters.

a- Diameter 20mm m 430


b- Diameter 25mm
m 16
c- Diameter 32mm
m 315
d- Diameter 40mm
m 65
e- Diameter 50mm
m 80
f- Diameter 63mm
m 25
g- Diameter 75mm
m 15
h- Diameter 90mm
m 96
i- Diameter 110mm
m 5

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 4/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

VALVES :
1 Supply, install and testing of AIR VALVE , according to
the provided drawings, the Egyptian code, the attached
technical specifications and the principles of industry
works
a- Diameter 25mm no 6
2 Supply, install and testing of CHECK VALVE ,
according to the provided drawings, the Egyptian code,
the attached technical specifications and the principles
of industry works .
a- Diameter 20mm no 4
b- Diameter 25mm no 12
c- Diameter 75mm no 2
3 Supply, install and testing of ISOLATED VALVE ,
according to the provided drawings, the Egyptian code,
the attached technical specifications and the principles
of industry works .
a- Diameter 20mm no 19
b- Diameter 25mm no 19
c- Diameter 32mm no 17
d- Diameter 40mm no 18
e- Diameter 50mm no 8
f- Diameter 75mm no 6
4 Supply, install and testing of BALANCE VALVE ,
according to the provided drawings, the Egyptian code,
the attached technical specifications and the principles
of industry works
a- Diameter 25mm
no 16
5 Supply,Install Test and commission WATER TAP in
Roof & Basement complete with all fittings, and all the
necessary items to complete the work according to the
principles of industry. no 6
6 Supply, install, test and commissioning circulation
Pump with flow rate 1 L/S and 20m head 2 (duty +
standby) complete with the following:-
1- Suction, discharge and non-return valves and all the
special couplings.
2- all electrical works from operation and control panel,
complete with control and alarm devices, and operating
cables from the panel to the pumps necessary to
complete work according to the drawing and the
technical consultant approval . item 2

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 5/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

DRAINAGE PIPES

1 Per Meter supply ,install, test and commission UPVC


for drainage suspended pipes ( 6 Bar ) complete , the
price include all fittings ,fixing ,supports, clean outs
every 12-15 m, flexiable joints and necessary works ,
and all the necessary items to complete the work
according to the principles of industry.
a- Diameter 50mm
m 100
b- Diameter 75mm
m 320
c- Diameter 110mm
m 235
d- Diameter 160mm
m 160
2 Per Meter supply ,install, test and commission UPVC
for drainage underground pipes ( 6 Bar ) complete ,the
price included clean outs every 12-15 m ,earthwork in
excavation, backfilling, sand bedding, fittings, special
pieces , and all the necessary items to complete the
work according to the principles of industry.

a- Diameter 50mm
m 16
b- Diameter 75mm
m 32
c- Diameter 110mm
m 215
d- Diameter 160mm
m 10
3 Per Meter supply ,install, test and commission UPVC
for force main pipe (10 bar) from sump pit to slow down
chamber suspended or unsupended pipes complete ,
the price include all fittings ,fixing ,supports, flexiable
joints and necessary works,earthwork in excavation,
backfilling, sand bedding, fittings , and all the necessary
items to complete the work according to the principles
of industry.

a- Diameter 75mm
m 70

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 6/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 Per Meter supply ,install, test and commission UPVC (


6 Bar ) for condensate drain pipes suspended or
unsuspended pipes complete , the price include all
fittings,fixing ,supports, flexiable joints and necessary
works,earthwork in excavation, backfilling, sand
bedding, fittings , and all the necessary items to
complete the work according to the principles of
industry.
a- Diameter 20mm m 660
b- Diameter 25mm m 200
c- Diameter 32mm m 30
d- Diameter 40mm m 25
e- Diameter 50mm m 45

2 Supply, install, test and commission UPVC floor clean


out in slap from the best quality and water seal , the
price include all drainge pipes uPVC pipes to sewage
riser outside w.c or to the nearest Inspection chamber,
and all the necessary items to complete the work
according to the principles of industry.
a- Diameter 75mm
no 4
b- Diameter 110mm
no 8

