You are on page 1of 40

A B C D E F G H

KEY PLAN

NOTE: 4. ANTI TERMITE TREATMENT 7. STIRRUP & CROSS-TIE SHAPES


1 4.1 FOR SITES PRONE TO TERMITE FOUNDATION TRENCHES AND PITS SHALL BE TREATED PRIOR TO d
1
IN CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES/DETAILS AND ANY NOTES/DETAILS ON INDIVIDUAL PLACING OF ANY MATERIALS AND SECOND ROUND OF TREATMENT SHALL BE CARRIED OUT PRIOR TO 135°
DRAWINGS, THE NOTES/DETAILS ON EACH DRAWING TAKE PRECEDENCE CONSTRUCTION OF THE GROUND FLOOR SLAB. CONTRACTOR SHALL SUPPLY NECESSARY INFORMATION d>=6Ø (10Ø)
FROM THE MANUFACTURES FOR ENGINEER'S APPROVAL. d d>=80mm (100mm)

90° 135°
VALUES GIVEN IN ( ) ARE FOR

b
1. GENERAL 5. CONCRETE CROSS TIE
MILD STEEL REINFORCEMENT FOR CONSTRUCTION PURPOSE ONLY

NOVEMBER 2022

LAWE BERHANU
1.1 ALL DIMENSIONS ARE IN mm. 5.1 UNLESS OTHERWISE SPECIFIED, ALL STRUCTURAL CONCRETE MIX TO BE OF GRADE C-25 135°

DATE OF ISSUE
DIMENSIONS ARE NOT TO BE SCALED FROM THE DRAWINGS. FOLLOW WRITTEN DIMENSIONS ONLY. 5.2 ALL CONCRETE STRENGTHS ARE 28 DAYS CUBE STRENGTH. 35° STIRRUPS & CROSS-TIES FOR COLUMNS, BEAM-COLUMN JOINTS,

CHECKED BY
STIRRUPS OR HOOP BEAM CONFINEMENT ZONES AND WALL END ZONES
1.2 ALL STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL 5.3 UNLESS OTHERWISE SPECIFIED, A LAYER OF 50mm THICK GRADE C-5 CONCRETE TO BE PROVIDED BELOW ALL
DRAWINGS, SPECIFICATIONS, BILLS OF QUANTITIES AND ALL OTHER RELEVANT DOCUMENTS.

THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
REINFORCED CONCRETE STRUCTURES IN CONTACT WITH THE GROUND.
DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ENGINEER PRIOR TO COMMENCEMENT OF
WORK. 5.4 UNLESS OTHERWISE SPECIFIED, ALL LEAN CONCRETE MIX TO BE OF GRADE C-5.

FINAL DESIGN
1.3 THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCEMENT OF 5.5 MAXIMUM AGGREGATE SIZE SHALL BE 20mm.

DESIGN STAGE
CHECKED BY
WORKS AND ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

2
5.6 CURING OF CONCRETE 8. NOTATIONS 2

INDEX
1.4 ALL CONCRETE SIZES AND LEVELS ARE FOR STRUCTURAL ELEMENTS UNLESS OTHERWISE NOTED. · EXPOSED CONCRETE SURFACES SHOULD BE COVERED WITH DAMP ABSORBENT MATERIAL AFTER

A
PLACING CONCRETE. THEY SHOULD BE KEPT CONTINUOUSLY WET BY FREQUENT SPRAYING OF WATER. · EGL - EXISTING GROUND LEVEL
1.5 ALL OPENINGS FOR PIPING AND CONVEYANCE SHALL BE FORMED IN POSITION BEFORE THE CASTING OF · IN COLUMNS CURING SHOULD BE STARTED IMMEDIATELY AFTER REMOVAL OF FORMWORK.
CONCRETE. FOR LOCATION OF OPENINGS REQUIRED FOR M & E INSTALLATION REFER RELEVANT M & E · MINIMUM PERIOD OF CURING IS 7 DAYS.
· GFL - GROUND FLOOR LEVEL
DRAWINGS. · FFL - FINISHED FLOOR LEVEL
· B/W- BOTH WAYS

LAWE BERHANU PPAR-366, AEA, ACI


REVISION BY
1.6 NO HOLES OR CHASES ARE PERMITTED IN THE CONCRETE MEMBERS UNLESS OTHER THAN AS DETAILED OR 5.7 REMOVAL OF SHUTTERING :
UNLESS APPROVED BY THE ENGINEER. · B - BOTTOM (B1 BOTTOM LAYER 1)
(B2 BOTTOM LAYER 2)
1.7 CONSTRUCTION JOINTS SHALL BE LOCATED BY THE APPROVAL OF THE ENGINEERS.
STRUCTURAL ELEMENTS MINIMUM PERIOD · T - TOP (T1 TOP LAYER 1)

ARCHITECTURAL DESIGN

DRAFTS PERSON TEAM:


1.8 ANY DAMAGE CAUSED TO ANY CIVIL/ STRUCTURAL WORK SHALL BE REINSTATED TO ITS ORIGINAL (T2 TOP LAYER 2)
CONDITION WITH NO COST IMPLICATION TO THE CLIENT. VERTICAL FORMWORK TO COLUMNS AND WALLS 24 HOURS
· C/C- CENTER TO CENTER

DAWIT MELAKU

SERKALEM N.
1.9 ELECTRICAL CONDUITS SHOULD NOT BE PROVIDED WITH IN THE COVER TO THE REINFORCEMENT OF SOFFIT FORMWORK TO SLABS 14 DAYS · T20-25-100T HIGH YIELD STEEL 20mm DIAMETER BAR MARK 25 AT 100mm

DATE
STRUCTURAL ELEMENTS. CENTERS ON TOP
SOFFIT FORMWORK TO BEAMS 14 DAYS
· B1 (200X400)

NO
PROPS TO BEAMS 21 DAYS
DEPTH OF BEAM
WIDTH OF BEAM
5.8 GRADE OF CONCRETE
2. FOUNDATIONS BEAM ID
3

ADDIS ABEBA

AA000050904212
3 CHARACTERISTIC

TITLE DEED NO
2.1 BOTTOM OF EXCAVATIONS FOR WALLS & COLUMN FOUNDATIONS SHALL BE COMPACTED PRIOR TO
CONCRETE CUBE/ CYLINDER
STRENGTH, N/mm²

LOCATION

K/KETEMA

WOREDA
LAYING OF LEVELING SCREED.

YEKA
BLINDING SCREED / LEVELING CONCRETE
C7, (C5) 5

09
2.2 FOUNDATIONS ARE DESIGNED FOR AN ALLOWABLE BEARING CAPACITY OF 200 kN/m²
BLINDING SCREED / LEVELING CONCRETE
C15, (C12) 20
2.3 FOUNDATIONS TO BE EXCAVATED TO THE DEPTHS AS MENTIONED IN THE DRAWING.
STRUCTURAL CONCRETE C25, (C20) 25
2.4 FOUNDATION EXCAVATION TO BE APPROVED BY THE ENGINEERS PRIOR TO THE CONSTRUCTION OF
FOUNDATIONS.

2.5 CONTRACTOR SHALL CARRYOUT BACK FILLING OF EXCAVATIONS FOR FOUNDATIONS,


FILLING FOR GROUND SLAB AND SELECT MATERIAL FILLING AS PER THE RECOMMENDATIONS.

CONSULTING ARCHITECTS & ENGINEERS


2.6 ALL STRUCTURAL ELEMENTS IN THE GROUND SHALL HAVE A PLASTIC PROTECTIVE LAYER
6. STANDARD TRIMMING DETAILS FOR
STRUCTURAL OPENINGS

MINISTRY OF EDUCATION
AGAINST CONCRETE GETTING IN CONTACT WITH SOIL.

EMAIL: Lawe.partners@gmail.com
2.7 UNDER THE FOUNDATION SHALL BE COMPACT 20CM THICKNESS WELL GRADED SELECT MATERIAL

Gurdshola, derar Mall, 2nd Floor


TEL: 0911419968
EVERY LEVEL TO ARCHIVE THE MAXIMUM DRY DENSITY OF 95%. 6.1 DIAMETER OF TRIMMER BARS SHALL BE SIMILAR TO BIGGER REINFORCING BARS OF THE STRUCTURE

LAWE BERHANU
THROUGH WHICH THE OPENING IS FORMED.
2.8 UNDER THE FOUNDATION SHALL BE COVERED BY POLYTHENE PLASTIC SHEET. THE QUALITY OF 4
6.2 NO TRIMMER BARS ARE REQUIRED FOR OPENINGS NOT GREATER THAN 200mm WIDE , BUT NO REINFORCING

CONSULTANT
MATERIAL SHALL BE APPROVED BY ENGINEER.
4 BARS SHALL BE CUT. REINFORCING BARS SHALL BE ADJUSTED IN POSITION TO AVOID OPENINGS.

EMPLOYER
6.3 UNLESS OTHERWISE SHOWN IN THE DRAWINGS, TRIMMER BAR DETAILS FOR THE DIFFERENT SIZE
OPENINGS ARE AS SHOWN :

3. REINFORCEMENT (a) 200mm<Max. DIMENSION (b) 500mm<Max. DIMENSION


OF OPENING (L)<500mm OF OPENING (L)<1000mm
3.1 UNLESS OTHERWISE SPECIFIED, ALL STEEL REINFORCEMENT BARS AND WELDED STEEL FABRIC
REINFORCEMENTS (WSFR) SHALL COMPLY WITH THE REQUIREMENTS OF ASTM.
45Ø 200<L<500 45Ø 45Ø 200<L<500 45Ø

3.2 CONCRETE COVER TO OUTERMOST REINFORCEMENT, INCLUDING LINKS, SHALL BE AS FOLLOWS : 1


0051

CLASS ROOM BLOCK 3 - GENERAL NOTE


STRUCTURAL IN CONTACT OTHER
ELEMENTS WITH GROUND
SLABS 50 mm 25 mm

BEAMS 50 mm (SIDE & BOT.) 25 mm

COLUMNS 50 mm 25 mm 5
1
5 0051

3.3 WELDING OF REINFORCEMENT WILL NOT BE PERMITTED WITHOUT THE APPROVAL OF THE ENGINEER. 45Ø
3.4 ALL BARS SHALL BE CUT AND BENT TO CONFORM TO BS4466.
UNLESS OTHERWISE STATED IN THE DRAWINGS, THE MINIMUM LAP LENGTH FOR REINFORCEMENT SHALL BE
50 TIMES THE DIA. OF SMALLER BAR IN THE LAP.

nEsPRIMARYSCHOOL
ALL BARS AT THE ENDS OF THE BEAMS WHERE THE BEAM IS NO MORE CONTINUOUS SHALL BE ANCHORED
EITHER STRAIGHT OR BENT (DEPENDING ON THE WIDTH OF THE SUPPORT). THESE SHALL
1-1

DRAWING TITLE
PROJECT NAME
NOT BE USED IN CANTILEVERED BEAMS OR SLABS. THE ACTUAL DESIGN DRAWING SHALL BE STRICTLY
ADHERE TO. 7.4 NOTES ON REPLACEMENT BARS :

a. NUMBER OF TRIMMER BARS SHALL NOT BE LESS THAN THE NUMBERS OF BARS CUT BY OPENING.

b. MINIMUM 2 NOS EACH AND BAR DIAMETER (T) SHALL BE EQUAL TO THE GREATEST DIAMETER OF THE
BARS CUT BY THE OPENING BUT NOT LESS THAN 2T12 TOP & BOTTOM.

c. BOTH PERPENDICULAR AND DIAGONAL TRIMMING BARS SHALL BE PROVIDED AS SHOWN ABOVE AND ON
EACH FACE OF THE MEMBER.. DRAWING NUMBER
6 6
ST-01/06

A B C D E F G H
1
6

2
4
A' A B C C'

Ø8 c/c 175 L=1550

Ø8 c/c 175 L=1550


C-1 C-2 C-3

550
EGA 500 Roof
Ø8 c/c 200 L=11400
13
90 90 A RHS Purlin 50x70mm RHS Purlin B EGA 500 C
70mm x 50mm Top Tie Beam 200x400mm
A

A
1000
+4.50m
No Ceiling

965
965
965
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520 965
2800
2467 874 870 650 965
3000

1150 2270 965


+3.44m 965
965
965

90

90
Ø8 c/c 175 L=10080 965
965

Ø8 c/c 200 L=9671


9900
1

Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


10

1000
1000
C-1 C-2 C-3
+2.50m +2.50m

12
200

1000
1000

3798
Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
Ø8 c/c 200 L=9671

Ø8 c/c 175 L=3420


870 650

Ø8 c/c 175 L=9340


2467 874
1150 2270

3138
Ø8 c/c 175 L=9340
90

90
Ø8 c/c 175 L=10080
3000

2800

9250

9250
9900

9250
Polythene Plastic Sheet

Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


Ø8 c/c 175

1000
1000
Ø8 c/c 200 +0.00m Ø8 c/c 175 Ø8 c/c 200
In Both Side In Both Side In Both Side
C-1 C-2 C-3 2% 2%
In Both Side

11
200

VAR.
B

VAR.

