ACTS OF GOD/ FORCE MAJEURE BONDSMEN

- Instances already beyond the control of the - From BOND - Surety (other term) – the person
AoR, AIoC which cannot be used to terminate or firm or corporation who provides the
a construction project guarantee or assurance that the contractor
- Reason of termination of project: e.g. hindi will pay any defect in his work (types of
nasunod sched but if caused by any act of god bonds: performance, proposal, payment,
cannot be used as a cause of termination guarantee)
- Examples of force majeure: earthquake, - Hawak ng owner or client yong bond; owner
tsunamis, typhoon can go to a surety company to monetize the
bond
ARBITRATION
- BONDSMEN – the people involved in the
- Mediation btwn diff parties, where a third contract; sino kukugha ng bond? Contractor.
party will come over (from CIAP – From where? Kukunin sa surety corporation.
Construction Industry Authority of the PH; not Who will benefit? The owner or client. Hence,
full-fledged lawyers) the bondmen are the contractor, surety
- There will be a middle person to hear sides of company and the client.
parties in conflict
BID PACKAGE
- Check contract, clear outline of specifications
- Comprises of diff documents that will be used
ADEQUACY OF DESIGN
by prospective contractors who wish to
- Sound design, design is prepared according to participate in the bidding of a particular
bldg. laws and standards project.
- This includes contract documents,
AS-BUILT DRAWINGS specifications, bid forms
- Drawings prepared to show the building as it - Bid package is bought
was constructed CATALOG DATA
ALTERNATIVE DISPUTE RESOLUTION - Literature instruction, set of written out
- When you use arbitration, you are using an procedure on how to e.g. maintain an air
alternative form of resolving disputes. conditioning unit
- Alternative bc you should not file cases - Usually a manufacturer’s data or instructions
immediately. You find process not involving CESSATION
courts or lawyers
- Under the jurisdiction of CIAP - To stop

BENCHMARK CONTRACTOR’S BOND

- A reference point - Bid bond (to submit when you win in the
- *low-flow plumbing fixture – the rate of flow bidding process for security), performance
of water (gallons per minute, liters per bond, guarantee bond (once the bldg. is
minute) is controlled; sustainable means; u completed, valid for a year, then kapag
don’t need high pressure to wash hands to walang defects within a year, pwede bawiin
generate savings; baseline or benchmark? 120 yong bond)
as the initial bill per month then reduced to
CULVERT
90 per month; 120 is the benchmark
- Reinforced concrete pipes installed
BID TAB
underground as part of the drainage system,
- Tabulation of the bids usually for storm drain
- Open folder where all the bid documents can
CRITICAL PATH METHOD
be found
- Construction scheduling tool
- Critical path - Path where you cannot afford to - Registrations of own original works (in any
make mistakes bc it will delay the project form) under intellectual property code of the
PH
CONTRACT SUM BREAKDOWN
PUNCH LIST
- Detailed costs
- List of items that needs to be rectified
CONTRACT TIME RECKONING
RCD
- To identify start of construction
- How you estimate things - Residual Current Device, circuit breaker
- Ideal starting period: 7 days after signing of
ROYALTIES
contract
- Paid when borrowing patents
CONSTRUCTION SUPERVISION GROUP
- NFTs
- A group of architects and non-architects
SUB-SURFACE CONDITIONS
which is organized and can actually form a
company whether an architectural company - Inner/lower layer of the ground; good sub-
or otherwise whose intention is to supervise surface condition if mahirap na maghukay
construction project
- Composed of full-time supervisors and their STOCKPILING
assistants, clerks, accountants, bookkeepers - Storing of materials; observe minimum height
- Hired especially for complex projects of piles
- Sometimes would also need apprentices bc
part of the responsibility of the CSG is to SHOP DRAWINGS
prepare as-built drawings (draftsman), to - Detailed blow-up drawings usually prepared
check on accomplishments (apprentices), by a contractor on the contractor’s side,
bodegero is sometimes included in CSG prepared by the FTS and his/her assistants
DERRICKS - Interpretation of the working drawings not
understood by carpenters or men
- Lifting machine, or hoisting machine
TRANSMITTAL
EQUIPMENT APPROVAL DATA
- Letter transmitted for any change order, for
- Identify equipment needed, which contract it any reports to one person to the other
will be used, how long it will be used, who will
pay, justification WORKING PRESSURE

FALSEWORK TOWER - In plumbing works, water supply – fixtures –


work at a certain pressure. Make sure that is
- Temporary facilities (TEMFACILS) good working system (equal pressure)
- Installed for security purposes; e.g.
constructed for lighting, for signals WHS

FM ASSIST - Workers’ health and safety, provide personal


protective equipment
- Facility management assist

LIQUIDATED DAMAGES

- Amount paid when the construction is not


done within the contract time
- Contractor to To pay 10% of 1% of contract
price per day of delay

PATENTS