3 Supply, install, test and commission UPVC funnel floor


drain in slap outlet with cover with trap of approved
pattern,from the best quality and water seal , the price
include all drainge pipes uPVC pipes to sewage riser
outside w.c or to the nearest Inspection chamber, and
all the necessary items to complete the work according
to the principles of industry.
a- Diameter 75mm
no 4

4 Per number, Supply, Install, Construct and test UPVC


Gully Trap with size 30x30 cm Price include
excavations in all surfaces, backfilling, sand bedding ,
fittings and connection to nearest Inspection Chamber
with upvc pipe 110 mm , and all the necessary items to
complete the work according to the principles of no 6
industry.

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 7/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 Supply, install, test and commission UPVC floor drain


under slap outlet inside tolites with Stainless Steel
cover with trap of approved pattern,from the best quality
and water seal , the price include all drainge pipes
uPVC pipes to sewage riser outside w.c or to the
nearest Inspection chamber, and all the necessary
items to complete the work according to the principles
of industry.
a- Floor Drain 75mm
no 48
2 Supply, install, test and commission UPVC Planter
Drain under slap of 75 mm outlet inside tolites with
Stainless Steel cover with trap of approved pattern,from
the best quality and water seal , the price include all
drainge pipes uPVC pipes to sewage riser outside w.c
or to the nearest Inspection chamber, and all the
necessary items to complete the work according to the
principles
a- Planter of industry.
Drain 75mm
no 6
3 Per number, Supply, install, test and commission pvc
Roof Drain with trap from the best quality Price shall
include the connection to the nearest rain drain stack
,all fittings ,fixing ,special pieces and all necessary to
complete work according to the drawing and the
technical consultant approval.
a- 75mm Roof Drain (Bottom Outlet - RD)
no 5
110mm Roof Drain (Side Outlet - RD)
no 2
4 Supply, install, test and commission UPVC Area drain
in slap of 110 mm outlet with cover with trap of
approved pattern,from the best quality and water seal ,
the price include all drainge pipes uPVC pipes to
sewage riser outside w.c or to the nearest Inspection
chamber, and all the necessary items to complete the
work according to the principles of industry.
a- Area Drain no 6
5 Supply, Construct, install and test Submersible pumps
Chamber 2 (1 + 1) pumps flow 55 gpm, head 11
meters, and all electrical works from operation and
control panel, complete with control and alarm devices,
and operating cables from the panel to the pumps
necessary to complete work according to the drawing
and the technical consultant approval .
(To be submitted with the bid catalogs of the proposed
unit)
item 2

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 8/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 Per Number supply, constract, insatll and test


Inspection Chamber with sizes according to drawings
,complete as specified Price shall include excavations
in all surfaces, backfilling, hauling debris, form work,
built by cement blocks from best types ,The interior of
the walls and the sector of the interior cement and sand
mortar 2: 1 thickness of 2 cm on the two layers and
service of well-honed by the harvester and rounded
angles and corners and the work of shaving concrete
cement around the throat cast with a blanket sand sand
and cement mentioned above and the price includes
drilling and landfill and the transfer of waste to public
dumps, , cast Chamber
a- Inspection iron grating
of cover and
Internal frame,
size and
60x90 cmall
no 1

2 Per Number supply, Construct Slow down champer with


Internal, complete as specified Price shall include
excavations in all surfaces, backfilling, hauling debris,
form work, built by cement blocks from best types ,The
interior of the walls and the sector of the interior cement
and sand mortar 2: 1 thickness of 2 cm on the two
layers and service of well-honed by the harvester and
rounded angles and corners and the work of shaving
concrete cement around the throat cast with a blanket
sand sand and cement mentioned above and the price
includes drilling and landfill and the transfer of waste to
public dumps, , cast iron grating cover and frame, and
all necessary to complete work according to the
drawing and the technical consultant approval .