B
1000
1000

300

300

300
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
2467 874 870 650 750 750
750
1150 2270
150mm C-20/25 Reinforced concrete
(Trowel Floor Finish During Casting Time) Approved select material Compacted Approved Well Compacted Earth Soil
3000

2800

Approved Compacted selected


90

90
Ø8 c/c 175 L=10080 Polythene Plastic Sheet Under The Foundation
9900 material to 95% MDD in Layers n.e to 95% MDD in Layers n.e 200mm
500mm Selected Compact soil
500mm Well Compacted Earth Soil
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


200

400

400
10

1000
1000

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


2467 874 870 650
1150 2270
3000

2800

90

90
Ø8 c/c 175 L=10080
9900

Ø8 c/c 200 L=9400


Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


9
200

1000
C

C
1000
Ø8 c/c 200 L=9400

Ø8 c/c 175 L=9400

Ø8 c/c 175 L=9400

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


2467 874 870 650
1150 2270
2800
3000

9400

9400
90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


8
200

1000
1000

Ø8 c/c 200
In Both Side
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
2467 874 870 650
1150 2270
2800
3000

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3 Typical Foundation Section


36000

7
200

400

400
1000
D

1000

D
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
2467 874 870 650
1150 2270
2778
3000

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000

Ø8 c/c 250 L=9400


1000
1000

C-1 C-2 C-3


222

(Trowel Floor Finish During Casting Time)

500mm Selected Compact soil


Well Compacted Earth Soil
Polythene Plastic Sheet Under The Foundation
150mm C-20/25 Reinforced concrete
1000
1000
Ø8 c/c 250 L=9400

Ø8 c/c 175 L=9400

Ø8 c/c 175 L=9400

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


2467 874 870 650
1150 2270
3000

2800

9400
90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


+0.00m

5
200

1000
1000
E

E
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520 300
2467 874 870 650
1150 2270
3000

2800

90

90

Ø8 c/c 175 L=10080


9900
400
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

750

C-1 C-2 C-3


4
400

400

400

400
200

1000
1000

2%

Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


Ø8 c/c 175 L=3420 2467 874 870 650
1150 2270 VAR.
2800
3000

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 200
In Both Side
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000

Ø8 c/c 250 L=9750


1000
1000

874

C-1 C-2
Ø8 c/c 250 L=9750

Ø8 c/c 175 L=9340

3
200

1000
1000
F

F
Ø8 c/c 175 L=9340

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


90

2467 874 870 650


1150 2270
9250

9250
2800
3000

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


2
200

1000
1000

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


2467 924 650
1150 2270
3000

2800

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=1550

Ø8 c/c 175 L=1550


1000

1000

C-1 C-2 C-3


200

1 90 90
550

550

Ø8 c/c 200 L=11400


G

1'
G

400 6600 400 2200 400


7000 2600
10000

Ground Floor Slab Thickness 150mm @ +0.00m


1:40

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-02/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
CLASS ROOM BLOCK 3 - SIMPLE MAT Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
FOUNDATION PLAN & SECTION EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
H G F E D C B A

ST-03/06
6 6
DRAWING NUMBER

1
36000

3
5
8
9

2
4
10
11
12
13
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
200 200 200 200 222 200 200 200 200 200 200 200
2800 2800 2800 2800 2800 2778 2800 2800 2800 2800 2800 2800
200

PROJECT NAME

DRAWING TITLE
GB-2

400

nEsPRIMARYSCHOOL
A

BEAM DETAIL
5
5

7000
6600

CLASS ROOM BLOCK 3 - FOUNDATION


GB-1

GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1

10000

GB-1 BEAMS ON AXIS 1 ~ 10 (250X400mm) (10pcs)


GB-2
B

400

Ground Floor Beam Layout @ +0.00m


1:40

EMPLOYER
4

CONSULTANT
2600
2200
4

LAWE BERHANU

TEL: 0911419968
Gurdshola, derar Mall, 2nd Floor
GB-2

400
C

EMAIL: Lawe.partners@gmail.com
MINISTRY OF EDUCATION

CONSULTING ARCHITECTS & ENGINEERS


1:40

09
YEKA

WOREDA
K/KETEMA
LOCATION

TITLE DEED NO
3

AA000050904212
ADDIS ABEBA
3 GB-1 BEAMS ON AXIS 1 ~ 10 (250X400mm) (10pcs)
A B C

7000 2600

NO
2117 2267 2117 2100
1 1 4Ø14 3Ø14

DATE
1 1
50

SERKALEM N.
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150

DAWIT MELAKU
ST-1 ST-1

DRAFTS PERSON TEAM:


ARCHITECTURAL DESIGN
4Ø14 L=10500
325

400
400

9900

300
300

300
300
4Ø14 L=10500
4Ø14 3Ø14 150
9900

REVISION BY

LAWE BERHANU PPAR-366, AEA, ACI


250 250 ST-1
SECTION 1-1 SECTION 2-2 Ø8 c/c 150 L=1050

A
INDEX
2 2
GB-2 BEAMS ON AXIS A,B & C (250X400mm) (3pcs) Ø8 c/c 200 L=1050

CHECKED BY
DESIGN STAGE
FINAL DESIGN
1 2 3 4 5 6 7 8 9 10 11 12 13

3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000

THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
2 2 2 2 2 2 2 2 2 2 2 2

CHECKED BY
DATE OF ISSUE
2 2 2 2 2 2 2 2 2 2 2 2
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150

LAWE BERHANU
NOVEMBER 2022
700
700
FOR CONSTRUCTION PURPOSE ONLY
3Ø14 L=9700 3Ø14 L=9700
9400 3Ø14 L=9700 3Ø14 L=9700
9400

300
300

300
700 700 700
300

3Ø14 L=11200 3Ø14 L=9700


10900 3Ø14 L=6700 3Ø14 L=11200
10900

1 1

KEY PLAN

H G F E D C B A
1
6

2
4
150 150

13
A B C

st Ø8 c/c 150
A

A
3000
2700
2

2
13
200

Ø8 c/c 150 L=1100


Ø8 c/c 200 L=1100

12
3000

2800

150

350

st Ø8 c/c 150

3Ø14 L=9550
3000
2700
2

9222
12
200

50

ST-1

3Ø14 L=11050
10900
3000

2800

11
B

B
200

11

st Ø8 c/c 150
3000
2700
2

2
3Ø14
3Ø14

SECTION 2-2
ST-1
2800
3000

700
10
400
10
200

200

st Ø8 c/c 150

700
2700
3000

2
3000

2800
C

C
9
200

3Ø14 L=9878
st Ø8 c/c 150
3000
2700
2

2
3000

2800

3Ø14 L=9878
8
8
200

st Ø8 c/c 150
3000
2700
2

2
2800
3000
D

D
36000

7
200

700
7
BM-1

BM-1
2778
3000

st Ø8 c/c 150
3000
2700

700
2

2
222

6
2800
3000

3Ø14 L=9700

3Ø14 L=6700
st Ø8 c/c 150
E

E
3000
2700
2

5
200

5
3000

2800

st Ø8 c/c 150
2700
3000

700
2

4
200

700
4
3000

2800
F

F
BM-1 BEAMS ON AXIS A & C (600X200mm) (3pcs)

st Ø8 c/c 150
3000
2700
2

2
200

3
2800
3000

3Ø14 L=11050
10900

2
200

st Ø8 c/c 150

3Ø14 L=9550
3000
2700
2

9400
3000

2800

G
G

2
200

1
st Ø8 c/c 150
3000
2700
2

400 6600 400 2200 400


7000 2600
10000
1

150 150

BEAM LAYOUT @ LEVEL +2.50m


1:40

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-04/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
CLASS ROOM BLOCK 3 - INTERMEDIATE Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
BEAM DETAIL EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1
6

2
4
A B C

TTB-1
13

200
350 350
A

A
C
2800

3000
TTB-1

0
200
12

st Ø8 c/c 15
2111
2613

1
1
TTB-1 BEAMS ON AXIS 1~10 (200X400mm) (10pcs)
2800

3000
TTB-1

200
11
B

B
B
2800

3000

0
TTB-1

st Ø8 c/c 15
2345
10

200
2800

3000

8
4Ø14 L=1132

4Ø14 L=1132
TTB-1

10628

10628
9

200
C

C
2800

3000

1
0
1

st Ø8 c/c 20
2345
7035
TTB-1
8
200
2800

3000

TTB-1
D

D
36200

7
200

0
st Ø8 c/c 15
2093
2800

3000

TTB-1
200

0
st Ø8 c/c 15
A
2800

3000

802
452

TTB-1 350 350


E

E
5
200
2800

3000

Ø8 c/c 150 L=1100


Ø8 c/c 200 L=1100

TTB-1
4
200

345
2800

3000

150
50

ST-1

TTB-1
F

F
3
200
2800

3000

SECTION 1-1
4Ø14

4Ø14
ST-1

TTB-1
200

2
200
2800

3000

400
G

TTB-1
G

200

1
400 6600 400 2200 400
7000 2600

10000

INCLINED TOP TIE BEAM LAYOUT

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-05/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
CLASS ROOM BLOCK 3 - TOP TIE BEAM Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
DETAIL EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A

A
A B C
+4.48m
280
B

B
+4.20m
871

+3.54m
829

+2.50m
C

C
2500

+0.00m

-0.40m
7000 2600
D

D
+4.48m
300 300

+4.20m
300 300

1 1

+3.54m +3.54m
300 300
1 1

1 1
E

E
+2.50m +2.50m
St Ø8 c/c 200
200x400
St Ø8 c/c 200

3Ø14 L=5641
3Ø14 L=5609
3Ø14 L=5330
200x400

3Ø14 L=5340

4789

5021
4540
4510
3Ø14 L=4680
3Ø14 L=4650
St Ø8 c/c 200
200x400

3880
3850

1 1
1 1 1 1
F

F
+0.00m +0.00m +0.00m

-0.40m -0.40m -0.40m


500 500 500 500 500 500

Column C-1 Column C-2 Column C-3


1:50 1:50 1:50
G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-06/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
CLASS ROOM BLOCK 3 - COLUMN DETAIL Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
A B C D E F G H

