Professional Documents
Culture Documents
1 General Data
Type of bearing: TA
Size of bearing: 6
Designation: TA6 - T5, T8
Location: T5, T8
Number of bearing: 2
Country code (ISO-Code):
Standard: AASHTO LRFD
2 Input Data
S355 S235
Fy [N/mm2] Fy [N/mm2]
345 250
V:\mPROJECTS\CO\CO30\Sales\06 Sales SE-Asia-commercial\05 Vietnam\MSG100492 Giong Ong To bridge - Vinh Hung\02 Drawings and technical documents\TA6-VNM-MSG100492-
Page3/10 ©Copyright 2010 - mageba 1_T5,T8_2pcs.xlsx
RESTON®POT Bearings Prepared MFWU Revision: 00
Checked: 0 Date: 20/2/2023
Static calculation acc. to AASHTO Approved: JXIO
Project name: Giong Ong To bridge Order- No.: MSG100492-1
Location of bearing: T5, T8 Drawing-No.: TA6-VNM-MSG100492-1
to
t5
t4
h3
t6
h2
hE t3
h
t1
hT
t2
h1
tu
Ø d1
j Ø dT j j - excess length
bu x lu of anchorplate
Note:
Beside the guide bars, the TE bearings are identical to the TA-bearing. The designation TE stands for longitudinal (x-
axis), the designation TEQ stands for transversal (y-axis) movements. The formulas are given for the TE-bearings. They
are analogous appl
t8 0.5
b8xl8
t6
t5
h7
h4
a7
t4
12 b7xl7 12
t3
b7xl7 b5xl5
t6
t5
a7 a7
h7
t8
h4
t4
3
b8xl8
0.5
t3
V:\mPROJECTS\CO\CO30\Sales\06 Sales SE-Asia-commercial\05 Vietnam\MSG100492 Giong Ong To bridge - Vinh Hung\02 Drawings and technical documents\TA6-VNM-MSG100492-
Page 4/10 ©Copyright 2010 - mageba 1_T5,T8_2pcs.xlsx
RESTON®POT Bearings Prepared MFWU Revision: 00
Checked: 0 Date: 20/2/2023
Static calculation acc. to AASHTO Approved: JXIO
Project name: Giong Ong To bridge Order- No.: MSG100492-1
Location of bearing: T5, T8 Drawing-No.: TA6-VNM-MSG100492-1
bo x lo
j 豥6 j
to
h3
[fig.4]
t3 t6
h2
hE
h
t2
hT
h1
t1
tu
豥1
j 豥T j
bu x lu
j - 躡 erstand Ankerplatte
j - excess length
of anchor plate
5 Identification of the parts
V:\mPROJECTS\CO\CO30\Sales\06 Sales SE-Asia-commercial\05 Vietnam\MSG100492 Giong Ong To bridge - Vinh Hung\02 Drawings and technical documents\TA6-VNM-MSG100492-
Page 5/10 ©Copyright 2010 - mageba 1_T5,T8_2pcs.xlsx
RESTON®POT Bearings Prepared: MFWU Revision: 00
Checked: 0 Date: 20/2/2023
Static calculation acc. to AASHTO Approved: JXIO
Project name: Giong Ong To bridge Order-No.: MSG100492-1
Location of bearing: T5, T8 Drawing-No.: TA6-VNM-MSG100492-1
= 4*4000*1000/(484²*π) <= 25
= 4*4000*1000/(464²*π) <= 62
b) Excentric:
A = π*d42 / 4
= π*464²/4 = 169093
W = π*d43 / 32
π*464³/32 = 9807399
M = MH2+Me
= 6750000+67584133.76 = 74334134
Me = 0.4667*V2max*d1*(0.01+0.3*θmax+4.2*θmin)
= 0.4667*4000*1000*484*(0.01+0.3*0.02+4.2*0.014) = 67584134
MH2 = H2max * (t4+t3-h1*0.5)
= 180*1000*(8+37-15*0.5) = 6750000
c) Centric:
