KEY PLAN
90° 135°
VALUES GIVEN IN ( ) ARE FOR
b
1. GENERAL 5. CONCRETE CROSS TIE
MILD STEEL REINFORCEMENT FOR CONSTRUCTION PURPOSE ONLY
NOVEMBER 2022
LAWE BERHANU
1.1 ALL DIMENSIONS ARE IN mm. 5.1 UNLESS OTHERWISE SPECIFIED, ALL STRUCTURAL CONCRETE MIX TO BE OF GRADE C-25 135°
DATE OF ISSUE
DIMENSIONS ARE NOT TO BE SCALED FROM THE DRAWINGS. FOLLOW WRITTEN DIMENSIONS ONLY. 5.2 ALL CONCRETE STRENGTHS ARE 28 DAYS CUBE STRENGTH. 35° STIRRUPS & CROSS-TIES FOR COLUMNS, BEAM-COLUMN JOINTS,
CHECKED BY
STIRRUPS OR HOOP BEAM CONFINEMENT ZONES AND WALL END ZONES
1.2 ALL STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL 5.3 UNLESS OTHERWISE SPECIFIED, A LAYER OF 50mm THICK GRADE C-5 CONCRETE TO BE PROVIDED BELOW ALL
DRAWINGS, SPECIFICATIONS, BILLS OF QUANTITIES AND ALL OTHER RELEVANT DOCUMENTS.
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
REINFORCED CONCRETE STRUCTURES IN CONTACT WITH THE GROUND.
DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ENGINEER PRIOR TO COMMENCEMENT OF
WORK. 5.4 UNLESS OTHERWISE SPECIFIED, ALL LEAN CONCRETE MIX TO BE OF GRADE C-5.
FINAL DESIGN
1.3 THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCEMENT OF 5.5 MAXIMUM AGGREGATE SIZE SHALL BE 20mm.
DESIGN STAGE
CHECKED BY
WORKS AND ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER BEFORE EXECUTION.
2
5.6 CURING OF CONCRETE 8. NOTATIONS 2
INDEX
1.4 ALL CONCRETE SIZES AND LEVELS ARE FOR STRUCTURAL ELEMENTS UNLESS OTHERWISE NOTED. · EXPOSED CONCRETE SURFACES SHOULD BE COVERED WITH DAMP ABSORBENT MATERIAL AFTER
A
PLACING CONCRETE. THEY SHOULD BE KEPT CONTINUOUSLY WET BY FREQUENT SPRAYING OF WATER. · EGL - EXISTING GROUND LEVEL
1.5 ALL OPENINGS FOR PIPING AND CONVEYANCE SHALL BE FORMED IN POSITION BEFORE THE CASTING OF · IN COLUMNS CURING SHOULD BE STARTED IMMEDIATELY AFTER REMOVAL OF FORMWORK.
CONCRETE. FOR LOCATION OF OPENINGS REQUIRED FOR M & E INSTALLATION REFER RELEVANT M & E · MINIMUM PERIOD OF CURING IS 7 DAYS.
· GFL - GROUND FLOOR LEVEL
DRAWINGS. · FFL - FINISHED FLOOR LEVEL
· B/W- BOTH WAYS
ARCHITECTURAL DESIGN
DAWIT MELAKU
SERKALEM N.
1.9 ELECTRICAL CONDUITS SHOULD NOT BE PROVIDED WITH IN THE COVER TO THE REINFORCEMENT OF SOFFIT FORMWORK TO SLABS 14 DAYS · T20-25-100T HIGH YIELD STEEL 20mm DIAMETER BAR MARK 25 AT 100mm
DATE
STRUCTURAL ELEMENTS. CENTERS ON TOP
SOFFIT FORMWORK TO BEAMS 14 DAYS
· B1 (200X400)
NO
PROPS TO BEAMS 21 DAYS
DEPTH OF BEAM
WIDTH OF BEAM
5.8 GRADE OF CONCRETE
2. FOUNDATIONS BEAM ID
3
ADDIS ABEBA
AA000050904212
3 CHARACTERISTIC
TITLE DEED NO
2.1 BOTTOM OF EXCAVATIONS FOR WALLS & COLUMN FOUNDATIONS SHALL BE COMPACTED PRIOR TO
CONCRETE CUBE/ CYLINDER
STRENGTH, N/mm²
LOCATION
K/KETEMA
WOREDA
LAYING OF LEVELING SCREED.
YEKA
BLINDING SCREED / LEVELING CONCRETE
C7, (C5) 5
09
2.2 FOUNDATIONS ARE DESIGNED FOR AN ALLOWABLE BEARING CAPACITY OF 200 kN/m²
BLINDING SCREED / LEVELING CONCRETE
C15, (C12) 20
2.3 FOUNDATIONS TO BE EXCAVATED TO THE DEPTHS AS MENTIONED IN THE DRAWING.
STRUCTURAL CONCRETE C25, (C20) 25
2.4 FOUNDATION EXCAVATION TO BE APPROVED BY THE ENGINEERS PRIOR TO THE CONSTRUCTION OF
FOUNDATIONS.
MINISTRY OF EDUCATION
AGAINST CONCRETE GETTING IN CONTACT WITH SOIL.
EMAIL: Lawe.partners@gmail.com
2.7 UNDER THE FOUNDATION SHALL BE COMPACT 20CM THICKNESS WELL GRADED SELECT MATERIAL
LAWE BERHANU
THROUGH WHICH THE OPENING IS FORMED.
2.8 UNDER THE FOUNDATION SHALL BE COVERED BY POLYTHENE PLASTIC SHEET. THE QUALITY OF 4
6.2 NO TRIMMER BARS ARE REQUIRED FOR OPENINGS NOT GREATER THAN 200mm WIDE , BUT NO REINFORCING
CONSULTANT
MATERIAL SHALL BE APPROVED BY ENGINEER.
4 BARS SHALL BE CUT. REINFORCING BARS SHALL BE ADJUSTED IN POSITION TO AVOID OPENINGS.
EMPLOYER
6.3 UNLESS OTHERWISE SHOWN IN THE DRAWINGS, TRIMMER BAR DETAILS FOR THE DIFFERENT SIZE
OPENINGS ARE AS SHOWN :
COLUMNS 50 mm 25 mm 5
1
5 0051
3.3 WELDING OF REINFORCEMENT WILL NOT BE PERMITTED WITHOUT THE APPROVAL OF THE ENGINEER. 45Ø
3.4 ALL BARS SHALL BE CUT AND BENT TO CONFORM TO BS4466.
UNLESS OTHERWISE STATED IN THE DRAWINGS, THE MINIMUM LAP LENGTH FOR REINFORCEMENT SHALL BE
50 TIMES THE DIA. OF SMALLER BAR IN THE LAP.
nEsPRIMARYSCHOOL
ALL BARS AT THE ENDS OF THE BEAMS WHERE THE BEAM IS NO MORE CONTINUOUS SHALL BE ANCHORED
EITHER STRAIGHT OR BENT (DEPENDING ON THE WIDTH OF THE SUPPORT). THESE SHALL
1-1
DRAWING TITLE
PROJECT NAME
NOT BE USED IN CANTILEVERED BEAMS OR SLABS. THE ACTUAL DESIGN DRAWING SHALL BE STRICTLY
ADHERE TO. 7.4 NOTES ON REPLACEMENT BARS :
a. NUMBER OF TRIMMER BARS SHALL NOT BE LESS THAN THE NUMBERS OF BARS CUT BY OPENING.