KEY PLAN

NOTE: 4. ANTI TERMITE TREATMENT 7. STIRRUP & CROSS-TIE SHAPES


1 IN CASE OF DISCREPANCIES BETWEEN THE GENERAL NOTES/DETAILS AND ANY NOTES/DETAILS ON INDIVIDUAL
4.1 FOR SITES PRONE TO TERMITE FOUNDATION TRENCHES AND PITS SHALL BE TREATED PRIOR TO d
135°
1
PLACING OF ANY MATERIALS AND SECOND ROUND OF TREATMENT SHALL BE CARRIED OUT PRIOR TO
DRAWINGS, THE NOTES/DETAILS ON EACH DRAWING TAKE PRECEDENCE CONSTRUCTION OF THE GROUND FLOOR SLAB. CONTRACTOR SHALL SUPPLY NECESSARY INFORMATION d>=6Ø (10Ø)
FROM THE MANUFACTURES FOR ENGINEER'S APPROVAL. d d>=80mm (100mm)

90° 135°
VALUES GIVEN IN ( ) ARE FOR

b
1. GENERAL 5. CONCRETE CROSS TIE
MILD STEEL REINFORCEMENT
FOR CONSTRUCTION PURPOSE ONLY

1.1 ALL DIMENSIONS ARE IN mm. 5.1 UNLESS OTHERWISE SPECIFIED, ALL STRUCTURAL CONCRETE MIX TO BE OF GRADE C-25 135°

NOVEMBER 2022

LAWE BERHANU
DIMENSIONS ARE NOT TO BE SCALED FROM THE DRAWINGS. FOLLOW WRITTEN DIMENSIONS ONLY. 5.2 ALL CONCRETE STRENGTHS ARE 28 DAYS CUBE STRENGTH. 35° STIRRUPS & CROSS-TIES FOR COLUMNS, BEAM-COLUMN JOINTS,

DATE OF ISSUE
STIRRUPS OR HOOP BEAM CONFINEMENT ZONES AND WALL END ZONES

CHECKED BY
1.2 ALL STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL 5.3 UNLESS OTHERWISE SPECIFIED, A LAYER OF 50mm THICK GRADE C-5 CONCRETE TO BE PROVIDED BELOW ALL
DRAWINGS, SPECIFICATIONS, BILLS OF QUANTITIES AND ALL OTHER RELEVANT DOCUMENTS. REINFORCED CONCRETE STRUCTURES IN CONTACT WITH THE GROUND.

THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ENGINEER PRIOR TO COMMENCEMENT OF
WORK. 5.4 UNLESS OTHERWISE SPECIFIED, ALL LEAN CONCRETE MIX TO BE OF GRADE C-5.

1.3 THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCEMENT OF 5.5 MAXIMUM AGGREGATE SIZE SHALL BE 20mm.

FINAL DESIGN
WORKS AND ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

DESIGN STAGE
8. NOTATIONS

CHECKED BY
5.6 CURING OF CONCRETE
1.4 ALL CONCRETE SIZES AND LEVELS ARE FOR STRUCTURAL ELEMENTS UNLESS OTHERWISE NOTED. · EXPOSED CONCRETE SURFACES SHOULD BE COVERED WITH DAMP ABSORBENT MATERIAL AFTER
2 2

INDEX
PLACING CONCRETE. THEY SHOULD BE KEPT CONTINUOUSLY WET BY FREQUENT SPRAYING OF WATER. · EGL - EXISTING GROUND LEVEL

A
1.5 ALL OPENINGS FOR PIPING AND CONVEYANCE SHALL BE FORMED IN POSITION BEFORE THE CASTING OF · IN COLUMNS CURING SHOULD BE STARTED IMMEDIATELY AFTER REMOVAL OF FORMWORK.
CONCRETE. FOR LOCATION OF OPENINGS REQUIRED FOR M & E INSTALLATION REFER RELEVANT M & E · MINIMUM PERIOD OF CURING IS 7 DAYS.
· GFL - GROUND FLOOR LEVEL
DRAWINGS. · FFL - FINISHED FLOOR LEVEL

1.6 NO HOLES OR CHASES ARE PERMITTED IN THE CONCRETE MEMBERS UNLESS OTHER THAN AS DETAILED OR · B/W- BOTH WAYS
5.7 REMOVAL OF SHUTTERING :

LAWE BERHANU PPAR-366, AEA, ACI


REVISION BY
UNLESS APPROVED BY THE ENGINEER. · B - BOTTOM (B1 BOTTOM LAYER 1)
(B2 BOTTOM LAYER 2)
1.7 CONSTRUCTION JOINTS SHALL BE LOCATED BY THE APPROVAL OF THE ENGINEERS.
STRUCTURAL ELEMENTS MINIMUM PERIOD · T - TOP (T1 TOP LAYER 1)
1.8 ANY DAMAGE CAUSED TO ANY CIVIL/ STRUCTURAL WORK SHALL BE REINSTATED TO ITS ORIGINAL (T2 TOP LAYER 2)

ARCHITECTURAL DESIGN

DRAFTS PERSON TEAM:


CONDITION WITH NO COST IMPLICATION TO THE CLIENT. VERTICAL FORMWORK TO COLUMNS AND WALLS 24 HOURS
· C/C- CENTER TO CENTER

DAWIT MELAKU
1.9 ELECTRICAL CONDUITS SHOULD NOT BE PROVIDED WITH IN THE COVER TO THE REINFORCEMENT OF SOFFIT FORMWORK TO SLABS 14 DAYS · T20-25-100T HIGH YIELD STEEL 20mm DIAMETER BAR MARK 25 AT 100mm

SERKALEM N.
DATE
STRUCTURAL ELEMENTS. CENTERS ON TOP
SOFFIT FORMWORK TO BEAMS 14 DAYS
· B1 (200X400)

NO
PROPS TO BEAMS 21 DAYS
DEPTH OF BEAM
WIDTH OF BEAM
5.8 GRADE OF CONCRETE
2. FOUNDATIONS BEAM ID

CHARACTERISTIC 3

ADDIS ABEBA

AA000050904212
CONCRETE CUBE/ CYLINDER
3

TITLE DEED NO
2.1 BOTTOM OF EXCAVATIONS FOR WALLS & COLUMN FOUNDATIONS SHALL BE COMPACTED PRIOR TO STRENGTH, N/mm²
LAYING OF LEVELING SCREED.

LOCATION

K/KETEMA

WOREDA
BLINDING SCREED / LEVELING CONCRETE C7, (C5) 5

YEKA
2.2 FOUNDATIONS ARE DESIGNED FOR AN ALLOWABLE BEARING CAPACITY OF 200 kN/m²

09
BLINDING SCREED / LEVELING CONCRETE C15, (C12) 20
2.3 FOUNDATIONS TO BE EXCAVATED TO THE DEPTHS AS MENTIONED IN THE DRAWING.
STRUCTURAL CONCRETE C25, (C20) 25
2.4 FOUNDATION EXCAVATION TO BE APPROVED BY THE ENGINEERS PRIOR TO THE CONSTRUCTION OF
FOUNDATIONS.

2.5 CONTRACTOR SHALL CARRYOUT BACK FILLING OF EXCAVATIONS FOR FOUNDATIONS,


FILLING FOR GROUND SLAB AND SELECT MATERIAL FILLING AS PER THE RECOMMENDATIONS.

6. STANDARD TRIMMING DETAILS FOR

CONSULTING ARCHITECTS & ENGINEERS


2.6 ALL STRUCTURAL ELEMENTS IN THE GROUND SHALL HAVE A PLASTIC PROTECTIVE LAYER
AGAINST CONCRETE GETTING IN CONTACT WITH SOIL. STRUCTURAL OPENINGS

MINISTRY OF EDUCATION

EMAIL: Lawe.partners@gmail.com
2.7 UNDER THE FOUNDATION SHALL BE COMPACT 20CM THICKNESS WELL GRADED SELECT MATERIAL

Gurdshola, derar Mall, 2nd Floor


EVERY LEVEL TO ARCHIVE THE MAXIMUM DRY DENSITY OF 95%. 6.1 DIAMETER OF TRIMMER BARS SHALL BE SIMILAR TO BIGGER REINFORCING BARS OF THE STRUCTURE

TEL: 0911419968
THROUGH WHICH THE OPENING IS FORMED.

LAWE BERHANU
2.8 UNDER THE FOUNDATION SHALL BE COVERED BY POLYTHENE PLASTIC SHEET. THE QUALITY OF
MATERIAL SHALL BE APPROVED BY ENGINEER.
6.2 NO TRIMMER BARS ARE REQUIRED FOR OPENINGS NOT GREATER THAN 200mm WIDE , BUT NO REINFORCING 4
BARS SHALL BE CUT. REINFORCING BARS SHALL BE ADJUSTED IN POSITION TO AVOID OPENINGS.

CONSULTANT
4

EMPLOYER
6.3 UNLESS OTHERWISE SHOWN IN THE DRAWINGS, TRIMMER BAR DETAILS FOR THE DIFFERENT SIZE
OPENINGS ARE AS SHOWN :

3. REINFORCEMENT (a) 200mm<Max. DIMENSION (b) 500mm<Max. DIMENSION


OF OPENING (L)<500mm OF OPENING (L)<1000mm
3.1 UNLESS OTHERWISE SPECIFIED, ALL STEEL REINFORCEMENT BARS AND WELDED STEEL FABRIC
REINFORCEMENTS (WSFR) SHALL COMPLY WITH THE REQUIREMENTS OF ASTM.
45Ø 200<L<500 45Ø 45Ø 200<L<500 45Ø

3.2 CONCRETE COVER TO OUTERMOST REINFORCEMENT, INCLUDING LINKS, SHALL BE AS FOLLOWS : 1


0051

ADMINISTRATION,CLASS ROOM,IT CLASS


STRUCTURAL IN CONTACT OTHER
ELEMENTS WITH GROUND

& GENERAL CENTER - GENERAL NOTE


SLABS 50 mm 25 mm

BEAMS 50 mm (SIDE & BOT.) 25 mm

COLUMNS 50 mm 25 mm 5
1
0051
5
3.3 WELDING OF REINFORCEMENT WILL NOT BE PERMITTED WITHOUT THE APPROVAL OF THE ENGINEER. 45Ø
3.4 ALL BARS SHALL BE CUT AND BENT TO CONFORM TO BS4466.
UNLESS OTHERWISE STATED IN THE DRAWINGS, THE MINIMUM LAP LENGTH FOR REINFORCEMENT SHALL BE
50 TIMES THE DIA. OF SMALLER BAR IN THE LAP.

