Professional Documents
Culture Documents
1.Technical Introduction
The Pipe Conveyed Logging (PCL) is used to provide assurance that the
logging tools will be able to successfully survey the intended interval of
the wellbore.
The hole deviation exceeds the limits of the instrument’s free-fall.
1.Technical Introduction
Difficult hole conditions warrant PCL use such as: washouts, ledges,
restrictions, excessive dogleg deviation, high hydrostatic pressure.
The customer simply elects to reduce this uncertainty.
PIPE CONVEYED LOGGING
1.Technical Introduction
Modular Kit
Side-Entry Sub
Auxiliary Tools
PIPE CONVEYED LOGGING
Side-Entry Sub
PIPE CONVEYED LOGGING
Tension Sub
knuckle joint
Holeder
PIPE CONVEYED LOGGING
Installed Remote
tension meter in the
driller shack. Real
time display the
speed, depth, cable
tension ,Tools string
tension.
PIPE CONVEYED LOGGING
Cable clamp
PIPE CONVEYED LOGGING
3.Opreation Procedure
Connect PCL Subs onto Bottom of Drillpipe (DP)
3.Opreation Procedure
Winch Down the Female Wet Connector
3.Opreation Procedure
Switch on the Tools
3.Opreation Procedure
Begin Logging
3.Opreation Procedure
B. Go in hole
• NO ROTATION OF PIPE ALLOWED.
• Run in speed 2 minutes per stand the first 500 m, then increase
to 1 min/stand. When open hole is reached, run in at 2 min/stand
• For every ___ stands, circulate the volume of the last ___
stands run in hole. (Frequency depends on mud content )
• Set and pull slips carefully, to avoid a yo-yo effect on tools.
• Use a minimum of dope with a brush on the pin
connection.(Better do not use any dope)
PIPE CONVEYED LOGGING
3.Opreation Procedure
C. At latching depth
• Circulate at a low rate while conducting a safety meeting.
• If sheaves not installed, rig crew install sheaves.
• Install large OD stabilizer.
• Lift up SES and sinker bar, RIH 100m (328ft) with sinker bar.
• Install SES and tighten to specified torque.
• Install metal wear bushings.
• Connect pup joint to SES.
• Prepare to RIH with the sinker bar with no pumping.
D. Running in cable
• WL team to run in logging cable.
• Stop when cable tension drop.
• Line up cable with groove in the kelly bushing and lower the SES below
rotary table.
• Start pumping at a rate indicated by the PCL specialist.
• STOP pumps when sinker bar assy. is approx. 120 m (400 ft) above latch
depth.
• Take pick-up weight.
PIPE CONVEYED LOGGING
3.Opreation Procedure
E.Latching
• Start pumps at rate indicated by PCL specialist.Increase pump rate to
achieve logging speed of 90m/min.
• Check for good latch. Indications are:
• Electrical.
• Drop in cable weight
• Pressure increase in stand pipe
• Mechanical test on wet connect
• Pull back SES above rotary table.
• Spool out 5–10 meters (16.4–32 ft) slack in hole.
F. Installing the SES line clamp
• Break off stand above SES and drain for mud.
• Remove metal wear bushing, install pack off rubber assembly and tighten.
• Install cable clamp.
• Test-pull to 60% the breaking strength of the shear screw.
• Hold tension for 5 min.
• RESET HOIST PANEL DEPTH TO BOTTOM OF TOOL.
PIPE CONVEYED LOGGING
3.Opreation Procedure
G. Logging down and up
• Logging speeds determined by logging
engineer.
• Establish 100% good communication between
driller and winch man.
• Take it easy in the beginning.
• Do not move or stop the pipe before informing
the winch man.
• Winch operator to maintain back-tension as per
simulation for down and up logging unless
otherwise specified.
• Fill pipe, if not filling by itself.
• No rotation of pipe, lock rotary table.
• Roughnecks to watch cable when slips is pulled
and set.
• STOP if tension/compression on tools reaches
pre-determined values.
• NEVER TAG BOTTOM WITH LOGGING
TOOLS.
PIPE CONVEYED LOGGING
3.Opreation Procedure
H. Back at surface with SES
• Keep cable weight in back tension.
• Take off cable plate and cable clamp.
• Lower SES below rotary.
• Clear floor and pull cable free.
• At approx. 100 meters below rotary, pull back SES and break off.
• Rig down SES, wet connect and sheave wheels
• Continue out of hole at 1 min/stand.
• Set slips carefully, no yo-yo effect.
I. At surface
• Do test last to verify tool response.
• Rig down logging tool.s
PIPE CONVEYED LOGGING
3.Opreation Procedure
J. Emergency procedures
• Can always circulate during logging, as long as you are within the
limits.
• Limitations are:
• Continuous flow 1003 l/min. (265 gal/min)
• Max. flow for short time 1514 l/min. (400 gal/min)
• Max. pressure during logging 1000 psi.
• Explain emergency pull-out.
• Break the shear screws on the SES cable clamp
• Pull the sinker bar latch rings free
• Torpedo weak point will break at SES
• Pull cable out of drill pipe
• Ball will seal SES
• Pull cable to surface.