b. MINIMUM 2 NOS EACH AND BAR DIAMETER (T) SHALL BE EQUAL TO THE GREATEST DIAMETER OF THE
BARS CUT BY THE OPENING BUT NOT LESS THAN 2T12 TOP & BOTTOM.
c. BOTH PERPENDICULAR AND DIAGONAL TRIMMING BARS SHALL BE PROVIDED AS SHOWN ABOVE AND ON
EACH FACE OF THE MEMBER.. DRAWING NUMBER
6 6
ST-01/06
A B C D E F G H
1
6
2
4
A' A B C C'
550
EGA 500 Roof
Ø8 c/c 200 L=11400
13
90 90 A RHS Purlin 50x70mm RHS Purlin B EGA 500 C
70mm x 50mm Top Tie Beam 200x400mm
A
A
1000
+4.50m
No Ceiling
965
965
965
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520 965
2800
2467 874 870 650 965
3000
90
90
Ø8 c/c 175 L=10080 965
965
1000
1000
C-1 C-2 C-3
+2.50m +2.50m
12
200
1000
1000
3798
Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
Ø8 c/c 200 L=9671
3138
Ø8 c/c 175 L=9340
90
90
Ø8 c/c 175 L=10080
3000
2800
9250
9250
9900
9250
Polythene Plastic Sheet
1000
1000
Ø8 c/c 200 +0.00m Ø8 c/c 175 Ø8 c/c 200
In Both Side In Both Side In Both Side
C-1 C-2 C-3 2% 2%
In Both Side
11
200
VAR.
B
VAR.
B
1000
1000
300
300
300
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
2467 874 870 650 750 750
750
1150 2270
150mm C-20/25 Reinforced concrete
(Trowel Floor Finish During Casting Time) Approved select material Compacted Approved Well Compacted Earth Soil
3000
2800
90
Ø8 c/c 175 L=10080 Polythene Plastic Sheet Under The Foundation
9900 material to 95% MDD in Layers n.e to 95% MDD in Layers n.e 200mm
500mm Selected Compact soil
500mm Well Compacted Earth Soil
Ø8 c/c 175 L=2000
400
400
10
1000
1000
2800
90
90
Ø8 c/c 175 L=10080
9900
1000
C
C
1000
Ø8 c/c 200 L=9400
9400
9400
90
90
1000
1000
Ø8 c/c 200
In Both Side
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
2467 874 870 650
1150 2270
2800
3000
90
90
7
200
400
400
1000
D
1000
D
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
2467 874 870 650
1150 2270
2778
3000
90
90
2800
9400
90
90
5
200
1000
1000
E
E
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520 300
2467 874 870 650
1150 2270
3000
2800
90
90
750
400
400
400
200
1000
1000
2%
90
90
874
C-1 C-2
Ø8 c/c 250 L=9750
3
200
1000
1000
F
F
Ø8 c/c 175 L=9340
9250
2800
3000
90
90
1000
1000
2800
90
90
1000
1 90 90
550
550
1'
G
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-02/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
H G F E D C B A
ST-03/06
6 6
DRAWING NUMBER
1
36000
3
5
8
9
2
4
10
11
12
13
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
200 200 200 200 222 200 200 200 200 200 200 200
2800 2800 2800 2800 2800 2778 2800 2800 2800 2800 2800 2800
200
PROJECT NAME
DRAWING TITLE
GB-2
400
nEsPRIMARYSCHOOL
A
BEAM DETAIL
5
5
7000
6600
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
10000
400
EMPLOYER
4
CONSULTANT
2600
2200
4
LAWE BERHANU
TEL: 0911419968
Gurdshola, derar Mall, 2nd Floor
GB-2
400
C
EMAIL: Lawe.partners@gmail.com
MINISTRY OF EDUCATION
09
YEKA
WOREDA
K/KETEMA
LOCATION
TITLE DEED NO
3
AA000050904212
ADDIS ABEBA
3 GB-1 BEAMS ON AXIS 1 ~ 10 (250X400mm) (10pcs)
A B C
7000 2600
NO
2117 2267 2117 2100
1 1 4Ø14 3Ø14
DATE
1 1
50
SERKALEM N.
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150
DAWIT MELAKU
ST-1 ST-1
400
400
9900
300
300
300
300
4Ø14 L=10500
4Ø14 3Ø14 150
9900
REVISION BY
A
INDEX
2 2
GB-2 BEAMS ON AXIS A,B & C (250X400mm) (3pcs) Ø8 c/c 200 L=1050
CHECKED BY
DESIGN STAGE
FINAL DESIGN
1 2 3 4 5 6 7 8 9 10 11 12 13
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
2 2 2 2 2 2 2 2 2 2 2 2
CHECKED BY
DATE OF ISSUE
2 2 2 2 2 2 2 2 2 2 2 2
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150
LAWE BERHANU
NOVEMBER 2022
700
700
FOR CONSTRUCTION PURPOSE ONLY
3Ø14 L=9700 3Ø14 L=9700
9400 3Ø14 L=9700 3Ø14 L=9700
9400
300
300
300
700 700 700
300
1 1
KEY PLAN
H G F E D C B A
1
6
2
4
150 150
13
A B C
st Ø8 c/c 150
A
A
3000
2700
2
2
13
200
12
3000
2800
150
350
st Ø8 c/c 150
3Ø14 L=9550
3000
2700
2
9222
12
200
50
ST-1
3Ø14 L=11050
10900
3000
2800
11
B
B
200
11
st Ø8 c/c 150
3000
2700
2
2
3Ø14
3Ø14
SECTION 2-2
ST-1
2800
3000
700
10
400
10
200
200
st Ø8 c/c 150
700
2700
3000
2
3000
2800
C
C
9
200
3Ø14 L=9878
st Ø8 c/c 150
3000
2700
2
2
3000
2800
3Ø14 L=9878
8
8
200
st Ø8 c/c 150
3000
2700
2
2
2800
3000
D
D
36000
7
200
700
7
BM-1
BM-1
2778
3000
st Ø8 c/c 150
3000
2700
700
2
2
222
6
2800
3000
3Ø14 L=9700
3Ø14 L=6700
st Ø8 c/c 150
E
E
3000
2700
2
5
200
5
3000
2800
st Ø8 c/c 150
2700
3000
700
2
4
200
700
4
3000