ALL BARS AT THE ENDS OF THE BEAMS WHERE THE BEAM IS NO MORE CONTINUOUS SHALL BE ANCHORED 1-1

nEsPRIMARYSCHOOL
EITHER STRAIGHT OR BENT (DEPENDING ON THE WIDTH OF THE SUPPORT). THESE SHALL
NOT BE USED IN CANTILEVERED BEAMS OR SLABS. THE ACTUAL DESIGN DRAWING SHALL BE STRICTLY

DRAWING TITLE
PROJECT NAME
ADHERE TO. 7.4 NOTES ON REPLACEMENT BARS :

a. NUMBER OF TRIMMER BARS SHALL NOT BE LESS THAN THE NUMBERS OF BARS CUT BY OPENING.

b. MINIMUM 2 NOS EACH AND BAR DIAMETER (T) SHALL BE EQUAL TO THE GREATEST DIAMETER OF THE
BARS CUT BY THE OPENING BUT NOT LESS THAN 2T12 TOP & BOTTOM.

c. BOTH PERPENDICULAR AND DIAGONAL TRIMMING BARS SHALL BE PROVIDED AS SHOWN ABOVE AND ON
EACH FACE OF THE MEMBER..
DRAWING NUMBER
6 6
ST-01/06

A B C D E F G H
1
6

2
4
EGA 500 Roof

A RHS Purlin 50x70mm RHS Purlin B EGA 500 C


70mm x 50mm Top Tie Beam 200x400mm
+4.50m
No Ceiling

965
965
965
965
965
A

A
965
+3.44m 965
965
965
965
965

1
10

+2.50m +2.50m

3798
3138
Polythene Plastic Sheet
Ø8 c/c 200 +0.00m Ø8 c/c 175 Ø8 c/c 175
Ø8 c/c 200
In Both Side In Both Side In Both Side
In Both Side
VAR. 2% 2%

VAR.
B

B
300

300

300
750 750
750

Approved Compacted selected 150mm C-20/25 Reinforced concrete Approved select material Compacted
material to 95% MDD in Layers n.e (Trowel Floor Finish During Casting Time) to 95% MDD in Layers n.e 200mm
Polythene Plastic Sheet Under The Foundation Approved Well Compacted Earth Soil
500mm
500mm Selected Compact soil
Well Compacted Earth Soil

A' A B C C'

10' Ø8 c/c 200 L=11400


Ø8 c/c 175 L=1550

Ø8 c/c 175 L=1550


C-1 C-2 C-3
550

550
90 90
200

10
1000

1000
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
2467 874 870 650
1150 2270
C

C
3000

2800

90

90
Ø8 c/c 175 L=10080
9900

Ø8 c/c 200 L=9750


Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


200

9
1000
1000
Ø8 c/c 200 L=9750

Ø8 c/c 175 L=9340

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


2467 874 870 650
1150 2270

Ø8 c/c 200
In Both Side
2800
3000

9250

9250
90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=9340
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


200

8
Typical Foundation Section
1000
1000

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


2467 874 870 650
D

1150 2270

D
2800
3000

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


7
200

400

400

400

400
1000
1000

(Trowel Floor Finish During Casting Time)

500mm Selected Compact soil


Well Compacted Earth Soil
Polythene Plastic Sheet Under The Foundation
150mm C-20/25 Reinforced concrete
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
2467 874 870 650
1150 2270
2778
3000

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000

Ø8 c/c 250 L=9400


1000
1000

C-1 C-2 C-3


222

6
+0.00m
1000
1000
Ø8 c/c 250 L=9400

Ø8 c/c 175 L=9400

Ø8 c/c 175 L=9400

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


2467 874 870 650
E

E
1150 2270
27000

2800
3000

90

90

Ø8 c/c 175 L=10080 300


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


400

5
200

750
1000
1000

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


2%

2467 874 870 650


1150 2270
2800
3000

90

90

Ø8 c/c 175 L=10080


9900 VAR.
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

Ø8 c/c 200
In Both Side

C-1 C-2 C-3


4
200

400

400

400

400
1000
1000

Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


Ø8 c/c 175 L=3420 2467 874 870 650
F

F
1150 2270
3000

2800

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000

Ø8 c/c 250 L=9750


1000
1000

C-1 C-2
Ø8 c/c 250 L=9750

Ø8 c/c 175 L=9340

3
200

1000
1000
Ø8 c/c 175 L=9340

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


90

2467 874 870 650


1150 2270
9250

9250
3000

2800

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=2000

Ø8 c/c 175 L=2000


1000
1000

C-1 C-2 C-3


2
200

1000
1000

Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520


924 650
G

2467 874
G

1150 2270
3000

2800

90

90

Ø8 c/c 175 L=10080


9900
Ø8 c/c 175 L=1550

Ø8 c/c 175 L=1550


1000

1000

C-1 C-2 C-3


1
200

90 90
550

550

Ø8 c/c 200 L=11400

1' 400 6600 400 2200 400


7000 2600
10000

Ground Floor Slab Thickness 150mm @ +0.00m


1:40

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-02/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
ADMINISTRATION,CLASS ROOM,IT CLASS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
& GENERAL CENTER - SIMPLE MAT EMAIL: Lawe.partners@gmail.com

FOUNDATION PLAN & SECTION


1
6

2
4
H G F E D C B A

ST-03/06
6 6
DRAWING NUMBER

1
27000

3
5
6
8
9

2
4
10
3000 3000 3000 3000 3000 3000 3000 3000 3000
200 200 200 200 222 200 200 200 200
2800 2800 2800 2800 2800 2778 2800 2800 2800
200

PROJECT NAME

DRAWING TITLE
GB-2

nEsPRIMARYSCHOOL
400
A

BEAM DETAIL
5
5

& GENERAL CENTER - FOUNDATION


ADMINISTRATION,CLASS ROOM,IT CLASS
7000
6600
GB-1

GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1

10000

EMPLOYER
4

CONSULTANT
4
GB-2

LAWE BERHANU

TEL: 0911419968
B

400

Ground Floor Beam Layout @ +0.00m

Gurdshola, derar Mall, 2nd Floor


1:40

EMAIL: Lawe.partners@gmail.com
MINISTRY OF EDUCATION
2600

CONSULTING ARCHITECTS & ENGINEERS


2200
GB-2

400
C

09
YEKA

WOREDA
K/KETEMA
LOCATION

TITLE DEED NO
3

AA000050904212
ADDIS ABEBA
3
GB-1 BEAMS ON AXIS 1 ~ 10 (250X400mm) (10pcs)
A B C

NO
4Ø14 3Ø14
7000 2600

DATE
2117 2267 2117 2100
50

SERKALEM N.
1 1

DAWIT MELAKU
ST-1 ST-1

DRAFTS PERSON TEAM:


1 1

ARCHITECTURAL DESIGN
325

400
400

st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150

4Ø14 3Ø14 150


4Ø14 L=10500

REVISION BY

LAWE BERHANU PPAR-366, AEA, ACI


9900 250

300
300
250 ST-1

300
300
4Ø14 L=10500
9900
SECTION 1-1 SECTION 2-2 Ø8 c/c 150 L=1050

A
INDEX
2 2
Ø8 c/c 200 L=1050

CHECKED BY
DESIGN STAGE
FINAL DESIGN
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
GB-2 BEAMS ON AXIS A,B & C (250X400mm) (3pcs)

CHECKED BY
DATE OF ISSUE
1 2 3 4 5 6 7 8 9 10

LAWE BERHANU
NOVEMBER 2022
3000 3000 3000 3000 3000 3000 3000 3000 3000
FOR CONSTRUCTION PURPOSE ONLY
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150

700
700
3Ø14 L=9700 3Ø14 L=9700
9400 3Ø14 L=9700
9400

300
300

1 1

300
300

700 700
3Ø14 L=11200 3Ø14 L=11200
10900 3Ø14 L=6700
10900

KEY PLAN

H G F E D C B A
H G F E D C B A

ST-04/06
6 6
DRAWING NUMBER

1
27000

3
5
6
8
9

2
4
10
3000 3000 3000 3000 3000 3000 3000 3000 3000
200 200 200 200 222 200 200 200 200
2800 2800 2800 2800 2800 2778 2800 2800 2800
200

PROJECT NAME

DRAWING TITLE
nEsPRIMARYSCHOOL

BEAM DETAIL
BM-1

400
A

5
5

& GENERAL CENTER - INTERMEDIATE


ADMINISTRATION,CLASS ROOM,IT CLASS
7000
6600

10000

EMPLOYER
4

CONSULTANT
4

LAWE BERHANU

TEL: 0911419968
Gurdshola, derar Mall, 2nd Floor
BM-1

EMAIL: Lawe.partners@gmail.com
B

400

MINISTRY OF EDUCATION

CONSULTING ARCHITECTS & ENGINEERS


2600

BEAM LAYOUT @ LEVEL +2.50m


2200

1:40

09
400
C

YEKA

WOREDA
K/KETEMA
LOCATION

TITLE DEED NO
3

AA000050904212
ADDIS ABEBA
3

GB-1 BEAMS ON AXIS 1 ~ 10 (250X400mm) (10pcs)

NO
A B C

DATE

SERKALEM N.
DAWIT MELAKU
7000 2600

2117 2267 2117 2100

DRAFTS PERSON TEAM:


1 1

ARCHITECTURAL DESIGN
1 1
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150

REVISION BY

LAWE BERHANU PPAR-366, AEA, ACI


4Ø14 L=10500

9900

300
300
50
3Ø14

A
300
300
150

4Ø14 L=10500

INDEX
9900
2 2
ST-1 350

CHECKED BY
200

DESIGN STAGE
FINAL DESIGN
3Ø14 ST-1
400

THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
Ø8 c/c 150 L=1100
SECTION 1-1

CHECKED BY
GB-2 BEAMS ON AXIS A,B & C (250X400mm) (3pcs)

DATE OF ISSUE
Ø8 c/c 200 L=1100

LAWE BERHANU
NOVEMBER 2022
FOR CONSTRUCTION PURPOSE ONLY 1 2 3 4 5 6 7 8 9 10

3000 3000 3000 3000 3000 3000 3000 3000 3000


1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 2 2 2
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150

700
700
3Ø14 L=9700 3Ø14 L=9700
1 1
9400 3Ø14 L=9700
9400

300
300

300
300

700 700
3Ø14 L=11200 3Ø14 L=11200
10900 3Ø14 L=6700
10900

KEY PLAN

H G F E D C B A
1
6

2
4
350 350

A B C

C
A

A
TTB-1
10

200

0
st Ø8 c/c 15
2111
2613

1
1
TTB-1 BEAMS ON AXIS 1~10 (200X400mm) (10pcs)
2800

3000
TTB-1
9

200

B
B

B
2800

3000

0
st Ø8 c/c 15
2345
TTB-1
8

200

8
4Ø14 L=1132

4Ø14 L=1132
2800

3000

10628

10628
TTB-1
C

C
1
0
7

200

st Ø8 c/c 20
2345
7035
2800

3000

TTB-1
6
200

0
st Ø8 c/c 15
2093
D

D
27200
2800

3000

TTB-1
5
200

0
st Ø8 c/c 15
A

802
452
2800

3000

350 350

TTB-1
4
200
E

E
Ø8 c/c 150 L=1100
Ø8 c/c 200 L=1100
2800

3000

345
TTB-1
150
50

3
200

ST-1
2800

3000
F

F
TTB-1
SECTION 1-1
4Ø14

4Ø14
ST-1

2
200

200
2800

3000

400

TTB-1
1
200

G
G

400 6600 400 2200 400


7000 2600

10000

INCLINED TOP TIE BEAM LAYOUT

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-05/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
ADMINISTRATION,CLASS ROOM,IT CLASS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
& GENERAL CENTER - TOP TIE BEAM EMAIL: Lawe.partners@gmail.com

DETAIL
1
5
6

2
4
1
6

2
4
A

A
A B C
B

B
+4.48m
280

+4.20m
871

+3.54m
829

+2.50m
C

C
2500

+0.00m

-0.40m
D

D
7000 2600

+4.48m
300 300

+4.20m
300 300

1 1

+3.54m +3.54m
300 300
1 1
E

E
1 1

+2.50m +2.50m
St Ø8 c/c 200
200x400
St Ø8 c/c 200

3Ø14 L=5641
3Ø14 L=5609
3Ø14 L=5330
200x400

3Ø14 L=5340

4789

5021
4540
4510
3Ø14 L=4680
3Ø14 L=4650
St Ø8 c/c 200
200x400

3880
3850

1 1
1 1 1 1
F

+0.00m +0.00m +0.00m

-0.40m -0.40m -0.40m


500 500 500 500 500 500

Column C-1 Column C-2 Column C-3


1:50 1:50 1:50
G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-06/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
ADMINISTRATION,CLASS ROOM,IT CLASS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
& GENERAL CENTER - COLUMN DETAIL EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
RHS Purlin
70mm x 50mm

A B C
A

A
EGA 500 Roof
+4.24m
50x70mm RHS Purlin
EGA 500 Roof Sheet
No Ceiling 1000
1000
1000
1000
+3.44m 1000
1000
1000
1000
1
10

+2.50m +2.50m
B

B
Polythene Plastic Sheet
Ø8 c/c 200 Ø8 c/c 200 Ø8 c/c 200
+0.00m Ø8 c/c 200
In Both Side In Both Side In Both Side
In Both Side
2% 2%
C

C
150mm C-20/25 Reinforced concrete
(Trowel Floor Finish During Casting Time)
Polythene Plastic Sheet Under The Foundation
50mm C-5 Lean Concrete under Foundation Beams
500mm Selected Compact soil
Well Compacted Earth Soil
D