a- Slow down champer 80x120 cm no 1

3 Per Number supply, constract, insatll and test Catch


Basin with sizes according to drawings ,complete as
specified Price shall include excavations in all surfaces,
backfilling, hauling debris, form work, built by cement
blocks from best types ,The interior of the walls and the
sector of the interior cement and sand mortar 2: 1
thickness of 2 cm on the two layers and service of well-
honed by the harvester and rounded angles and
corners and the work of shaving concrete cement
around the throat cast with a blanket sand sand and
cement mentioned above and the price includes drilling
and landfill and the transfer of waste to public dumps, ,
a- Catch Basin of Internal size 60x90 cm no 2

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 9/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 221116-A COLD WATER


SECTION Y Clauses_ Mechanical & PH
1 A factory assembled and tested vertical booster
pumping set variable speed complete package of Three
pumps (2 working + 1 stand by ) , each having
discharge 4 L/sec at 41 m head, complete with electric
motors base with concrete inertia foundation, tested at
factory together with all necessary accessories required
for the specified performance. The set includes gate
valves at intake and at delivery as well as check valves
at delivery, the suction inlets to each pump is to be
provided with a strainer. The item includes also two
bladder tank,of capacity 250 Liter complete with all
accessories pre-charged type, pump control panel,
pressure switches, dry run sensors, transceiver,
transducers and all accessories.

set 1
2 Domestic water network inside the pump room from
Galvanized steel pipe schedule 40 and suction piping
from main water network ( or municipality network ) to
underground water tank from HDPE and all pipes
complete with fittings, headers, valves, hangers,
supports,Puddle Flanges, etc. which required for the
specified operating condition in a neat workmanship. l.sum 1

SECTION 221316 - B Foul Drainage Aboveground

3 Submersible pumps 3 L/s discharge, and 15m head,


complete with all check valves, gate valves, automatic
float switches, power and control cables, galvanized
steel conduits, galvnized cable trays,....etc. from the
electric disconect switch to the control of the pump,
UPVC piping to nearest sewage point & fittings, etc.
Pumps and motors shall be preassembled and tested in
factory, and all other necessary accessories,
components and devices to make a complete job.

l.sum 1

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 10/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 22 - PLUMBING

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

COLLECTION:
PLUMBING

Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10

TOTAL CARRIED TO SUMMARY

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 11/11 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

General
1 Supply, installation, testing, adjusting, balancing,
commissioning and guarantee including operation,
maintenance, tools and spare parts as per the
specifications, and ASHRAE standards for the following
HVAC items:
The Contractor should read the BOQ with conjunction
specifications, schedules and detailed drawings to
control the price of each equipment.
All HVAC equipment shall complete with all control
valves and hook-up (for inlet and outlet standard
details).

SECTION 23 6426 - ROTARY-SCREW WATER


CHILLERS
2 Complete packaged air- cooled water chiller of chilled
water from 54°F to 44°F at ambient air temperature of
110 °F (environment friendly refrigerant ) The unit is
complete with but not limited to: screw compressors, air-
cooled condenser, evaporators, refrigerant , lubrication
system , flow switches, Pressurization unit (Compressor
controlled) complete with closed type expansion tank as
per specifications ,microprocessor control panel,
electrical wiring to nearest power source, starters and
overload and suitable for 380V, 3-phase operation, 50
Hz, vibration isolators,concrete inertia foundation and
all other necessary accessories,components and hook
up to make acomplete job.

a- ACC-01 , 200 TR no 2

TOTAL CARRIED TO COLLECTION -

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 1/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 232113 - Primary Secondary Cooling


