Professional Documents
Culture Documents
TRUE NORTH
NORTH 0°
22.96118°
DOMINANT WIND
90° A 270°
SECONDARY
WIND
90°
DOMINANT WIND
3 3' 4
180°
3650
PLANT 3000
NORTH 1900 1750
0° 180° 1000 2000
22.96118° 513 862 525 513
A
TRUE SECONDARY 960 940 -
NORTH 67° WIND
MAKKAH 270° GL+3.050
B.O.CEILING
9
4
1100
1500 1500
THIS BUILDING
3 3 6
6 KEY PLAN
SLOPE
1 5 1
1500
SLOPE
1750
8 NOTES :
450
2 2
3050
GL+0.150
1. ALL DIMENSIONS ARE IN MILLIMETER
GL+0.150 FFL
10 UNLESS NOTED OTHERWISE (U.N.O)
FFL ALL LEVELS ARE IN METERS.
3000
6
1900
SLOPE 2 2. FOR DETAILS OF INTERIOR AND EXTERIOR FINISHES
FL.1 FL.1
700
REFER DRAWING MS-DD-E4810-ACT-DWG-0003.
1500
3' 3. GL±0.000=EL .+4.450
GL+0.150 GL+0.150 4 1
900
4 4. FOR ARCHITECTURAL REQUIREMENT REFER
1250
FFL FFL
FFL=GL+0.200 MS-DD-3000-ACT-SPE-0001, 0002.
1000
800
7 FOR HVAC REQUIREMENT REFER MS-DD-3000-MEC-SPE-0501.
FFL=GL+0.150
7 SLOPE 6 11 B
50
- GL. ± 0.000 5. PLUMBING FIXTURES AND FITTING WILL BE DETAILED IN SHOP
DRAWING PHASE BY SUBCONTRACTOR
3
6. FOR DESIGN LOADS REFER MS-DD-3000-CIV-SPE-0001,
FL.2 FL.2 MS-DD-3000-ACT-SPE-0001.
4 WASH BASIN
A
5 URINAL
3650 1
1900 1750 6 FLOOR DRAIN
7 LAVATORY MIRROR
8 HOOK
MOISTURE RESISTANT MOISTURE RESISTANT
GL+3.050 CEILING CEILING MOISTURE RESISTANT
9 ACOUSTIC CEILING 600x600
B.O.CEILING
9 9
FINISH PLASTERING FINISH PLASTERING
CLEAN OUT STAINLESS STEEL
10
W/ ACRYLIC EX EX W/ ACRYLIC FOR BLACK WATER
EMULSION PAINT EMULSION PAINT CLEAN OUT STAINLESS STEEL
1100
11
FOR GRAY WATER
AW ALUMINUM WINDOW
AW AW
EX EXHAUST FAN
7 7
3050
5 Jan,25,2023 Feb,13,2023 1
AAC BLOCK WALL THK. 100mm
4 4
CERAMIC TILE + MORTAR LINING + WATERPROOFING
30
1500
FFL=GL+0.200
PT CII REVIEW RESULT PTFI REVIEW RESULT TO PT CII
FFL=GL+0.150 Approved without Comments
A A Approved without Comments
T. Okamoto
GL. ± 0.000
Approved with Comments
11 B
Y.S.Lin
B Approved with Comments
SCALE 1 : 25 -
4810-BLD-0101
DAILY MAINTENANCE WORKSHOP FOR
YTO JER JAS JAN.25.2023
MS-DD-E4810-ACT-DWG-0003 4810-BLD-0101 DAILY MAINTENANCE WORKSHOP FOR MH_INTERIOR & EXTERIOR FINISHING SCHEDULE MH_TOILET DETAILS
MS-DD-E4810-ACT-DWG-0002 4810-BLD-0101 DAILY MAINTENANCE WORKSHOP FOR MH_ELEVATIONS AND SECTIONS
1 YTO JER JAS JAN.25.2023 ISSUED FOR CONSTRUCTION MS-DD-E4810-ACT-DWG-0001 4810-BLD-0101 DAILY MAINTENANCE WORKSHOP FOR MH_GROUND AND ROOF PLAN 1:100
0 AGA JER JAS NOV.18.2022 ISSUED FOR APPROVAL MS-DD-3000-ACT-STA-0021 STANDARD DRAWINGS FOR BUILDING ARCHITECTURE - TOILET TYPICAL DETAILS
MS-DD-E4810-ACT-DWG-0006 1