D
Typical Foundation Section

400
E

E
Ø8 c/c 200 +0.00m Ø8 c/c 200
In Both Side In Both Side
2%
F

150mm C-20/25 Reinforced concrete


G

(Trowel Floor Finish During Casting Time)


G

Polythene Plastic Sheet Under The Foundation


50mm C-5 Lean Concrete Under Foundation Beam
500mm Selected Compact Soil
Well Compacted Earth Soil
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-01/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
COMMON TOILET - SECTION VIEW Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A

A
A B C
1200 4400 2600 700

Ø8 c/c 200 L=8800

Ø8 c/c 200 L=1550

Ø8 c/c 200 L=1550

500
550

600
536
B

B
90 90

200
3

1000

1000
Ø8 c/c 200 L=2617 Ø8 c/c 200 L=2530 Ø8 c/c 200 L=1517
1150 1467 1663 867 841 650

2800

3000
C

C
90

90
Ø8 c/c 200 L=7480
7300

Ø8 c/c 200 L=6280


Ø8 c/c 200 L=7100

Ø8 c/c 200 L=6280

Ø8 c/c 200 L=2000

Ø8 c/c 200 L=2000

Ø8 c/c 200 L=7100


1000

1000
6100

6100

7200
200
2
1000

1000
D

D
Ø8 c/c 200 L=2617 Ø8 c/c 200 L=2530 Ø8 c/c 200 L=1517
1150 1467 1663 867 841 650

2800

3000
90

90
Ø8 c/c 200 L=7480
7300
Ø8 c/c 200 L=1550

Ø8 c/c 200 L=1550


1000

1000
E

E
200
1 90 90
550

550

600
500
Ø8 c/c 200 L=8800

Ground Floor Slab Thickness 150mm @ +0.00m


1:20
F

F
G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-02/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
COMMON TOILET- SIMPLE MAT Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
FOUNDATION DETAIL EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1
6

2
4
A B C
A

A
GB-1

200
3

2800
3000
B

B
GB-1
6200
200

2
GB-2

GB-2

GB-2
2800
3000

GB-1
C

C
200

1 400 4000 2200 400


400
4400 2600
7400

Ground Floor Slab Thickness 150mm @ +0.00m


1:30

GB-1 BEAMS ON AXIS A & C (250X400mm) (3pcs)


D

D
A B C

4400 2600
3900 2100
1 1

1 1

st Ø8 c/c 150 st Ø8 c/c 150


E

E
4Ø14 L=7900
300

300

7300
300

300

4Ø14 L=7900 3Ø14


7300
400

ST-1

3Ø14
GB-2 BEAMS ON AXIS A & C (250X400mm) (3pcs) 250
F

F
A B C SECTION 1-1
3000 3000

2700 2700
50

1 1
325

1 1

st Ø8 c/c 150 st Ø8 c/c 150


150
ST-1
G
G

3Ø14 L=6700
Ø8 c/c 150 L=1050
300

300

6100

Ø8 c/c 200 L=1050


300

300

3Ø14 L=6700
6100

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-03/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
COMMON TOILET- FOUNDATION BEAM Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
DETAIL EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A B C
A

A
3

BM-1

BM-1
B

B
2
C

C
1
D

D
Ground Floor Slab Thickness 150mm @ +0.00m
1:25
BM-1 BEAMS ON AXIS A & B (600X200mm) (2pcs)

1 2 3
E

E
3000 3000
2700 2700
1 1

1 1

st Ø8 c/c 125 st Ø8 c/c 125


F

F
3Ø14 L=6450
150

150

6125
150

150

3Ø14 L=6450
6125
G
50
G

3Ø14
150

350
200

ST-1

3Ø14 ST-1
400
Ø8 c/c 150 L=1100
SECTION 1-1 Ø8 c/c 200 L=1100
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-04/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
COMMON TOILET- INTERMEDIATE BEAM Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
DETAIL EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1
6

2
4
A B C
A

A
TTB-1
3
B

B
TTB-1
2
C

C
TTB-1
1

Ground Floor Slab Thickness 150mm @ +0.00m


1:25
D

D
TB-1 BEAMS ON AXIS 1~3 (200X400mm) (3pcs)
A B C

2093
7035 1

3919
802 1
E

E
452 1
0
st Ø8 c/c 15
1
0
st Ø8 c/c 15

5
st Ø8 c/c 12
300

4Ø14 L=8590
F

F
7990
300
300

4Ø14 L=8590
7990
300

3Ø14
50
400

345

ST-1
G
G

3Ø14 150
200 ST-1
SECTION 1-1 Ø8 c/c 150 L=1100
Ø8 c/c 200 L=1100
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-05/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
COMMON TOILET- TOP TIE BEAM DETAIL Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A B C
+4.22m

440 260
A

A
+3.96m

+3.52m
1020

+2.50m
B

B
2500

+0.00m
C

C
-0.40m
4400 2600

Columns
+4.22m +4.22m
D

D
300 300
+3.96m
300 300
1 1

+3.52m +3.52m +3.96m


300 300
1 1

1 1

+2.50m +2.50m +2.50m


St Ø8 c/c 200
+2.50m
E

E
200x400
St Ø8 c/c 200

3Ø14 L=5101

3Ø14 L=5348
200x400

3Ø14 L=5382
3Ø14 L=5089

4540

4528
3Ø14 L=4661

4762
3Ø14 L=4650
St Ø8 c/c 200

4510
200x400

3861
3829

1 1
1 1 1 1
F

F
+0.00m +0.00m +0.00m +0.00m

-0.40m -0.40m -0.40m -0.40m


500 500 500 500 500 500

Column C-1 Column C-2 Column C-3


1:20 1:20 1:20

6Ø14
50

ST-3
150

G
G

200

350

400 ST-1
Ø8 c/c 200 L=1100
SECTION 1-1
1:10

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-06/06

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
COMMON TOILET- COLUMN DETAILS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1
6

2
4
A B C A B C
A

A
10000 10600
7000 2600
800 7000 2800
3500 3500 700 1000 1000 1000 1000 1000 1000 1000 900 900 900

10 10
520

D1
640

WD1
3000

3000
680
640

WD1
520

9 9
520
B

B
640

WD1

CLASSROOM 1 Shelf
3000

3000
680

60 m2
640

WD1
520

8 8
520
640

WD1
3000

3000
680
640

WD1
C

C
520

7 7
520

D1
640

WD1

A A A A
3000

680

3000
640

WD1
520

6 6
520
640

WD1

CLASSROOM 2
27200

27200
3000

3000
680
D

D
60 m2
640

WD1
Trawel finish
during casting
520

5 5
520
640

WD1
3000

3000
680
640

WD1
520

4 4
520

D1
E

E
640

WD1
3000

3000
680
640

WD1
520

3 3
520
640

WD1

CLASSROOM 3
3000

3000
680

60 m2
640

WD1
520
F

F
2 2
520
640

WD1
3000

3000
680
640

WD1
520

1 1

Ground Floor Plan @ +000 Roof Plan


G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-01/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
CLASS ROOM FLOOR & ROOF PLAN Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A

A
1 2 3 4 5 6 7 8 9 10

+4500

A B C A A C B C B

+2500

GRADE 5 GRADE 5 GRADE 5


COLOR COLOR COLOR
BLUE YELLOW RED
Plasted and Painted Plasted and Painted Plasted and Painted
B

B
+000

Front View

10 9 8 7 6 5 4 3 2 1
C

C
D D E E D D E D D
+2500

+700

Plastered & Plastered &


Painted Painted +000
D

D
Rear Elevation
E

E
A B C
A B C
200
7000 2600
+4500
+4500
EGA 500 Roof
50x70mm RHS Purlin
No Ceiling
+3440
1720
1020

440
440

240
220
200

4500

Plastered &
Plasted and Painted
3440

Painted
1600
F

F
2500

Ceramic Window Sill Plastic Sheet


Moisture Separator

+000
700

+000
2% 2%
2% 2%

compacted selected
Side Elevation materials

Section A-A
G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-02/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
CLASS ROOM ELEVATION & SECTION Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1
6

2
4
A

A
W1 DESCRIPTION W2 DESCRIPTION

SIZE 600 x 1600 SIZE 400 x 400

FRAMING TYPE Steel FRAMING TYPE Steel

600 5mm thick clear glass Louvered glass 5mm


GLAZING TYPE 400 GLAZING TYPE
+2300
B

B
400

20x20x1mm
20x20x1mm
RHS flashing
GLAZING AREA 0.34 m2 RHS flashing
GLAZING AREA 0.14m2

400

400
5mm clear glass 5mm clear glass
1600

TOTAL WINDOW 0.96 m2 TOTAL WINDOW 0.15m2


AREA AREA
+1000

600 QUANTITY 18 QUANTITY 27

LOCATION Class Room Unit LOCATION Class Room Unit

D1 Shelf
C

C
DESCRIPTION

Door Handle

SIZE 1000 x 2300


38mm L Door Jam

150

STEEL

40
FRAMING TYPE
200x280x40mm
900
40 40
820
+2300
STEEL 150 Solid Wood Panel
38mm
L Door Jam
38mm
40x40x2mm RHS PANEL TYPE 40x40 angle
@ 800mm H

150
L Door Jam
Door Frame Iron support
340

40x40x3mm Angle Iron


Frame

15x15x1mm
Angle Flashing

15x15x1mm
Angle Flashing PANEL AREA 1.4 m2 150

40x40 angle
2300

150
Iron support
1570

Door
2250

Handle
200

TOTAL DOOR
100

2.3 m2
D

D
Out AREA 150
1000

40
In
40

50

+0.00
340

50

25x25x2mm RHS
315

Louver
50
40 50

3
40x40x2mm RHS

1000
Door Frame
QUANTITY

38mm L Door Jam Door Leaf Out LOCATION Class Room Block
E

E
W3
DESCRIPTION

SIZE 220 x 220

FRAMING TYPE Steel

Louvered glass 5mm


220

GLAZING TYPE
220

20x20x1mm
RHS flashing
0.03 m2
F

F
220

220

5mm clear glass GLAZING AREA

TOTAL WINDOW 0.05 m2


AREA

QUANTITY 27

LOCATION Class Room Unit


G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-03/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
CLASS ROOM FLOOR & ROOF PLAN Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A

A
Window Detail - Front

5 6 9 10 8 9
4
1
A 5
2
7
2
B 8
3
6
3
C 7
4
B

B
1180 440 1180 440 420 420 440

420 240 240 420


440

440

440
240

240
420

1180 440 1180


440 240 420
1100

1100

1100

1100

1100
240
440

440

440
420
1180 1180
440
240

240

240
2800 2800 2800

Window
220x220mm
Window Window Window Window Window
400x400mm 220x220mm 400x400mm 220x220mm 400x400mm
C

C
Type A Wall Opening Type B Wall Opening Type C Wall Opening

Window Detail - Rear


D

D
3 2
5 4 2 1
6
9
D 5
8
4
7
E 3
6
10 9 8 7
240

240

420 240 520 440 520 240 420 240 520 440 2380 520 240 420
440

440
240

240
660

660
220

220

220

220

2780 2780
E

E
400x400mm Window Window 400x400mm Window
220x220mm 400x400mm 220x220mm
Window
400x400mm

Type D Type E
Wall Opening Wall Opening
F

F
G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-01/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
CLASS ROOM FLOOR & ROOF PLAN Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1
6