= 4*2400*1000/(464²*π) <= 42
V:\mPROJECTS\CO\CO30\Sales\06 Sales SE-Asia-commercial\05 Vietnam\MSG100492 Giong Ong To bridge - Vinh Hung\02 Drawings and technical documents\TA6-VNM-MSG100492-
Page 7/10 ©Copyright 2010 - mageba 1_T5,T8_2pcs.xlsx
RESTON®POT Bearings Prepared: MFWU Revision: 00
Checked: 0 Date: 20/2/2023
Static calculation acc. to AASHTO Approved: JXIO
Project name: Giong Ong To bridge Order-No.: MSG100492-1
Location of bearing: T5, T8 Drawing-No.: TA6-VNM-MSG100492-1
d) Excentric:
A = π*d42 / 4
= π*464²/4 = 169093
W = π*d43 / 32
π*464³/32 = 9807399
M = MH3+Me
= 3600000+40550480.256 = 44150480
Me = 0.4667*V3perm*d1*(0.01+0.3*θmax+4.2*θmin)
= 0.4667*2400*1000*484*(0.01+0.3*0.02+4.2*0.014) = 40550480
MH3 = H3max * (t4+t3-h1*0.5)
= 96*1000*(8+37-15*0.5) = 3600000
t3 required ≥ 0.06 * d1
= 0.06*484 = 29.0
= (1.5*180)/(484*345) = 1.6
= 0.03*484 = 14.5
h1 = 15.0 [mm] ≥ 14.5 [mm] fulfilled
V:\mPROJECTS\CO\CO30\Sales\06 Sales SE-Asia-commercial\05 Vietnam\MSG100492 Giong Ong To bridge - Vinh Hung\02 Drawings and technical documents\TA6-VNM-MSG100492-
Page 8/10 ©Copyright 2010 - mageba 1_T5,T8_2pcs.xlsx
RESTON®POT Bearings Prepared: MFWU Revision: 00
Checked: 0 Date: 20/2/2023
Static calculation acc. to AASHTO Approved: JXIO
Project name: Giong Ong To bridge Order-No.: MSG100492-1
Location of bearing: T5, T8 Drawing-No.: TA6-VNM-MSG100492-1
7.6 Pot
a) Pot base:
= 0.06*484
29.0
or take bigger => 29.0
20
b) Pot wall:
20
= or take bigger => 24.4
(484*21.7)/(1.25*345)
24.4
br = (dT-D1)/2
(620-484)/2
68.0 [mm] ≥ 24.4 [mm] fulfilled
LC A: Pr = Φ*0.85*fc'*A1*m
= 0.7*0.85*40*214008.43315519*1.5/1000
V:\mPROJECTS\CO\CO30\Sales\06 Sales SE-Asia-commercial\05 Vietnam\MSG100492 Giong Ong To bridge - Vinh Hung\02 Drawings and technical documents\TA6-VNM-MSG100492-
Page 9/10 ©Copyright 2010 - mageba 1_T5,T8_2pcs.xlsx
RESTON®POT Bearings Prepared: MFWU Revision: 00
Checked: 0 Date: 20/2/2023
Static calculation acc. to AASHTO Approved: JXIO
Project name: Giong Ong To bridge Order-No.: MSG100492-1
Location of bearing: T5, T8 Drawing-No.: TA6-VNM-MSG100492-1
b) Substructure:
LC A: Pr = Φ*0.85*fc'*A1*m
= 0.7*0.85*40*232427.590883187*1.5/1000
7.8 Pot cavity depth and vertical clearance between top of piston and top of pot
Vertical clearance between top of piston and top of pot acc. to 14.7.4.3-2
hp2=24mm,
R0θu+2σu+3=0.02*620/2+2*max(3,33/10)+3 = 15.8 mm
So, hp2> R0θu+2σu+3 fulfilled
V:\mPROJECTS\CO\CO30\Sales\06 Sales SE-Asia-commercial\05 Vietnam\MSG100492 Giong Ong To bridge - Vinh Hung\02 Drawings and technical documents\TA6-VNM-MSG100492-
Page 10/10 ©Copyright 2010 - mageba 1_T5,T8_2pcs.xlsx