2800
F
F
BM-1 BEAMS ON AXIS A & C (600X200mm) (3pcs)
st Ø8 c/c 150
3000
2700
2
2
200
3
2800
3000
3Ø14 L=11050
10900
2
200
st Ø8 c/c 150
3Ø14 L=9550
3000
2700
2
9400
3000
2800
G
G
2
200
1
st Ø8 c/c 150
3000
2700
2
150 150
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-04/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A B C
TTB-1
13
200
350 350
A
A
C
2800
3000
TTB-1
0
200
12
st Ø8 c/c 15
2111
2613
1
1
TTB-1 BEAMS ON AXIS 1~10 (200X400mm) (10pcs)
2800
3000
TTB-1
200
11
B
B
B
2800
3000
0
TTB-1
st Ø8 c/c 15
2345
10
200
2800
3000
8
4Ø14 L=1132
4Ø14 L=1132
TTB-1
10628
10628
9
200
C
C
2800
3000
1
0
1
st Ø8 c/c 20
2345
7035
TTB-1
8
200
2800
3000
TTB-1
D
D
36200
7
200
0
st Ø8 c/c 15
2093
2800
3000
TTB-1
200
0
st Ø8 c/c 15
A
2800
3000
802
452
E
5
200
2800
3000
TTB-1
4
200
345
2800
3000
150
50
ST-1
TTB-1
F
F
3
200
2800
3000
SECTION 1-1
4Ø14
4Ø14
ST-1
TTB-1
200
2
200
2800
3000
400
G
TTB-1
G
200
1
400 6600 400 2200 400
7000 2600
10000
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-05/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
A B C
+4.48m
280
B
B
+4.20m
871
+3.54m
829
+2.50m
C
C
2500
+0.00m
-0.40m
7000 2600
D
D
+4.48m
300 300
+4.20m
300 300
1 1
+3.54m +3.54m
300 300
1 1
1 1
E
E
+2.50m +2.50m
St Ø8 c/c 200
200x400
St Ø8 c/c 200
3Ø14 L=5641
3Ø14 L=5609
3Ø14 L=5330
200x400
3Ø14 L=5340
4789
5021
4540
4510
3Ø14 L=4680
3Ø14 L=4650
St Ø8 c/c 200
200x400
3880
3850
1 1
1 1 1 1
F
F
+0.00m +0.00m +0.00m
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-06/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
A B C D E F G H
KEY PLAN
90° 135°
VALUES GIVEN IN ( ) ARE FOR
b
1. GENERAL 5. CONCRETE CROSS TIE
MILD STEEL REINFORCEMENT
FOR CONSTRUCTION PURPOSE ONLY
1.1 ALL DIMENSIONS ARE IN mm. 5.1 UNLESS OTHERWISE SPECIFIED, ALL STRUCTURAL CONCRETE MIX TO BE OF GRADE C-25 135°
NOVEMBER 2022
LAWE BERHANU
DIMENSIONS ARE NOT TO BE SCALED FROM THE DRAWINGS. FOLLOW WRITTEN DIMENSIONS ONLY. 5.2 ALL CONCRETE STRENGTHS ARE 28 DAYS CUBE STRENGTH. 35° STIRRUPS & CROSS-TIES FOR COLUMNS, BEAM-COLUMN JOINTS,
DATE OF ISSUE
STIRRUPS OR HOOP BEAM CONFINEMENT ZONES AND WALL END ZONES
CHECKED BY
1.2 ALL STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE RELEVANT ARCHITECTURAL 5.3 UNLESS OTHERWISE SPECIFIED, A LAYER OF 50mm THICK GRADE C-5 CONCRETE TO BE PROVIDED BELOW ALL
DRAWINGS, SPECIFICATIONS, BILLS OF QUANTITIES AND ALL OTHER RELEVANT DOCUMENTS. REINFORCED CONCRETE STRUCTURES IN CONTACT WITH THE GROUND.
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ENGINEER PRIOR TO COMMENCEMENT OF
WORK. 5.4 UNLESS OTHERWISE SPECIFIED, ALL LEAN CONCRETE MIX TO BE OF GRADE C-5.
1.3 THE CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCEMENT OF 5.5 MAXIMUM AGGREGATE SIZE SHALL BE 20mm.
FINAL DESIGN
WORKS AND ANY DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER BEFORE EXECUTION.
DESIGN STAGE
8. NOTATIONS
CHECKED BY
5.6 CURING OF CONCRETE
1.4 ALL CONCRETE SIZES AND LEVELS ARE FOR STRUCTURAL ELEMENTS UNLESS OTHERWISE NOTED. · EXPOSED CONCRETE SURFACES SHOULD BE COVERED WITH DAMP ABSORBENT MATERIAL AFTER
2 2
INDEX
PLACING CONCRETE. THEY SHOULD BE KEPT CONTINUOUSLY WET BY FREQUENT SPRAYING OF WATER. · EGL - EXISTING GROUND LEVEL
A
1.5 ALL OPENINGS FOR PIPING AND CONVEYANCE SHALL BE FORMED IN POSITION BEFORE THE CASTING OF · IN COLUMNS CURING SHOULD BE STARTED IMMEDIATELY AFTER REMOVAL OF FORMWORK.
CONCRETE. FOR LOCATION OF OPENINGS REQUIRED FOR M & E INSTALLATION REFER RELEVANT M & E · MINIMUM PERIOD OF CURING IS 7 DAYS.
· GFL - GROUND FLOOR LEVEL
DRAWINGS. · FFL - FINISHED FLOOR LEVEL
1.6 NO HOLES OR CHASES ARE PERMITTED IN THE CONCRETE MEMBERS UNLESS OTHER THAN AS DETAILED OR · B/W- BOTH WAYS
5.7 REMOVAL OF SHUTTERING :
ARCHITECTURAL DESIGN
DAWIT MELAKU
1.9 ELECTRICAL CONDUITS SHOULD NOT BE PROVIDED WITH IN THE COVER TO THE REINFORCEMENT OF SOFFIT FORMWORK TO SLABS 14 DAYS · T20-25-100T HIGH YIELD STEEL 20mm DIAMETER BAR MARK 25 AT 100mm
SERKALEM N.
DATE
STRUCTURAL ELEMENTS. CENTERS ON TOP
SOFFIT FORMWORK TO BEAMS 14 DAYS
· B1 (200X400)
NO
PROPS TO BEAMS 21 DAYS
DEPTH OF BEAM
WIDTH OF BEAM
5.8 GRADE OF CONCRETE
2. FOUNDATIONS BEAM ID
CHARACTERISTIC 3
ADDIS ABEBA
AA000050904212
CONCRETE CUBE/ CYLINDER
3
TITLE DEED NO
2.1 BOTTOM OF EXCAVATIONS FOR WALLS & COLUMN FOUNDATIONS SHALL BE COMPACTED PRIOR TO STRENGTH, N/mm²
LAYING OF LEVELING SCREED.
