1. Job reference: Critical weld joints related to compressed air SS pipelines (of size 1/2
inch,1 inch, 1 1/2 inch & 2 inch) at VM-8 facility and interconnecting VM-4 to VM-8 facilities
(2 inch GI make), SPROB. (I\St4f)
Observations:
DP witnessed by
A. Nagoor Reddy