Distribution
1 Chilled water (Variable / Constant speed driver) pump,
horizontal Split Case type with a capacity and head as
per equipment schedules . Each complete with but not
limited to the following:
- Electric motor
- Flexible mechanical coupling
- Mechanical seal
- High quality steel base plate
- Vibration isolators
- Bronze alloy impeller
- Stainless steel axis
- Cast iron volute casing
- Valves, flexible connections, fittings, flange
- Vent cocks and all accessories according to the
drawings and specifications
- (The price shall include the Pumps hookup)

a- (PCHWP - 01) (29 L/S , 17m head) constant speed


horizontal split case primary pump as per schedule on
drawings (one stand - by). no 3
b- (SCHWP - 01) (29 L/S ,20m head) variable speed
motor drive horizontal split case secondary pump as per
schedule on drawings (one stand - by). no 3

2 Air separator and a makeup water assembly c/w all


connections, Valves, isolation valves, relief valves, as
per specification, detais and all requirements.
a- AIR SEPERATOR no 1

SECTION 23 2500 - HVAC WATER TREATMENT


3 Chemical treatment system complete with chemical
(prine) tank and dosing pump, softener, check valves,
pressure gauges, gate valves, air vent, drain valves,
relief valve, water flow meter, … etc. as per
specifications and schedules on drawings.

a- Chemical Unit no 1

TOTAL CARRIED TO COLLECTION -

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 2/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 238219 - Fan Coil Air Conditioning


1 Chilled water concealed, fan coil units with capacity as
per schedules. The units shall be supplied complete
with 3-speeds motor, fan, cooling coil, , panel filter,
thermostat ,electric cable, control and hookup valves
and all accessories as per schedule in drawings: (The
price shall include theFCUs hookup)
a- FCU-02, T.L : 1.92 KW , S.L : 1.55 KW no 2
b- FCU-03, T.L : 2.84 KW , S.L : 2.17 KW no 1
c- FCU-04, T.L : 4.28 KW , S.L : 3.49 KW no 7
d- FCU-05, T.L : 5.32 KW , S.L : 4.54 KW no 42
e- FCU-07, T.L : 7.5 KW , S.L : 6.38 KW no 11
f- FCU-08, T.L : 9.13 KW , S.L : 7 KW no 43
g- FCU-09, T.L : 10.83 KW , S.L : 8.96 KW no 6
h- FCU-10, T.L : 12.15 KW , S.L : 10.11 KW no 17

2 Chiled water Ducted Hi-Wall fan coil units ( Two Pipes


). The units shall be supplied complete with 3-speeds
motor, fan, cooling coil, panel filter, thermostst ,electric
cable, control and hookup valves and all accessories as
per standard details drawings.
a- HWCH-01 T.L : 3.55 KW , S.L : 2.63 KW no 4

SECTION 238126 - SPLIT-SYSTEM AIR


CONDITIONERS
3 Split DX mini room unit (decorative High Wall type),
complete with but not limited to : compressor,
evaporator, condenser, evaporator fan, condenser fan,
refrigerant piping, refrigerant charge ,wall mounted
thermostat, copper piping, electric wiring to nearest
power source, remote control, all other necessary
accessories, components and devices to make a
complete job for the following: (kindly note that the unit
capacity shall be selected based on outdoor
temperature 43C )

a- HW-01 , Total load=3.55 KW no 6

TOTAL CARRIED TO COLLECTION -

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 3/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 233113 - Low Velocity Air Conditioning


1 Double Decker Fresh Air Handling units with heat recovery
wheel consists of but not limited to the following sections:
1- Fresh air Stream: Prefilter, bag filter, heat recovery wheel,
horseshoe heat pipe, Chilled water cooling coil, hot water
reheat coil and supply fan.
2- Exhaust air stream: Prefilter, heat recovery wheel, extract
fan..
The unit shall be complete with but not limited to : filters,
electric power supply from the unit up to the nearest power
source and all other necessary accessories, components and
devices to make a complete job, considering the following:
a. Casing: the unit casing shall be double skin 50mm
thickness TB3 type at least. thermal break to be provided at all-
around doors and observation windows to prevent
condensation
b. Control: The unit shall be factory furnished with all opening
required for instrumentation as shown in the control diagrams.
c. Fan: the fan shall be equiped with high efficiency electrical
motor and VSD drive for allowing the unit to meet the spaces
requirement during occupation and non-occupation modes.
Fans to be airfoil blades type and selected at high efficiency
point with less sound generation
e. Drift eliminator at the downstream of cooling coil to be
provided for carring over prevention in case the face velocity
on the coil is more than 2.5 m/s.
f. Power transmission: the motor to be furnished with two V-
belt at least and variable pitch pulley. the maximum speed
ratio is 1:1.5
Note: Additional one filter set to be considered after handing
over, Moreover, the cooling coil shall be between 4 to 6 rows