LOCATION
K/KETEMA
WOREDA
BLINDING SCREED / LEVELING CONCRETE C7, (C5) 5
YEKA
2.2 FOUNDATIONS ARE DESIGNED FOR AN ALLOWABLE BEARING CAPACITY OF 200 kN/m²
09
BLINDING SCREED / LEVELING CONCRETE C15, (C12) 20
2.3 FOUNDATIONS TO BE EXCAVATED TO THE DEPTHS AS MENTIONED IN THE DRAWING.
STRUCTURAL CONCRETE C25, (C20) 25
2.4 FOUNDATION EXCAVATION TO BE APPROVED BY THE ENGINEERS PRIOR TO THE CONSTRUCTION OF
FOUNDATIONS.
MINISTRY OF EDUCATION
EMAIL: Lawe.partners@gmail.com
2.7 UNDER THE FOUNDATION SHALL BE COMPACT 20CM THICKNESS WELL GRADED SELECT MATERIAL
TEL: 0911419968
THROUGH WHICH THE OPENING IS FORMED.
LAWE BERHANU
2.8 UNDER THE FOUNDATION SHALL BE COVERED BY POLYTHENE PLASTIC SHEET. THE QUALITY OF
MATERIAL SHALL BE APPROVED BY ENGINEER.
6.2 NO TRIMMER BARS ARE REQUIRED FOR OPENINGS NOT GREATER THAN 200mm WIDE , BUT NO REINFORCING 4
BARS SHALL BE CUT. REINFORCING BARS SHALL BE ADJUSTED IN POSITION TO AVOID OPENINGS.
CONSULTANT
4
EMPLOYER
6.3 UNLESS OTHERWISE SHOWN IN THE DRAWINGS, TRIMMER BAR DETAILS FOR THE DIFFERENT SIZE
OPENINGS ARE AS SHOWN :
COLUMNS 50 mm 25 mm 5
1
0051
5
3.3 WELDING OF REINFORCEMENT WILL NOT BE PERMITTED WITHOUT THE APPROVAL OF THE ENGINEER. 45Ø
3.4 ALL BARS SHALL BE CUT AND BENT TO CONFORM TO BS4466.
UNLESS OTHERWISE STATED IN THE DRAWINGS, THE MINIMUM LAP LENGTH FOR REINFORCEMENT SHALL BE
50 TIMES THE DIA. OF SMALLER BAR IN THE LAP.
ALL BARS AT THE ENDS OF THE BEAMS WHERE THE BEAM IS NO MORE CONTINUOUS SHALL BE ANCHORED 1-1
nEsPRIMARYSCHOOL
EITHER STRAIGHT OR BENT (DEPENDING ON THE WIDTH OF THE SUPPORT). THESE SHALL
NOT BE USED IN CANTILEVERED BEAMS OR SLABS. THE ACTUAL DESIGN DRAWING SHALL BE STRICTLY
DRAWING TITLE
PROJECT NAME
ADHERE TO. 7.4 NOTES ON REPLACEMENT BARS :
a. NUMBER OF TRIMMER BARS SHALL NOT BE LESS THAN THE NUMBERS OF BARS CUT BY OPENING.
b. MINIMUM 2 NOS EACH AND BAR DIAMETER (T) SHALL BE EQUAL TO THE GREATEST DIAMETER OF THE
BARS CUT BY THE OPENING BUT NOT LESS THAN 2T12 TOP & BOTTOM.
c. BOTH PERPENDICULAR AND DIAGONAL TRIMMING BARS SHALL BE PROVIDED AS SHOWN ABOVE AND ON
EACH FACE OF THE MEMBER..
DRAWING NUMBER
6 6
ST-01/06
A B C D E F G H
1
6
2
4
EGA 500 Roof
965
965
965
965
965
A
A
965
+3.44m 965
965
965
965
965
1
10
+2.50m +2.50m
3798
3138
Polythene Plastic Sheet
Ø8 c/c 200 +0.00m Ø8 c/c 175 Ø8 c/c 175
Ø8 c/c 200
In Both Side In Both Side In Both Side
In Both Side
VAR. 2% 2%
VAR.
B
B
300
300
300
750 750
750
Approved Compacted selected 150mm C-20/25 Reinforced concrete Approved select material Compacted
material to 95% MDD in Layers n.e (Trowel Floor Finish During Casting Time) to 95% MDD in Layers n.e 200mm
Polythene Plastic Sheet Under The Foundation Approved Well Compacted Earth Soil
500mm
500mm Selected Compact soil
Well Compacted Earth Soil
A' A B C C'
550
90 90
200
10
1000
1000
Ø8 c/c 175 L=3420 Ø8 c/c 175 L=3340 Ø8 c/c 175 L=1520
2467 874 870 650
1150 2270
C
C
3000
2800
90
90
Ø8 c/c 175 L=10080
9900
9
1000
1000
Ø8 c/c 200 L=9750
Ø8 c/c 200
In Both Side
2800
3000
9250
9250
90
90
8
Typical Foundation Section
1000
1000
1150 2270
D
2800
3000
90
90
400
400
400
400
1000
1000
90
90
6
+0.00m
1000
1000
Ø8 c/c 250 L=9400
E
1150 2270
27000
2800
3000
90
90
5
200
750
1000
1000
90
90
Ø8 c/c 200
In Both Side
400
400
400
400
1000
1000
F
1150 2270
3000
2800
90
90
C-1 C-2
Ø8 c/c 250 L=9750
3
200
1000
1000
Ø8 c/c 175 L=9340
9250
3000
2800
90
90
1000
1000
2467 874
G
1150 2270
3000
2800
90
90
1000
90 90
550
550
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-02/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
H G F E D C B A
ST-03/06
6 6
DRAWING NUMBER
1
27000
3
5
6
8
9
2
4
10
3000 3000 3000 3000 3000 3000 3000 3000 3000
200 200 200 200 222 200 200 200 200
2800 2800 2800 2800 2800 2778 2800 2800 2800
200
PROJECT NAME
DRAWING TITLE
GB-2
nEsPRIMARYSCHOOL
400
A
BEAM DETAIL
5
5
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
GB-1
10000
EMPLOYER
4
CONSULTANT
4
GB-2
LAWE BERHANU
TEL: 0911419968
B
400
EMAIL: Lawe.partners@gmail.com
MINISTRY OF EDUCATION
2600
400
C
09
YEKA
WOREDA
K/KETEMA
LOCATION
TITLE DEED NO
3
AA000050904212
ADDIS ABEBA
3
GB-1 BEAMS ON AXIS 1 ~ 10 (250X400mm) (10pcs)
A B C
NO
4Ø14 3Ø14
7000 2600
DATE
2117 2267 2117 2100
50
SERKALEM N.