3
4

2
A B C A B C

10000 10600
7000 2600
800 7000 2800
A

A
3500 3500 700 1000 1000 1000 1000 1000 1000 1000 900 900 900

13 13

520
D1
640
WD1
3000

3000
680
640

WD1
520

12 12
520
640

WD1

CLASSROOM 1 Shelf
3000

3000
680

60 m2
640
B

B
WD1

FLOOR
520

11 11
520
640

WD1
3000

3000
680
640

WD1
520

10 10
520

D1
640

WD1
3000

3000
680
C

C
640

WD1
520

9 9
520
640

WD1

CLASSROOM 2 Shelf
3000

3000
680

60 m2
640

WD1
520

8 8
520
640

WD1
3000

3000
680
D

D
640

WD1
520
36200

36200

7 7
520

D1
640

WD1

A A A A
3000

680

3000
640

WD1
520

6 6
520
640

WD1
E

E
CLASSROOM 3
3000

3000
680

60 m2
640

WD1
Trawel finish
during casting
520

5 5
520
640

WD1
3000

3000
680
640

WD1
520

4 4
520

D1
640
F

F
WD1
3000

3000
680
640

WD1
520

3 3
520
640

WD1

CLASSROOM 4
3000

3000
680

60 m2
640

WD1
520

2 2
520

G
G

640

WD1
3000

3000
680
640

WD1
520

1 1

Ground Floor Plan @ +000 Roof Plan

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-01/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
FLOOR PLAN Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
6

3
4

2
A B C D E F G H

KEY PLAN

FLOOR

1 1
1 2 3 4 5 6 7 8 9 10 11 12 13

+4500

B C C B C B B C B FOR CONSTRUCTION PURPOSE ONLY


A A A

NOVEMBER 2022

LAWE BERHANU
+2500

DATE OF ISSUE

CHECKED BY
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
GRADE 5 GRADE 5 GRADE 5 GRADE 5
COLOR COLOR COLOR COLOR

FINAL DESIGN
BLUE YELLOW RED RED
Plasted and Painted Plasted and Painted Plasted and Painted Plasted and Painted

DESIGN STAGE
CHECKED BY
2 2

INDEX
+000

A
Front View

LAWE BERHANU PPAR-366, AEA, ACI


REVISION BY
ARCHITECTURAL DESIGN

DRAFTS PERSON TEAM:


DAWIT MELAKU

SERKALEM N.
DATE
NO
10 9 8 10 9 8 7 6 5 4 3 2 1

ADDIS ABEBA

AA000050904212
3

TITLE DEED NO
LOCATION

K/KETEMA

WOREDA
YEKA
D D E D D E E D D E D D

09
+2500

+700

CONSULTING ARCHITECTS & ENGINEERS


Plastered & Plastered & Plastered &
Painted Painted Painted +000

MINISTRY OF EDUCATION

EMAIL: Lawe.partners@gmail.com
Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968
LAWE BERHANU
Rear Elevation 4

CONSULTANT
4

EMPLOYER
A B C
200
7000 2600
+4500
A B C
EGA 500 Roof
50x70mm RHS Purlin
+4500
No Ceiling
+3440

1720
1020

440
440

240
220
200

4500

ELEVATIONS AND SECTIONS


5 Plasted and Painted
3440

1600

Plastered &

2500
Painted Ceramic Window Sill Plastic Sheet
Moisture Separator

+000
700

nEsPRIMARYSCHOOL
2% 2%

DRAWING TITLE
PROJECT NAME
+000

2% 2%

compacted selected
materials

Side Elevation Section A-A


DRAWING NUMBER
6 6
AR-02/04

A B C D E F G H
1
6

2
4
W1 DESCRIPTION W2 DESCRIPTION
A

A
SIZE 600 x 1600 SIZE 400 x 400

FRAMING TYPE Steel FRAMING TYPE Steel

600 5mm thick clear glass Louvered glass 5mm


GLAZING TYPE 400 GLAZING TYPE
+2300
400

20x20x1mm
20x20x1mm
RHS flashing
GLAZING AREA 0.34 m2 RHS flashing
GLAZING AREA 0.14m2

400

400
5mm clear glass 5mm clear glass
1600

TOTAL WINDOW 0.96 m2 TOTAL WINDOW 0.15m2


AREA AREA
+1000
B

B
FLOOR
600 QUANTITY 24 QUANTITY 36

LOCATION Class Room Unit LOCATION Class Room Unit

D1 DESCRIPTION
Shelf

Door Handle

SIZE 1000 x 2300


38mm L Door Jam

150
C

C
STEEL

40
FRAMING TYPE
200x280x40mm
900
40 40
820
+2300
STEEL 150 Solid Wood Panel
38mm
L Door Jam
38mm
40x40x2mm RHS PANEL TYPE 40x40 angle
@ 800mm H

150
L Door Jam
Door Frame Iron support
340

40x40x3mm Angle Iron


Frame

15x15x1mm
Angle Flashing

15x15x1mm
Angle Flashing PANEL AREA 1.4 m2 150

40x40 angle
2300

150
Iron support
1570

Door
2250

Handle
200

TOTAL DOOR
100

2.3 m2
Out AREA 150
1000

40
In
40

50

+0.00
340

50

25x25x2mm RHS
315

Louver
50
40 50

4
40x40x2mm RHS

1000
Door Frame
QUANTITY

38mm L Door Jam Door Leaf Out LOCATION Class Room Block
D

D
W3
DESCRIPTION
E

E
SIZE 220 x 220

FRAMING TYPE Steel

Louvered glass 5mm


220

GLAZING TYPE
220

20x20x1mm
RHS flashing
0.03 m2
220

220

5mm clear glass GLAZING AREA

TOTAL WINDOW 0.05 m2


AREA
F

F
QUANTITY 36

LOCATION Class Room Unit


G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-03/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
FLOOR PLAN Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A

A
Window Detail - Front

5 6 9 10 8 9
4
1
A 5
2
7
2
B 8
3
6
3
C 7
4
B

B
1180 440 1180 440 420 420 440

FLOOR
420 240 240 420
440

440

440
240

240
420

1180 440 1180


440 240 420
1100

1100

1100

1100

1100
240
440

440

440
420
1180 1180
440
240

240

240
2800 2800 2800

Window
220x220mm
Window Window Window Window Window
400x400mm 220x220mm 400x400mm 220x220mm 400x400mm

Type A Wall Opening Type B Wall Opening Type C Wall Opening


C

C
Window Detail - Rear
D

D
3 2
5 4 2 1
6
9
D 5
8
4
7
E 3
6
10 9 8 7
240

240

420 240 520 440 520 240 420 240 520 440 2380 520 240 420
440

440
240

240
660

660
220

220

220

220

2780 2780

400x400mm Window Window 400x400mm Window


E

E
220x220mm 400x400mm 220x220mm
Window
400x400mm

Type D Type E
Wall Opening Wall Opening
F

F
G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-04/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
FLOOR PLAN Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1

6
5
3
2

4
1
3

A
A

3440
6000
2500 1020

+3440
3000 3000

2%

1
A
A

600
1500

WD1

+2500

+2500
Girls
Clean

Section A-A
WD2

Rear Elevation
WD2

000
4400

2
WD2
7000

B
B

compacted selected materials


Girls Toilet
Jan

WD3

WD2
Disabled

B
B

Ground Floor Plan @+0.00


2500 1460
2600

3
000

Moisture Separator
Plastic Sheet
C
C

2%
+4240

C
C

1
3

6200
100 100
+3440

3000 3000

2%
200

A
A

+2500

000
WD2
Urinal

WD2

Side Elevation
4400

D
D

WD2
7000
7400

Boys Toilet
Jan

WD3

WD2
Disabled

B
B

Ground Floor Plan @+0.00


2600

C
C

200

2%

E
E

+4240
1
3

6000

3000 3000
800
A

0.00

F
F

1
4400

Front Elevation
8000

2
Roof Plan @+4240
B

2600
G

G
C

3
+4240

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
KEY PLAN

YEKA
H
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
DRAWING NUMBER

CONSULTING ARCHITECTS & ENGINEERS CHECKED BY


Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
AR-01/02

COMMON TOILET FLOOR,ROOF,ELEVATION & TEL: 0911419968 AA000050904212


SERKALEM N. LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
FOR CONSTRUCTION PURPOSE ONLY

SECTION PLANELEVATIONS AND SECTIONS


1

6
3
2

4
A B C D E F G H

KEY PLAN

40 650 40
D1 DESCRIPTION
40x40x4mm

340
40x40x2mm RHS
1 Angle Iron
Door Jam
Door Frame 1
SIZE 800 x 2300
WD1
25x25x3mm Angle Iron
Frame

FRAMING TYPE STEEL

+2300 PANEL TYPE STEEL FOR CONSTRUCTION PURPOSE ONLY

NOVEMBER 2022

LAWE BERHANU
2300
1620

DATE OF ISSUE
Door
1.04 m2

CHECKED BY
Handle
PANEL AREA

THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
pad lock
2300

2280

TOTAL DOOR
1.6 m2
AREA

FINAL DESIGN
DESIGN STAGE
CHECKED BY
0.8mm Corrugated

2 +0.00 1
Out Sheet Metal
2

INDEX
QUANTITY

A
In
800 730

25
LOCATION Toilet Blocks

50
340

50
38mm L Door Jam Door Leaf Out 25x25x2mm RHS

315
Louver

LAWE BERHANU PPAR-366, AEA, ACI


50

REVISION BY
40 50
40x40x2mm RHS
Door Frame
Door Handle

ARCHITECTURAL DESIGN

DRAFTS PERSON TEAM:


DAWIT MELAKU

SERKALEM N.
38mm L Door Jam

DATE
D2 Door Leaf In

NO
DESCRIPTION

SIZE 600 x 2300 3

ADDIS ABEBA

AA000050904212
3

TITLE DEED NO
LOCATION

K/KETEMA

WOREDA
40 450 40

YEKA
FRAMING TYPE STEEL 40 785 40

09
+2300 PANEL TYPE STEEL 40x40x4mm

340
40x40x2mm RHS
40x40x4mm

340
Angle Iron Door Frame 40x40x2mm RHS
Door Jam Angle Iron Door Frame
Door Jam

0.7 m2

CONSULTING ARCHITECTS & ENGINEERS


25x25x3mm Angle Iron
PANEL AREA Frame 25x25x3mm Angle Iron
Frame
2280
2300

MINISTRY OF EDUCATION
TOTAL DOOR

EMAIL: Lawe.partners@gmail.com
1.2 m2
AREA

Gurdshola, derar Mall, 2nd Floor


TEL: 0911419968
LAWE BERHANU
+0.00 QUANTITY 8 4

2300
1620

2300
1620

CONSULTANT
Door
4 530 Door

EMPLOYER
600 Handle
Handle
Door Leaf Out
LOCATION Toilet Blocks
38mm L Door Jam
pad lock
pad lock

0.8mm Corrugated
Out Sheet Metal 0.8mm Corrugated
Out Sheet Metal

In
In

COMMON TOILET WINDOW DOOR SCHEDULE


25

50
340

25

50
340
50
25x25x2mm RHS

315

50
D3 Louver 25x25x2mm RHS

50

315
Louver

50
40 50
DESCRIPTION

40 50
40x40x2mm RHS
Door Frame 40x40x2mm RHS
Door Handle Door Frame
Door Handle

SIZE 900 x 2300 5


5 38mm L Door Jam
38mm L Door Jam
Door Leaf In
FRAMING TYPE STEEL Door Leaf In

+2300 PANEL TYPE STEEL

nEsPRIMARYSCHOOL

DRAWING TITLE
PROJECT NAME
PANEL AREA 1.2 m2
2300

2280

TOTAL DOOR
1.92 m2
AREA

6
+0.00 QUANTITY 2
DRAWING NUMBER
6
900

38mm L Door Jam


865

Door Leaf Out


LOCATION Toilet Blocks
AR-02/02

A B C D E F G H
1
6

3
4

2
A B C A B C

10000 10600
7000 2600
800 7000 2800
A

A
3500 3500 700 1000 1000 1000 1000 1000 1000 1000 900 900 900

13 13

520
D1
640
WD1
3000

3000
680
640

WD1
520

12 12
520
640

WD1

CLASSROOM 1 Shelf
3000

3000
680

60 m2
640
B

B
WD1

FLOOR
520

11 11
520
640

WD1
3000

3000
680
640

WD1
520

10 10
520

D1
640

WD1
3000

3000
680
C

C
640

WD1
520

9 9
520
640

WD1

CLASSROOM 2 Shelf
3000

3000
680

60 m2
640

WD1
520

8 8
520
640

WD1
3000

3000
680
D

D
640

WD1
520
36200

36200

7 7
520

D1
640

WD1

A A A A
3000

680

3000
640

WD1
520

6 6
520
640

WD1
E

E
CLASSROOM 3
3000

3000
680

60 m2
640

WD1
Trawel finish
during casting
520

5 5
520
640

WD1
3000

3000
680
640

WD1
520

4 4
520

D1
640
F

F
WD1
3000

3000
680
640

WD1
520

3 3
520
640

WD1

CLASSROOM 4
3000

3000
680

60 m2
640

WD1
520

2 2
520

G
G

640

WD1
3000

3000
680
640

WD1
520

1 1

Ground Floor Plan @ +000 Roof Plan

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-01/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
FLOOR PLAN Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
6