a- FAHU-01 / COOLING LOAD : 95.8 KW / SENSIBLE


LOAD : 51 KW / FAF: 6565 L/S / EAF: 5855 L/S /
ESP=275 Pa , HORSESHOE HEAT PIPE (PRECOOL
CAPACITY : 27.2 KW, REHEAT CAPACITY : 29.2 KW
) no 1

TOTAL CARRIED TO COLLECTION -

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 4/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 kitchen hood makeup Air Handling units consists of flat


filter, bag filter cooling coil supply fan.
The unit shall be complete with but not limited to :chilled
water piping, filters, electric power supply from the unit
up to the nearest power source and all other necessary
accessories, components and devices to make a
complete job, considering the following:
a. Casing: the unit casing shall be double skin 50mm
thickness TB3 type at least. thermal break to be
provided at all-around doors and observation windows
to prevent condensation
b. Control: The unit shall be factory furnished with all
opening required for instrumentation as shown in the
control diagrams.
c. Fan: the fan shall be equiped with high efficiency
electrical motor and VSD drive for allowing the unit to
meet the spaces requirement during occupation and
non-occupation modes. Fans to be airfoil blades type
and selected at high efficiency point with less sound
generation
e. Drift eliminator at the downstream of cooling coil to
be provided for carring over prevention in case the face
velocity on the coil is more than 2.5 m/s.
f. Power transmission: the motor to be furnished with
two V-belt at least and variable pitch pulley. the
maximum speed ratio is 1:1.5
Note: Additional one filter set to be considered after
handing over, Moreover, the cooling coil shall be
between 4 to 6 rows

a- MAHU-01, COOLING LOAD : 35.23 KW /


SENSIBLE LOAD : 16.3 KW / FAF: 1190 L/S /
ESP=500 Pa no 1

TOTAL CARRIED TO COLLECTION -

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 5/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 Air Handling units mixing box, Prefilter, bag filter, chilled water
cooling coil, and supply fan .
The unit shall be compatible with chilled water system and
complete with but not limited to : chilled water piping, filters,
electric power supply from the unit up to the nearest power
source and all other necessary accessories, components and
devices to make a complete job, considering the following:
a. Casing: the unit casing shall be double skin 50mm
thickness TB3 type at least. thermal break to be provided at all-
around doors and observation windows to prevent
condensation
b. Control: the unit shall be furnished with standalone
controller complete with its software. . The unit shall be factory
furnished with all opening required for instrumentation as
shown in the control diagrams.
c. Fan: Fans to be airfoil blades type and selected at high
efficiency point with less sound generation
d. The chilled water cooling coil shall be tested in terms of
cooling performance as per AHRI.
e. Drift eliminator at the downstream of cooling coil to be
provided for carring over prevention in case the face velocity
on the coil is more than 2.5 m/s.
f. Power transmission: the motor to be furnished with two V-
belt at least and variable pitch pulley. the maximum speed
ratio is 1:1.5
Note: Additional one filter set to be considered after handing
over, Moreover, the cooling coil shall be between 4 to 6 rows .