1 1
DAWIT MELAKU
ST-1 ST-1
ARCHITECTURAL DESIGN
325
400
400
REVISION BY
300
300
250 ST-1
300
300
4Ø14 L=10500
9900
SECTION 1-1 SECTION 2-2 Ø8 c/c 150 L=1050
A
INDEX
2 2
Ø8 c/c 200 L=1050
CHECKED BY
DESIGN STAGE
FINAL DESIGN
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
GB-2 BEAMS ON AXIS A,B & C (250X400mm) (3pcs)
CHECKED BY
DATE OF ISSUE
1 2 3 4 5 6 7 8 9 10
LAWE BERHANU
NOVEMBER 2022
3000 3000 3000 3000 3000 3000 3000 3000 3000
FOR CONSTRUCTION PURPOSE ONLY
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150
700
700
3Ø14 L=9700 3Ø14 L=9700
9400 3Ø14 L=9700
9400
300
300
1 1
300
300
700 700
3Ø14 L=11200 3Ø14 L=11200
10900 3Ø14 L=6700
10900
KEY PLAN
H G F E D C B A
H G F E D C B A
ST-04/06
6 6
DRAWING NUMBER
1
27000
3
5
6
8
9
2
4
10
3000 3000 3000 3000 3000 3000 3000 3000 3000
200 200 200 200 222 200 200 200 200
2800 2800 2800 2800 2800 2778 2800 2800 2800
200
PROJECT NAME
DRAWING TITLE
nEsPRIMARYSCHOOL
BEAM DETAIL
BM-1
400
A
5
5
10000
EMPLOYER
4
CONSULTANT
4
LAWE BERHANU
TEL: 0911419968
Gurdshola, derar Mall, 2nd Floor
BM-1
EMAIL: Lawe.partners@gmail.com
B
400
MINISTRY OF EDUCATION
1:40
09
400
C
YEKA
WOREDA
K/KETEMA
LOCATION
TITLE DEED NO
3
AA000050904212
ADDIS ABEBA
3
NO
A B C
DATE
SERKALEM N.
DAWIT MELAKU
7000 2600
ARCHITECTURAL DESIGN
1 1
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150
REVISION BY
9900
300
300
50
3Ø14
A
300
300
150
4Ø14 L=10500
INDEX
9900
2 2
ST-1 350
CHECKED BY
200
DESIGN STAGE
FINAL DESIGN
3Ø14 ST-1
400
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
Ø8 c/c 150 L=1100
SECTION 1-1
CHECKED BY
GB-2 BEAMS ON AXIS A,B & C (250X400mm) (3pcs)
DATE OF ISSUE
Ø8 c/c 200 L=1100
LAWE BERHANU
NOVEMBER 2022
FOR CONSTRUCTION PURPOSE ONLY 1 2 3 4 5 6 7 8 9 10
2 2 2 2 2 2 2 2 2
st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150 st Ø8 c/c 150 st Ø8 c/c 200 st Ø8 c/c 150
700
700
3Ø14 L=9700 3Ø14 L=9700
1 1
9400 3Ø14 L=9700
9400
300
300
300
300
700 700
3Ø14 L=11200 3Ø14 L=11200
10900 3Ø14 L=6700
10900
KEY PLAN
H G F E D C B A
1
6
2
4
350 350
A B C
C
A
A
TTB-1
10
200
0
st Ø8 c/c 15
2111
2613
1
1
TTB-1 BEAMS ON AXIS 1~10 (200X400mm) (10pcs)
2800
3000
TTB-1
9
200
B
B
B
2800
3000
0
st Ø8 c/c 15
2345
TTB-1
8
200
8
4Ø14 L=1132
4Ø14 L=1132
2800
3000
10628
10628
TTB-1
C
C
1
0
7
200
st Ø8 c/c 20
2345
7035
2800
3000
TTB-1
6
200
0
st Ø8 c/c 15
2093
D
D
27200
2800
3000
TTB-1
5
200
0
st Ø8 c/c 15
A
802
452
2800
3000
350 350
TTB-1
4
200
E
E
Ø8 c/c 150 L=1100
Ø8 c/c 200 L=1100
2800
3000
345
TTB-1
150
50
3
200
ST-1
2800
3000
F
F
TTB-1
SECTION 1-1
4Ø14
4Ø14
ST-1
2
200
200
2800
3000
400
TTB-1
1
200
G
G
10000
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-05/06
K/KETEMA
DRAWING NUMBER
YEKA
H
DETAIL
1
5
6
2
4
1
6
2
4
A
A
A B C
B
B
+4.48m
280
+4.20m
871
+3.54m
829
+2.50m
C
C
2500
+0.00m
-0.40m
D
D
7000 2600
+4.48m
300 300
+4.20m
300 300
1 1
+3.54m +3.54m
300 300
1 1
E
E
1 1
+2.50m +2.50m
St Ø8 c/c 200
200x400
St Ø8 c/c 200
3Ø14 L=5641
3Ø14 L=5609
3Ø14 L=5330
200x400
3Ø14 L=5340
4789
5021
4540
4510
3Ø14 L=4680
3Ø14 L=4650
St Ø8 c/c 200
200x400
3880
3850
1 1
1 1 1 1
F
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-06/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
RHS Purlin
70mm x 50mm
A B C
A
A
EGA 500 Roof
+4.24m
50x70mm RHS Purlin
EGA 500 Roof Sheet
No Ceiling 1000
1000
1000
1000
+3.44m 1000
1000
1000
1000
1
10
+2.50m +2.50m
B
B
Polythene Plastic Sheet
Ø8 c/c 200 Ø8 c/c 200 Ø8 c/c 200
+0.00m Ø8 c/c 200
In Both Side In Both Side In Both Side
In Both Side
2% 2%
C
C
150mm C-20/25 Reinforced concrete
(Trowel Floor Finish During Casting Time)
Polythene Plastic Sheet Under The Foundation
50mm C-5 Lean Concrete under Foundation Beams
500mm Selected Compact soil
Well Compacted Earth Soil
D
D
Typical Foundation Section
400
E
E
Ø8 c/c 200 +0.00m Ø8 c/c 200
In Both Side In Both Side
2%
F
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-01/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
A B C
1200 4400 2600 700
500
550
600
536
B
B
90 90
200
3
1000
1000
Ø8 c/c 200 L=2617 Ø8 c/c 200 L=2530 Ø8 c/c 200 L=1517
1150 1467 1663 867 841 650
2800
3000
C
C
90
90
Ø8 c/c 200 L=7480
7300
1000
6100
6100
7200
200
2
1000
1000
D
D
Ø8 c/c 200 L=2617 Ø8 c/c 200 L=2530 Ø8 c/c 200 L=1517
1150 1467 1663 867 841 650
2800
3000
90
90
Ø8 c/c 200 L=7480
7300
Ø8 c/c 200 L=1550
1000
E
E
200
1 90 90
550
550
600
500
Ø8 c/c 200 L=8800
F
G
G
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-02/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A B C
A
A
GB-1
200
3
2800
3000
B
B
GB-1
6200
200
2
GB-2
GB-2
GB-2
2800
3000
GB-1
C
C
200
D
A B C
4400 2600
3900 2100
1 1
1 1
E
4Ø14 L=7900
300
300
7300
300
300
ST-1
3Ø14
GB-2 BEAMS ON AXIS A & C (250X400mm) (3pcs) 250
F
F
A B C SECTION 1-1
3000 3000
2700 2700
50
1 1
325
1 1
3Ø14 L=6700
Ø8 c/c 150 L=1050
300
300
6100
300
3Ø14 L=6700
6100
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-03/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A B C
A
A
3
BM-1
BM-1
B
B
2
C
C
1
D
D
Ground Floor Slab Thickness 150mm @ +0.00m
1:25
BM-1 BEAMS ON AXIS A & B (600X200mm) (2pcs)
1 2 3
E
E
3000 3000
2700 2700
1 1
1 1
F
3Ø14 L=6450
150
150
6125
150
150
3Ø14 L=6450
6125
G
50
G
3Ø14
150
350
200
ST-1
3Ø14 ST-1
400
Ø8 c/c 150 L=1100
SECTION 1-1 Ø8 c/c 200 L=1100
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-04/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A B C