3
4

2
A B C D E F G H

KEY PLAN

FLOOR

1 1
1 2 3 4 5 6 7 8 9 10 11 12 13

+4500

B C C B C B B C B FOR CONSTRUCTION PURPOSE ONLY


A A A

NOVEMBER 2022

LAWE BERHANU
+2500

DATE OF ISSUE

CHECKED BY
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
GRADE 5 GRADE 5 GRADE 5 GRADE 5
COLOR COLOR COLOR COLOR

FINAL DESIGN
BLUE YELLOW RED RED
Plasted and Painted Plasted and Painted Plasted and Painted Plasted and Painted

DESIGN STAGE
CHECKED BY
2 2

INDEX
+000

A
Front View

LAWE BERHANU PPAR-366, AEA, ACI


REVISION BY
ARCHITECTURAL DESIGN

DRAFTS PERSON TEAM:


DAWIT MELAKU

SERKALEM N.
DATE
NO
10 9 8 10 9 8 7 6 5 4 3 2 1

ADDIS ABEBA

AA000050904212
3

TITLE DEED NO
LOCATION

K/KETEMA

WOREDA
YEKA
D D E D D E E D D E D D

09
+2500

+700

CONSULTING ARCHITECTS & ENGINEERS


Plastered & Plastered & Plastered &
Painted Painted Painted +000

MINISTRY OF EDUCATION

EMAIL: Lawe.partners@gmail.com
Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968
LAWE BERHANU
Rear Elevation 4

CONSULTANT
4

EMPLOYER
A B C
200
7000 2600
+4500
A B C
EGA 500 Roof
50x70mm RHS Purlin
+4500
No Ceiling
+3440

1720
1020

440
440

240
220
200

4500

ELEVATIONS AND SECTIONS


5 Plasted and Painted
3440

1600

Plastered &

2500
Painted Ceramic Window Sill Plastic Sheet
Moisture Separator

+000
700

nEsPRIMARYSCHOOL
2% 2%

DRAWING TITLE
PROJECT NAME
+000

2% 2%

compacted selected
materials

Side Elevation Section A-A


DRAWING NUMBER
6 6
AR-02/04

A B C D E F G H
1
6

2
4
W1 DESCRIPTION W2 DESCRIPTION
A

A
SIZE 600 x 1600 SIZE 400 x 400

FRAMING TYPE Steel FRAMING TYPE Steel

600 5mm thick clear glass Louvered glass 5mm


GLAZING TYPE 400 GLAZING TYPE
+2300
400

20x20x1mm
20x20x1mm
RHS flashing
GLAZING AREA 0.34 m2 RHS flashing
GLAZING AREA 0.14m2

400

400
5mm clear glass 5mm clear glass
1600

TOTAL WINDOW 0.96 m2 TOTAL WINDOW 0.15m2


AREA AREA
+1000
B

B
FLOOR
600 QUANTITY 24 QUANTITY 36

LOCATION Class Room Unit LOCATION Class Room Unit

D1 DESCRIPTION
Shelf

Door Handle

SIZE 1000 x 2300


38mm L Door Jam

150
C

C
STEEL

40
FRAMING TYPE
200x280x40mm
900
40 40
820
+2300
STEEL 150 Solid Wood Panel
38mm
L Door Jam
38mm
40x40x2mm RHS PANEL TYPE 40x40 angle
@ 800mm H

150
L Door Jam
Door Frame Iron support
340

40x40x3mm Angle Iron


Frame

15x15x1mm
Angle Flashing

15x15x1mm
Angle Flashing PANEL AREA 1.4 m2 150

40x40 angle
2300

150
Iron support
1570

Door
2250

Handle
200

TOTAL DOOR
100

2.3 m2
Out AREA 150
1000

40
In
40

50

+0.00
340

50

25x25x2mm RHS
315

Louver
50
40 50

4
40x40x2mm RHS

1000
Door Frame
QUANTITY

38mm L Door Jam Door Leaf Out LOCATION Class Room Block
D

D
W3
DESCRIPTION
E

E
SIZE 220 x 220

FRAMING TYPE Steel

Louvered glass 5mm


220

GLAZING TYPE
220

20x20x1mm
RHS flashing
0.03 m2
220

220

5mm clear glass GLAZING AREA

TOTAL WINDOW 0.05 m2


AREA
F

F
QUANTITY 36

LOCATION Class Room Unit


G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-03/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
FLOOR PLAN Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A

A
Window Detail - Front

5 6 9 10 8 9
4
1
A 5
2
7
2
B 8
3
6
3
C 7
4
B

B
1180 440 1180 440 420 420 440

FLOOR
420 240 240 420
440

440

440
240

240
420

1180 440 1180


440 240 420
1100

1100

1100

1100

1100
240
440

440

440
420
1180 1180
440
240

240

240
2800 2800 2800

Window
220x220mm
Window Window Window Window Window
400x400mm 220x220mm 400x400mm 220x220mm 400x400mm

Type A Wall Opening Type B Wall Opening Type C Wall Opening


C

C
Window Detail - Rear
D

D
3 2
5 4 2 1
6
9
D 5
8
4
7
E 3
6
10 9 8 7
240

240

420 240 520 440 520 240 420 240 520 440 2380 520 240 420
440

440
240

240
660

660
220

220

220

220

2780 2780

400x400mm Window Window 400x400mm Window


E

E
220x220mm 400x400mm 220x220mm
Window
400x400mm

Type D Type E
Wall Opening Wall Opening
F

F
G
G

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-04/04
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
TITLE DEED NO DRAFTS PERSON TEAM:
FLOOR PLAN Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968 AA000050904212
SERKALEM N.
INDEX
LAWE BERHANU
A
EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1
6

2
4
A

A
A B C
B

B
10000

7000 2800

10

a
3000

a a a
9
C

C
CLASSROOM 1
3000

60 m2

b b b
8
3000
D

D
7

A A
a
3000

a a a
6

CLASSROOM 2
27200

3000
E

E
60 m2

Trawel finish
during casting
b b b
5
3000

4
F

F
a
3000

a a a
3

CLASSROOM 3
3000

60 m2

b b b
2
G
G

3000

CLASSROOM BLOCK 1&2


GROUND FLOOR
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-01/02

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
ELECTRICAL PLANS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
7000 2800

13

3000 a
A

A
b

a a a
12

CLASSROOM 1
3000

60 m2

b b b
11
B

B
3000

7000 2800

10

a
3000

a a a
C

C
9

CLASSROOM 2
3000

60 m2

b b b
8
3000
D

D
A B C

7000
36200

7
4400 2600

3
A Jan a
a
3000

b Girls
Clean WD3
3000

Disabled
a a a
6 WD2

a a
6000

2 WD1
E

E
CLASSROOM 3
3000

60 m2
3000

Trawel finish WD2 WD2 WD2


during casting
b b b
5

GIRLS TOILET
3000

A B C
7400
4 7000
F

F
200 4400 2600 200
100

a 3
Jan
3000

a
b
Urinal WD3
3000

a a a Disabled
3
WD2

a a
6200

2
CLASSROOM 4
3000

60 m2
G
G

3000

WD2 WD2 WD2


b b b
2

1
100
3000

BOYS TOILET

CLASSROOM Block 3 GROUND LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-02/02

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
ELECTRICAL PLANS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1
6

2
4
A

A
A B C
A B C
B

B
10000

10000 7000 2800

7000 2800
10
10

Finance /2 HR a d

3000
a 12 m
3000

b
a

9
a a a
9
C

C
Deputy
2
b

3000
12 m d
CLASSROOM 1
3000

60 m2
b

8
b b b
8 c
c

Principal
3000

2
20 m
3000

7
D

D
7

A a A
3000

A A b
a
3000

b
Staff2
62
a
m
a a
a 6 Trowel finish
a a
6 during casting
27200

3000

CLASSROOM 2
27200

3000

60 m2
E

E
Trawel finish
during casting b b b
5
b b b
5
3000
3000

4
4

Department
2
40 m a
F

F
3000

a FF=Troweled
3000

During Casting
b

a a a
3
a a a
3
3000

CLASSROOM 3
3000

60 m2

2
b b b c
2
G
G

c
3000

Record
3000

2
20 m

1
1
ADMINISTRATION
CLASSROOM BLOCK 1&2 GROUND FLOOR
GROUND FLOOR
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-01/04

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
ELECTRICAL PLANS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A

A
A B C
A B C
B

B
10000 10000
4700 4700
7000 2800 400
600 4700 4200 600

10 1

a
3000

3000
b

a a a
COMMUNITY HALL
9 a a a
STEM Center
2
2 170 m2

61 m a
C

C
Trowel finish
during casting

FF=Troweled During
3000

3000
Casting

b b
b b b b b b a a
8 3
3000

3000
18200
D

D
7 a a a
4

A a A A A
3000

3000

a a a b b b
6 5
27200

3000

3000
E

E
b b b a a a
5 6

General Science
2
124 m
3000

3000

FF=Troweled During
Casting

4 7

COMMUNITY HALL
GROUND FLOOR
F

F
a
3000

a a a
3
3000

b b b
2
G
G

3000

GENERAL SCIENCE & STEM CENTER


GROUND FLOOR
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-02/04

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
ELECTRICAL PLANS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
1
6

2
4
A

A
A B C
B

B
10000

7000 2800
A B C
10
10000

7000 2600
3000

b b b

3000
9
C

C
a a a a
3000

2
a

a a a
8 3000
Lobby
D1
IT Center
2 b b
bb
102 m b b b b aa
3000

FF=Troweled During a a 3
Casting

b b b LIBRARY Reception
D

D
3000

7 170 m2
Troweled
During Casting
18200

A
a a a a
3000

a a a
3000

b b b b
27200

3000

5
E

E
3000

5
D1

b
a a a a
3000

a 6

b b b
3000

4
Language
Center
2
62.3 m
F

F
FF=Troweled During
3000

7
Casting
LIBRARY GROUND FLOOR
a a a
3
3000

2
G
G

c
First aid
2
20 m c
3000

1
IT LANGUAGE CENTER
,

FIRST AID GROUND FLOOR


LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-03/04

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
ELECTRICAL PLANS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
6