a- AHU-01, Lecture Hall Cooling Load= 40.3 kW/


Sensible Load: 38.6 KW/ Flow=1985 l/s, ESP=500Pa no 1
b- AHU-02, GYM Cooling Load= 37.4 kW/ Sensible
Load: 33.3 KW/ Flow=2400 l/s, ESP=500Pa no 1
c- AHU-03, Cafeteria Cooling Load= 82 kW/ Sensible
Load: 66.4 KW/ Flow=3380 l/s, ESP=500Pa no 1

TOTAL CARRIED TO COLLECTION -

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 6/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 233400 - GENERAL VENTILATION


1 As per the Equipment Schedule, Axial fan complete
with but not limited to, motor , steel frame, rubber pads,
flexible duct connection on outlet and inlet, hangers,
supports, inspection doors , rods, anchors nut , bolts ,
electrical wiring to nearest power source, and all other
necessary accessories, components and devices to
make a complete job, considering for the following:
a. Fan: the fan shall be airfoil blades type and the
selection to be at high efficiency point with less sound
generation
b. Motor: the electrical motor to be furnished with two V-
belts as minimum with variable pitch pulley
c. DDC Controller: UL Listed controller to be furnished
for the connection with the FAP.

a- EX.F-01 Flow Rate : 120 L/S / ESP=250 Pa no 1


b- EX.F-02 Flow Rate : 260 L/S / ESP=150 Pa no 1
c- EX.F-03 Flow Rate : 1000 L/S / 3100 L/S /
ESP=250 Pa (Double Speed) no 1
d- EX.F-04 Flow Rate : 1645 L/S / ESP=250 Pa no 1
e- EX.F-05 Flow Rate : 520 L/S / ESP=250 Pa no 1
f- EX.F-06 Flow Rate : 350 L/S / ESP=150 Pa no 1
g- FA.F-01 Flow Rate : 350 L/S / ESP=150 Pa no 1
h- W.M.EX.F-01 Flow Rate : 35 L/S / ESP=25 Pa no 2
i- W.M.EX.F-02 Flow Rate : 330 L/S / ESP=25 Pa no 3
j- W.M.EX.F-03 Flow Rate : 970 L/S / ESP=25 Pa no 2

TOTAL CARRIED TO COLLECTION -

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 7/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 As per the Equipment Schedule,Pressurization variable


speed axial fan complete with but not limited to: motor ,
steel frame, rubber pads, flexible duct connection on
outlet and inlet, hangers, supports, inspection doors ,
rods, anchors nut , bolts , pressure sensor, electrical
wiring to nearest power source, and all other necessary
accessories, components and devices to make a
complete job, considering for the following:
c. Fan: the fan shall be airfoil blades type and the
selection to be at high efficiency point with less sound
generation
d. Motor: the electrical motor to be furnished with two V-
belts as minimum with variable pitch pulley
e. DDC Controller: UL Listed controller to be furnished
for the connection with the FAP.

a- PR.F-01 Flow Rate : 4600 L/S / ESP=100 Pa no 1

SECTION 233813 - KITCHEN VENTILATION


2 Ecology units consists of prefilter, Electrostatic filter,
carbon filter, extract fan complete with but not limited
to: motor , steel frame, rubber pads, flexible duct
connection on outlet and inlet, hangers, supports,
inspection doors , rods, anchors nut , bolts , electrical
wiring to nearest power source, and all other necessary
accessories, components and devices to make a
complete job for the following:
Note: the Contractor to check the accommodated space
prior to submission to the Engineer.
In addition, ZERO odor to be warranted
a- ECU-01 Flow Rate : 1400 L/S / ESP=650 Pa no 1

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 8/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 232113 - Primary Secondary Cooling


Distribution
1 Carbon Steel ASTM A53 Grade B , schedule 40, PN16
Pressure rating Welded,Screwed or Grooved Ends,
piping as required for chilled water loop complete with
all necessary fittings such as elbows, tees, couplings,
reducers, bends, ... etc. including anti-rust painting and
all necessary hangers, supports, anchors, expansion
joints, including pipes flushing and cleaning after
installation according to drawing and specification for
the following sizes:
a- Pipes with diameter 20mm M 293
b- Pipes with diameter 25mm M 436
c- Pipes with diameter 32mm M 284
d- Pipes with diameter 40mm M 140
e- Pipes with diameter 50mm M 281
f- Pipes with diameter 65mm M 178
g- Pipes with diameter 80mm M 237
h- Pipes with diameter 100mm M 16
i- Pipes with diameter 150mm M 30
j- Pipes with diameter 200mm M 155