A
A
TTB-1
3
B
B
TTB-1
2
C
C
TTB-1
1
D
TB-1 BEAMS ON AXIS 1~3 (200X400mm) (3pcs)
A B C
2093
7035 1
3919
802 1
E
E
452 1
0
st Ø8 c/c 15
1
0
st Ø8 c/c 15
5
st Ø8 c/c 12
300
4Ø14 L=8590
F
F
7990
300
300
4Ø14 L=8590
7990
300
3Ø14
50
400
345
ST-1
G
G
3Ø14 150
200 ST-1
SECTION 1-1 Ø8 c/c 150 L=1100
Ø8 c/c 200 L=1100
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-05/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A B C
+4.22m
440 260
A
A
+3.96m
+3.52m
1020
+2.50m
B
B
2500
+0.00m
C
C
-0.40m
4400 2600
Columns
+4.22m +4.22m
D
D
300 300
+3.96m
300 300
1 1
1 1
E
200x400
St Ø8 c/c 200
3Ø14 L=5101
3Ø14 L=5348
200x400
3Ø14 L=5382
3Ø14 L=5089
4540
4528
3Ø14 L=4661
4762
3Ø14 L=4650
St Ø8 c/c 200
4510
200x400
3861
3829
1 1
1 1 1 1
F
F
+0.00m +0.00m +0.00m +0.00m
6Ø14
50
ST-3
150
G
G
200
350
400 ST-1
Ø8 c/c 200 L=1100
SECTION 1-1
1:10
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
ST-06/06
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A B C A B C
A
A
10000 10600
7000 2600
800 7000 2800
3500 3500 700 1000 1000 1000 1000 1000 1000 1000 900 900 900
10 10
520
D1
640
WD1
3000
3000
680
640
WD1
520
9 9
520
B
B
640
WD1
CLASSROOM 1 Shelf
3000
3000
680
60 m2
640
WD1
520
8 8
520
640
WD1
3000
3000
680
640
WD1
C
C
520
7 7
520
D1
640
WD1
A A A A
3000
680
3000
640
WD1
520
6 6
520
640
WD1
CLASSROOM 2
27200
27200
3000
3000
680
D
D
60 m2
640
WD1
Trawel finish
during casting
520
5 5
520
640
WD1
3000
3000
680
640
WD1
520
4 4
520
D1
E
E
640
WD1
3000
3000
680
640
WD1
520
3 3
520
640
WD1
CLASSROOM 3
3000
3000
680
60 m2
640
WD1
520
F
F
2 2
520
640
WD1
3000
3000
680
640
WD1
520
1 1
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-01/04
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
1 2 3 4 5 6 7 8 9 10
+4500
A B C A A C B C B
+2500
B
+000
Front View
10 9 8 7 6 5 4 3 2 1
C
C
D D E E D D E D D
+2500
+700
D
Rear Elevation
E
E
A B C
A B C
200
7000 2600
+4500
+4500
EGA 500 Roof
50x70mm RHS Purlin
No Ceiling
+3440
1720
1020
440
440
240
220
200
4500
Plastered &
Plasted and Painted
3440
Painted
1600
F
F
2500
+000
700
+000
2% 2%
2% 2%
compacted selected
Side Elevation materials
Section A-A
G
G
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-02/04
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
W1 DESCRIPTION W2 DESCRIPTION
B
400
20x20x1mm
20x20x1mm
RHS flashing
GLAZING AREA 0.34 m2 RHS flashing
GLAZING AREA 0.14m2
400
400
5mm clear glass 5mm clear glass
1600
D1 Shelf
C
C
DESCRIPTION
Door Handle
150
STEEL
40
FRAMING TYPE
200x280x40mm
900
40 40
820
+2300
STEEL 150 Solid Wood Panel
38mm
L Door Jam
38mm
40x40x2mm RHS PANEL TYPE 40x40 angle
@ 800mm H
150
L Door Jam
Door Frame Iron support
340
15x15x1mm
Angle Flashing
15x15x1mm
Angle Flashing PANEL AREA 1.4 m2 150
40x40 angle
2300
150
Iron support
1570
Door
2250
Handle
200
TOTAL DOOR
100
2.3 m2
D
D
Out AREA 150
1000
40
In
40
50
+0.00
340
50
25x25x2mm RHS
315
Louver
50
40 50
3
40x40x2mm RHS
1000
Door Frame
QUANTITY
38mm L Door Jam Door Leaf Out LOCATION Class Room Block
E
E
W3
DESCRIPTION
GLAZING TYPE
220
20x20x1mm
RHS flashing
0.03 m2
F
F
220
220
QUANTITY 27
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-03/04
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
Window Detail - Front
5 6 9 10 8 9
4
1
A 5
2
7
2
B 8
3
6
3
C 7
4
B
B
1180 440 1180 440 420 420 440
440
440
240
240
420
1100
1100
1100
1100
240
440
440
440
420
1180 1180
440
240
240
240
2800 2800 2800
Window
220x220mm
Window Window Window Window Window
400x400mm 220x220mm 400x400mm 220x220mm 400x400mm
C
C
Type A Wall Opening Type B Wall Opening Type C Wall Opening
D
3 2
5 4 2 1
6
9
D 5
8
4
7
E 3
6
10 9 8 7
240
240
420 240 520 440 520 240 420 240 520 440 2380 520 240 420
440
440
240
240
660
660
220
220
220
220
2780 2780
E
E
400x400mm Window Window 400x400mm Window
220x220mm 400x400mm 220x220mm
Window
400x400mm
Type D Type E
Wall Opening Wall Opening
F
F
G
G
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-01/04
DRAWING NUMBER
YEKA
H
2
4
1
6
3
4
2
A B C A B C
10000 10600
7000 2600
800 7000 2800
A
A
3500 3500 700 1000 1000 1000 1000 1000 1000 1000 900 900 900
13 13
520
D1
640
WD1
3000
3000
680
640
WD1
520
12 12
520
640
WD1
CLASSROOM 1 Shelf
3000
3000
680
60 m2
640
B
B
WD1
FLOOR
520
11 11
520
640
WD1
3000
3000
680
640
WD1
520
10 10
520
D1
640
WD1
3000
3000
680
C
C
640
WD1
520
9 9
520
640
WD1
CLASSROOM 2 Shelf
3000
3000
680
60 m2
640
WD1
520
8 8
520
640
WD1
3000
3000
680
D
D
640
WD1
520
36200
36200
7 7
520
D1
640
WD1
A A A A
3000
680
3000
640
WD1
520
6 6
520
640
WD1
E
E
CLASSROOM 3
3000
3000
680
60 m2
640
WD1
Trawel finish
during casting
520
5 5
520
640
WD1
3000
3000
680
640
WD1
520
4 4
520
D1
640
F
F
WD1
3000
3000
680
640
WD1
520
3 3
520
640
WD1
CLASSROOM 4
3000
3000
680
60 m2
640
WD1
520
2 2
520
G
G
640
WD1
3000
3000
680
640
WD1
520
1 1
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-01/04
DRAWING NUMBER
YEKA
H
3
4
2
A B C D E F G H
KEY PLAN
FLOOR
1 1
1 2 3 4 5 6 7 8 9 10 11 12 13
+4500
NOVEMBER 2022
LAWE BERHANU
+2500
DATE OF ISSUE
CHECKED BY
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
GRADE 5 GRADE 5 GRADE 5 GRADE 5
COLOR COLOR COLOR COLOR
FINAL DESIGN
BLUE YELLOW RED RED
Plasted and Painted Plasted and Painted Plasted and Painted Plasted and Painted
DESIGN STAGE
CHECKED BY
2 2
INDEX
+000
A
Front View
SERKALEM N.