2
4
1
6

2
4
A

A
A B C
B

B
A B C
10000 7400
7100
7000 2800 400
1500 3200 2300

200
2
c
EL c c

1100
Board
b
D2
3000

a
c Office

3200

2800

3000
Rest
Room Area=8m2
c

1700
c
b b b
6

200
1
C

C
GUARD HOUSE
GROUND FLOOR
3000

Special-need class
60 m2
Trowel finish
during casting
a a a
5
3000
D

D
4

A B C

Therapeutic | Playroom 7000


18000

3000

40 m2 a 4400 2600

3
Jan a
a a a
3 Girls
Clean WD3
3000

Disabled
A A
3000

WD2
E

E
a a
6000

2 WD1

b b
3000

WD2 WD2 WD2

Counseling
3000

20 m2

GIRLS TOILET
1

THERAPEUTIC CENTER
F

F
SPECIAL NEED GROUND FLOOR A
7400
B C

7000
200 4400 2600 200
100

3
Jan a

Urinal WD3
3000

Disabled
WD2

a a
6200

2
G
G

3000

WD2 WD2 WD2

1
100

BOYS TOILET

LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY

ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-04/04

K/KETEMA
DRAWING NUMBER

YEKA
H

NO DATE REVISION BY CHECKED BY


CONSULTANT
WOREDA ARCHITECTURAL DESIGN DESIGN STAGE DATE OF ISSUE
LAWE BERHANU 09 LAWE BERHANU PPAR-366, AEA, ACI FINAL DESIGN NOVEMBER 2022
DRAWING TITLE DAWIT MELAKU
CONSULTING ARCHITECTS & ENGINEERS CHECKED BY
ELECTRICAL PLANS Gurdshola, derar Mall, 2nd Floor TITLE DEED NO DRAFTS PERSON TEAM: INDEX
TEL: 0911419968 AA000050904212 LAWE BERHANU
SERKALEM N. A
EMAIL: Lawe.partners@gmail.com
1
5
6

2
4
A B C D E F G H

KEY PLAN

A B C A B C
- THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
ARCHITECTS AND ENGINEERS DRAWINGS AND SPECIFICATIONS.
- PIPES SHOULD BE LAID AS PER THE FOLLOWING SLOPE
1 Provide a minimum of 2.0% slope for Ø50 horizontal drainage pipes. 1
Ø25 Ø25 Ø25 Provide a minimum of 2.0% slope for Ø75 horizontal drainage pipes.
Provide a minimum of 1.5% slope for Ø110 horizontal drainage pipes.
3 3
Provide a minimum of 1.2% slope for Ø150 horizontal drainage pipes.
Jan Jan
- ALL PIPE DIAMETERS ARE IN MILLIMETERS UNLESS OTHERWISE

Girls Ø25 - ALL WATER SUPPLY PIPE DIAMETERS GIVEN ARE NOMINAL (INTERNAL )
Clean Urinal FOR CONSTRUCTION PURPOSE ONLY
Ø25 Ø25 DIAMETER. ALL COLD & HOT WATER PIPES ARE RUNNING AT ABOVE
FALSE CEILING.

NOVEMBER 2022

LAWE BERHANU
DATE OF ISSUE
- ALL uPVC WASTE WATER PIPES SHOULD NOT BE HEATED FOR

CHECKED BY
Ø25 CONNECTION. ALL PIPING CONNECTION SHOULD BE MADE WITH
Ø25 Ø25 Ø25 APPROVED FITTINGS.

THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
Ø32 From EWT Ø32 From EWT
Ø32 Ø32 Ø32 Ø32 LEGEND

FINAL DESIGN
DESIGN STAGE
Ø25 Ø25

CHECKED BY
2 2 PPR Pipe for Cold Water
2 - 2

INDEX
Ø25 Ø25 Supply for Internal use, PN-20

A
Ø25 Ø25 - PPR Pipe for Hot Water
Supply for Internal use, PN-20

LAWE BERHANU PPAR-366, AEA, ACI


-

REVISION BY
Gate Valve
- One Way Valve

ARCHITECTURAL DESIGN
- uPVC waste pipe, PN-6

DRAFTS PERSON TEAM:


uPVC Vent Pipe, PN-6

DAWIT MELAKU
-

SERKALEM N.
DATE
H.W. - Hand wash basin
1 1 W.C. - Low flush water closet

NO
K.S. - Kitchen sink
GIRLS TOILET GROUND FLOOR WATER SUPPLY INSTALLATION BOYS TOILET GROUND FLOOR WATER SUPPLY INSTALLATION SH. - Shower
B.T. - Bath Tub
3

ADDIS ABEBA

AA000050904212
SCALE 1:50 SCALE 1:50
3

TITLE DEED NO
F.D. - Floor drain

LOCATION

K/KETEMA

WOREDA
M.H. - Manhole

YEKA
Down Pipe

09
D/P -
CP. - Concrete Pipe
EWT - Elevated water tank
A B C GSNden tap
G.T -
H/L - Higher level

CONSULTING ARCHITECTS & ENGINEERS


L/L - Lower level
T/A - To above

MINISTRY OF EDUCATION

EMAIL: Lawe.partners@gmail.com
F/B - From below

Gurdshola, derar Mall, 2nd Floor


Ø75 D/P T/B
3 F/A From above

TEL: 0911419968
-

LAWE BERHANU
T/A - To below 4

CONSULTANT
FCO - Floor clean out
4

EMPLOYER
CO - Clean out
F.G. - Floor Gulley
LAN. - Laundry
Ø32 From Source
W1 - Water Supply Riser

S1 - Waste Water Riser


- Flow Direction

COMMON TOILET-WATER SUPPLY


5m3 capacity Fiber Glass
5
5 Equivalet Column Seported EWT
at level +6.00m From Roof

INSTALLATION
nEsPRIMARYSCHOOL

DRAWING TITLE
PROJECT NAME
1 Ø75 D/P T/B

6
ROOF FLOOR WASTE WATER INSTALLATION DRAWING NUMBER
6
SCALE 1:50
SN-01/02

A B C D E F G H
A B C D E F G H
12000 KEY PLAN
EFFECTIVE VOLUME 70m3 SEPTIC TANK 150 250 700 Ø12/150 9100 Ø12/150 700 950 150

150
B
12000
3000 200 4400 200 3800 200 - THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT

200

200
ARCHITECTS AND ENGINEERS DRAWINGS AND SPECIFICATIONS.
- PIPES SHOULD BE LAID AS PER THE FOLLOWING SLOPE

2700
700 Provide a minimum of 2.0% slope for Ø50 horizontal drainage pipes.
1 1490 700 1010 Ø150 PN-6 700 1010 Ø150 PN-6
A 1

4300
4000
uPVC pipe uPVC pipe

2300
Provide a minimum of 2.0% slope for Ø75 horizontal drainage pipes.
2700
2300

A 2300 600 600 600

700

700
700
Ø8/200 Ø8/200 Provide a minimum of 1.5% slope for Ø110 horizontal drainage pipes.
450 Provide a minimum of 1.2% slope for Ø150 horizontal drainage pipes.
Ø200 uPVC pipe, PN-6
from MH Ø12/200
Ø12/200 - ALL PIPE DIAMETERS ARE IN MILLIMETERS UNLESS OTHERWISE

200
200

Ø10/200 - ALL WATER SUPPLY PIPE DIAMETERS GIVEN ARE NOMINAL (INTERNAL )
SECTIONAL PLAN OF SEPTIC TANK

150
B
DIAMETER. ALL COLD & HOT WATER PIPES ARE RUNNING AT ABOVE FOR CONSTRUCTION PURPOSE ONLY
STRUCTURAL SECTION FALSE CEILING.

NOVEMBER 2022

LAWE BERHANU
12000 - ALL uPVC WASTE WATER PIPES SHOULD NOT BE HEATED FOR

DATE OF ISSUE

CHECKED BY
1490 700 2500 700 5950 Ø12/150 700 650 CONNECTION. ALL PIPING CONNECTION SHOULD BE MADE WITH
APPROVED FITTINGS.
12000

THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
1490 700 2500 700 5262 700 650 DETAIL A

1200
700
3000 200 3000 200 5200
200
Ø200 PN-4
a

LEGEND

100

FINAL DESIGN
Ø150 PN-6 Ø150 PN-6 uPVC pipe a

DESIGN STAGE
700
uPVC pipe uPVC pipe

CHECKED BY
2

300
5 2
PPR Pipe for Cold Water

200
-

.
1

.
5 SECTION 2-2

.
4 4 4 6

700
7 2 2 d

2 700 700 2

.
2700

2700
4300

.
Supply for Internal use, PN-20

75

INDEX
Ø200 uPVC pipe, PN-6 3

A
.

150
400

.
.
from MH

4
.
2900

50 50
- PPR Pipe for Hot Water

.
2700
1

75
c
5

.
2400
b
b Ø10/200 L=300

.
2100

2100

.
Supply for Internal use, PN-20

20
.
5 d 280
a 4Ø10/200 L=600
20cm thick 20cm thick 600
c Ø10/200 L=300

50

20
HCB wall HCB wall 280
- Gate Valve

LAWE BERHANU PPAR-366, AEA, ACI


REVISION BY
Ø10/200 TOP SLAB REINFORCEMENT
- One Way Valve

200
- uPVC waste pipe, PN-6

ARCHITECTURAL DESIGN
5cm thick SECTIONAL A-A

DRAFTS PERSON TEAM:


Lean Concrete 3900 1 Ø12/150 L=1984 - uPVC Vent Pipe, PN-6

120
3900

DAWIT MELAKU

SERKALEM N.
120
H.W. - Hand wash basin

DATE
5900
400 5900 W.C. - Low flush water closet

NO
12000
3000
2 Ø12/150 L=11340
3000
F.D. - Floor drain
3 Ø12/150 L=3230 M.H. - Manhole

120

120

120

120
100 D/P - Down Pipe 3

ADDIS ABEBA

AA000050904212
5110
3 1395

TITLE DEED NO
Ø10/200 # CP. - Concrete Pipe

LOCATION

K/KETEMA

WOREDA
760 760 Elevated water tank

YEKA
900 560 830 830 EWT -

120

120
2700

120

120
120

120

120

120

09
G.T - Garden tap
2260 2390
C pipe, PN-6
H/L - Higher level
4 Ø12/150 L=4020 5 Ø12/150 L=2240 6 Ø12/150 L=1560 7 Ø12/150 L=4290
L/L - Lower level
T/A - To above
BOTTOM SLAB REINFORCEMENT
F/B - From below

CONSULTING ARCHITECTS & ENGINEERS


F/A - From above

MINISTRY OF EDUCATION
T/A - To below

EMAIL: Lawe.partners@gmail.com
A B C A B C FCO - Floor clean out

Gurdshola, derar Mall, 2nd Floor


TEL: 0911419968
CO - Clean out

LAWE BERHANU
Ø75 Ø75 Ø75
F.G. - Floor Gulley 4

CONSULTANT
3 3
4 W1 - Water Supply Riser

EMPLOYER
Jan Jan

Girls Ø75
Clean Urinal S1 - Waste Water Riser
Typical Manhole section Ø75

25cm Brick wall Ø10/ 200


- Flow Direction
NGL NGL Ø50 Ø50
180

FD
Ø50 FD
Ø50

Ø75 Ø75
2 Ø110 Ø110 Ø110 2 Ø110 Ø110 Ø110
1000
500

25cm Double Brick wall


FD FD

Ø50 Ø50
D

Ø110 From Fixtures Ø110 Ø110 Ø110 Ø110


50

25cm Brick wall

1300
10

Screed C-10 Ø8/ 200


Ø75 from Building 10cm thich RC Slab
Ø110 Ø110

COMMON TOILET-WASTE WATER


Ø200 to Black water
Pipe Grey water drain
25 40 10 30 25
D= Depth at the start
D= 40cm, Slope=1.5%
1 1 5
130
MH MH
5
Ø160 Ø160

12000

INSTALLATION
Ø160 Ø160

nEsPRIMARYSCHOOL

DRAWING TITLE
PROJECT NAME
2700

MH SEPTIC TANK MH
Ø200 Ø200

25cm Double Brick wall (see details)

GIRLS TOILET GROUND FLOOR WASTE WATER INSTALLATION BOYS TOILET GROUND FLOOR WASTE WATER INSTALLATION
SCALE 1:50 SCALE 1:50
DRAWING NUMBER
6 6
SN-02/02

A B C D E F G H