2 Colsed Cell elstometric rubber foam thermal insulation


for indoor and outdoor chilled water pipes
(Conductivity=0.032–0.040 W/m.K) , 65mm thikness for
chilled water pipes below 40mm and 32mm for pipes
more than 40mm as per ASHRAE 90.1,specifications
and complete with all accessories.
a- Pipes with diameter 20mm m 293
b- Pipes with diameter 25mm m 436
c- Pipes with diameter 32mm m 284
d- Pipes with diameter 40mm m 140
e- Pipes with diameter 50mm m 281
f- Pipes with diameter 65mm m 178
g- Pipes with diameter 80mm m 237
h- Pipes with diameter 100mm m 16
i- Pipes with diameter 150mm m 30
j- Pipes with diameter 200mm m 155

3 Aluminuim cladding for chilled water piping with 0.6mm


thikness for exposed supply and return chilled water
pipe network complete with all accessories required as
per specifications and drawings.
a- Pipes with diameter 200mm m 155

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 9/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 233113 - Low Velocity Air Conditioning


1 Air duct system as per SMACNA standars complete
with but not limited to: volume control dampers ,
splitters dampers , hangers, supports,
canvas,inspection doors , rods, anchors nut , bolts ,
duct sealer ,tags ,charts labels, plenum, motorized fire
dampers which shall be installed where necessary as
per SMACNA standards and the fire smoke evacuation
cenario and all other necessary accessories,
components and devices to make a complete job.

a- GALVANIZED (270 g/m2 both sides zinc) ton 15


b- BLACK STEEL (Fire Rated Duct, 300C@2hours) ton 0.6

2 Duct Insulation
a- Insulation for indoor air ducts ( 25 mm thickness ) ,
as per ASHRAE 90.1, comply to specifications and
complete with all accessories. m2 2500.0
b- Insulation for outdoor air ducts ( 50 mm thickness ) ,
as per ASHRAE 90.1, comply to specifications and
complete with all accessories. m2 280
c- Insulation for blacksteel ducts ( 50 mm thickness ) ,
as per ASHRAE 90.1, comply to specifications and
complete with all accessories. m2 100

3 Supply air grille (SLBG) linear bar each complete with


all accessories according to the drawings and
specifications for the following size:
a- SLBG,4.5M,100mm WIDTH no 22
b- SLBG,4M,100mm WIDTH no 40
c- SLBG,6.5 m,100 mm WIDTH no 2

4 Return bar grille (RLBG) air linear type each complete


with all accessories according to specifications for the
following size:
a- RLBG,3.5m,100mm WIDTH no 23
b- RLBG,4.5m,100mm WIDTH no 42

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 10/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 Supply linear slot diffuser (SLSD) complete with


pleanum boxes, flexiable connections and volume
dampers as per specification for the following size:
a- SLSD,3m,3 SLOTS no 42
b- SLSD,5m,3 SLOTS no 5
c- SLSD,6m,3 SLOTS no 1
d- SLSD,6m,4 SLOTS no 1
e- SLSD,7.5m,3 SLOTS no 2
f- SLSD,8 m,3 SLOTS no 2
g- SLSD,12 m,3 SLOTS no 1
h- SLSD,13m,3 SLOTS no 1