DATE
NO
10 9 8 10 9 8 7 6 5 4 3 2 1
ADDIS ABEBA
AA000050904212
3
TITLE DEED NO
LOCATION
K/KETEMA
WOREDA
YEKA
D D E D D E E D D E D D
09
+2500
+700
MINISTRY OF EDUCATION
EMAIL: Lawe.partners@gmail.com
Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968
LAWE BERHANU
Rear Elevation 4
CONSULTANT
4
EMPLOYER
A B C
200
7000 2600
+4500
A B C
EGA 500 Roof
50x70mm RHS Purlin
+4500
No Ceiling
+3440
1720
1020
440
440
240
220
200
4500
1600
Plastered &
2500
Painted Ceramic Window Sill Plastic Sheet
Moisture Separator
+000
700
nEsPRIMARYSCHOOL
2% 2%
DRAWING TITLE
PROJECT NAME
+000
2% 2%
compacted selected
materials
A B C D E F G H
1
6
2
4
W1 DESCRIPTION W2 DESCRIPTION
A
A
SIZE 600 x 1600 SIZE 400 x 400
20x20x1mm
20x20x1mm
RHS flashing
GLAZING AREA 0.34 m2 RHS flashing
GLAZING AREA 0.14m2
400
400
5mm clear glass 5mm clear glass
1600
B
FLOOR
600 QUANTITY 24 QUANTITY 36
D1 DESCRIPTION
Shelf
Door Handle
150
C
C
STEEL
40
FRAMING TYPE
200x280x40mm
900
40 40
820
+2300
STEEL 150 Solid Wood Panel
38mm
L Door Jam
38mm
40x40x2mm RHS PANEL TYPE 40x40 angle
@ 800mm H
150
L Door Jam
Door Frame Iron support
340
15x15x1mm
Angle Flashing
15x15x1mm
Angle Flashing PANEL AREA 1.4 m2 150
40x40 angle
2300
150
Iron support
1570
Door
2250
Handle
200
TOTAL DOOR
100
2.3 m2
Out AREA 150
1000
40
In
40
50
+0.00
340
50
25x25x2mm RHS
315
Louver
50
40 50
4
40x40x2mm RHS
1000
Door Frame
QUANTITY
38mm L Door Jam Door Leaf Out LOCATION Class Room Block
D
D
W3
DESCRIPTION
E
E
SIZE 220 x 220
GLAZING TYPE
220
20x20x1mm
RHS flashing
0.03 m2
220
220
F
QUANTITY 36
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-03/04
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
Window Detail - Front
5 6 9 10 8 9
4
1
A 5
2
7
2
B 8
3
6
3
C 7
4
B
B
1180 440 1180 440 420 420 440
FLOOR
420 240 240 420
440
440
440
240
240
420
1100
1100
1100
1100
240
440
440
440
420
1180 1180
440
240
240
240
2800 2800 2800
Window
220x220mm
Window Window Window Window Window
400x400mm 220x220mm 400x400mm 220x220mm 400x400mm
C
Window Detail - Rear
D
D
3 2
5 4 2 1
6
9
D 5
8
4
7
E 3
6
10 9 8 7
240
240
420 240 520 440 520 240 420 240 520 440 2380 520 240 420
440
440
240
240
660
660
220
220
220
220
2780 2780
E
220x220mm 400x400mm 220x220mm
Window
400x400mm
Type D Type E
Wall Opening Wall Opening
F
F
G
G
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-04/04
DRAWING NUMBER
YEKA
H
2
4
1
6
5
3
2
4
1
3
A
A
3440
6000
2500 1020
+3440
3000 3000
2%
1
A
A
600
1500
WD1
+2500
+2500
Girls
Clean
Section A-A
WD2
Rear Elevation
WD2
000
4400
2
WD2
7000
B
B
WD3
WD2
Disabled
B
B
3
000
Moisture Separator
Plastic Sheet
C
C
2%
+4240
C
C
1
3
6200
100 100
+3440
3000 3000
2%
200
A
A
+2500
000
WD2
Urinal
WD2
Side Elevation
4400
D
D
WD2
7000
7400
Boys Toilet
Jan
WD3
WD2
Disabled
B
B
C
C
200
2%
E
E
+4240
1
3
6000
3000 3000
800
A
0.00
F
F
1
4400
Front Elevation
8000
2
Roof Plan @+4240
B
2600
G
G
C
3
+4240
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
KEY PLAN
YEKA
H
H
6
3
2
4
A B C D E F G H
KEY PLAN
40 650 40
D1 DESCRIPTION
40x40x4mm
340
40x40x2mm RHS
1 Angle Iron
Door Jam
Door Frame 1
SIZE 800 x 2300
WD1
25x25x3mm Angle Iron
Frame
NOVEMBER 2022
LAWE BERHANU
2300
1620
DATE OF ISSUE
Door
1.04 m2
CHECKED BY
Handle
PANEL AREA
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
pad lock
2300
2280
TOTAL DOOR
1.6 m2
AREA
FINAL DESIGN
DESIGN STAGE
CHECKED BY
0.8mm Corrugated
2 +0.00 1
Out Sheet Metal
2
INDEX
QUANTITY
A
In
800 730
25
LOCATION Toilet Blocks
50
340
50
38mm L Door Jam Door Leaf Out 25x25x2mm RHS
315
Louver
REVISION BY
40 50
40x40x2mm RHS
Door Frame
Door Handle
ARCHITECTURAL DESIGN
SERKALEM N.