2 Supply linear slot diffuser (RLSD) complete with


pleanum boxes, flexiable connections and volume
dampers as per specification for the following size:
a- RLSD,2m,3 SLOTS no 1
b- RLSD,3m,3 SLOTS no 46
c- RLSD,3.5m,3 SLOTS no 1
d- RLSD,3.5m,4 SLOTS no 1
e- RLSD,4m,3 SLOTS no 2
f- RLSD,4.5m,3 SLOTS no 1
g- RLSD,4.5m,4 SLOTS no 2
h- RLSD,5m,3 SLOTS no 1
i- RLSD,7.5m,3 SLOTS no 2
j- RLSD,8m,3 SLOTS no 2
k- RLSD,12m,3 SLOTS no 1
l- RLSD,13m,3 SLOTS no 1

3 Supply air ceiling diffusers (SCD) square types each


complete with volume dampers, straightners and all
accessories according to the drawings and
specifications for the following size:
a- SCD 300X300 FACE 200X200 NECK no 2
b- SCD 600X300 FACE 375X375 NECK no 6

4 Return air ceiling diffuser (RCD) square type each


complete with accessories according to the drawings
and specifications for the following sizes:
a- RCD 600X600 no 13

5 Exhaust air ceiling diffuser (ECD) square type each


complete with accessories according to the drawings
and specifications for the following sizes:
a- ECD 150X150 no 72

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 11/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

1 Supply air grille (SAG) rectangular types each complete


with all accessories according to the drawings and
specifications for the following size:
a- SAG 250X200 no 1
b- SAG 350X200 no 7
c- SAG 600X400 no 1

2 Return air grille (RAG) rectangular type each complete


with all accessories and according to specifications and
drawings for the following:
a- RAG 250X200 no 1
b- RAG 300X200 no 4
c- RAG 350X200 no 7

3 Exhaust air grille (RAG) rectangular type each complete


with all accessories and according to specifications and
drawings for the following:
a- EAG 150X100 no 24
b- EAG 600X400 no 1
c- EAG 1200X300 no 3

4 Motorized fire and smoke air dampers (Fire rated 300C


2hours) as shown in the design drawings and in
accordance with the Project Specification. The actuator
shall be suitable in size with respect to the operating air
pressure and capable of withstanding the closing
pressure without rattling. The actuator shall be ON/OFF
action type as specified and it shall be fully integrated
with the air damper section and supplied from one
Source of Approval. The entire item to be labeled by
AMCA and in opposite blade’s arrangement. The
motorized air damper shall be supplied and installed
complete with all necessaries accessories such as
power supply, control module and its control wires,
hanging and supports, etc.

a- MFSD 150X150 no 4
b- MFSD 600X200 no 2

5 Air curtain, shall be piece of art complete with vanes,


motor, all electrical work components and wiring to
MCC, base…etc. And all accessories as per
specifications and drawings:
a- ACU-01 , 1000MM no 3
b- ACU-02 , 1500MM no 8

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 12/14 VERTICAL TRANSPORTATION
Arab open University New Extension
Al Shorouq City, Egypt

DIVISION NO. 23 - HVAC WORKS

Rate Amount
Item Description Unit Qty.
(EGP) (EGP)

SECTION 230900 - Central Control Building


Management System
1 Supply, install, connect control devices to the building
management system (BMS) for all HVAC equipments
and MEP other services utilities. The BMS system shall
be connected to the existing BMS system in the main
campus and connect and control the various project
systems and items - but not limited - as follows;
1. All HVAC components as described in drawings
such as chillers, pumps, AHU's, FCU's, Fans, tanks,
split units, etc.
2. Elevators and Escalators.
3. Electrical items as; transformers, generators, fire
alarm system and main panel boards (as a monitoring
only).outdoor lighting … etc.
4. Plumbing systems as; Fire pumps, booster pumps,
submersible pumps … etc.
The item shall include all connections, control modules,
panels, output devices ... etc and all accessories
according to specifications and as shown on control
diagram drawings.
l.sum 1

TOTAL CARRIED TO COLLECTION

Arab open University New Extension


AOU-TDR-BOQ-MEP-01-REV00
February,2023 13/14 VERTICAL TRANSPORTATION