38mm L Door Jam
DATE
D2 Door Leaf In
NO
DESCRIPTION
ADDIS ABEBA
AA000050904212
3
TITLE DEED NO
LOCATION
K/KETEMA
WOREDA
40 450 40
YEKA
FRAMING TYPE STEEL 40 785 40
09
+2300 PANEL TYPE STEEL 40x40x4mm
340
40x40x2mm RHS
40x40x4mm
340
Angle Iron Door Frame 40x40x2mm RHS
Door Jam Angle Iron Door Frame
Door Jam
0.7 m2
MINISTRY OF EDUCATION
TOTAL DOOR
EMAIL: Lawe.partners@gmail.com
1.2 m2
AREA
2300
1620
2300
1620
CONSULTANT
Door
4 530 Door
EMPLOYER
600 Handle
Handle
Door Leaf Out
LOCATION Toilet Blocks
38mm L Door Jam
pad lock
pad lock
0.8mm Corrugated
Out Sheet Metal 0.8mm Corrugated
Out Sheet Metal
In
In
50
340
25
50
340
50
25x25x2mm RHS
315
50
D3 Louver 25x25x2mm RHS
50
315
Louver
50
40 50
DESCRIPTION
40 50
40x40x2mm RHS
Door Frame 40x40x2mm RHS
Door Handle Door Frame
Door Handle
nEsPRIMARYSCHOOL
DRAWING TITLE
PROJECT NAME
PANEL AREA 1.2 m2
2300
2280
TOTAL DOOR
1.92 m2
AREA
6
+0.00 QUANTITY 2
DRAWING NUMBER
6
900
A B C D E F G H
1
6
3
4
2
A B C A B C
10000 10600
7000 2600
800 7000 2800
A
A
3500 3500 700 1000 1000 1000 1000 1000 1000 1000 900 900 900
13 13
520
D1
640
WD1
3000
3000
680
640
WD1
520
12 12
520
640
WD1
CLASSROOM 1 Shelf
3000
3000
680
60 m2
640
B
B
WD1
FLOOR
520
11 11
520
640
WD1
3000
3000
680
640
WD1
520
10 10
520
D1
640
WD1
3000
3000
680
C
C
640
WD1
520
9 9
520
640
WD1
CLASSROOM 2 Shelf
3000
3000
680
60 m2
640
WD1
520
8 8
520
640
WD1
3000
3000
680
D
D
640
WD1
520
36200
36200
7 7
520
D1
640
WD1
A A A A
3000
680
3000
640
WD1
520
6 6
520
640
WD1
E
E
CLASSROOM 3
3000
3000
680
60 m2
640
WD1
Trawel finish
during casting
520
5 5
520
640
WD1
3000
3000
680
640
WD1
520
4 4
520
D1
640
F
F
WD1
3000
3000
680
640
WD1
520
3 3
520
640
WD1
CLASSROOM 4
3000
3000
680
60 m2
640
WD1
520
2 2
520
G
G
640
WD1
3000
3000
680
640
WD1
520
1 1
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-01/04
DRAWING NUMBER
YEKA
H
3
4
2
A B C D E F G H
KEY PLAN
FLOOR
1 1
1 2 3 4 5 6 7 8 9 10 11 12 13
+4500
NOVEMBER 2022
LAWE BERHANU
+2500
DATE OF ISSUE
CHECKED BY
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
GRADE 5 GRADE 5 GRADE 5 GRADE 5
COLOR COLOR COLOR COLOR
FINAL DESIGN
BLUE YELLOW RED RED
Plasted and Painted Plasted and Painted Plasted and Painted Plasted and Painted
DESIGN STAGE
CHECKED BY
2 2
INDEX
+000
A
Front View
SERKALEM N.
DATE
NO
10 9 8 10 9 8 7 6 5 4 3 2 1
ADDIS ABEBA
AA000050904212
3
TITLE DEED NO
LOCATION
K/KETEMA
WOREDA
YEKA
D D E D D E E D D E D D
09
+2500
+700
MINISTRY OF EDUCATION
EMAIL: Lawe.partners@gmail.com
Gurdshola, derar Mall, 2nd Floor
TEL: 0911419968
LAWE BERHANU
Rear Elevation 4
CONSULTANT
4
EMPLOYER
A B C
200
7000 2600
+4500
A B C
EGA 500 Roof
50x70mm RHS Purlin
+4500
No Ceiling
+3440
1720
1020
440
440
240
220
200
4500
1600
Plastered &
2500
Painted Ceramic Window Sill Plastic Sheet
Moisture Separator
+000
700
nEsPRIMARYSCHOOL
2% 2%
DRAWING TITLE
PROJECT NAME
+000
2% 2%
compacted selected
materials
A B C D E F G H
1
6
2
4
W1 DESCRIPTION W2 DESCRIPTION
A
A
SIZE 600 x 1600 SIZE 400 x 400
20x20x1mm
20x20x1mm
RHS flashing
GLAZING AREA 0.34 m2 RHS flashing
GLAZING AREA 0.14m2
400
400
5mm clear glass 5mm clear glass
1600
B
FLOOR
600 QUANTITY 24 QUANTITY 36
D1 DESCRIPTION
Shelf
Door Handle
150
C
C
STEEL
40
FRAMING TYPE
200x280x40mm
900
40 40
820
+2300
STEEL 150 Solid Wood Panel
38mm
L Door Jam
38mm
40x40x2mm RHS PANEL TYPE 40x40 angle
@ 800mm H
150
L Door Jam
Door Frame Iron support
340
15x15x1mm
Angle Flashing
15x15x1mm
Angle Flashing PANEL AREA 1.4 m2 150
40x40 angle
2300
150
Iron support
1570
Door
2250
Handle
200
TOTAL DOOR
100
2.3 m2
Out AREA 150
1000
40
In
40
50
+0.00
340
50
25x25x2mm RHS
315
Louver
50
40 50
4
40x40x2mm RHS
1000
Door Frame
QUANTITY
38mm L Door Jam Door Leaf Out LOCATION Class Room Block
D
D
W3
DESCRIPTION
E
E
SIZE 220 x 220
GLAZING TYPE
220
20x20x1mm
RHS flashing
0.03 m2
220
220
F
QUANTITY 36
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-03/04
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
Window Detail - Front
5 6 9 10 8 9
4
1
A 5
2
7
2
B 8
3
6
3
C 7
4
B
B
1180 440 1180 440 420 420 440
FLOOR
420 240 240 420
440
440
440
240
240
420
1100
1100
1100
1100
240
440
440
440
420
1180 1180
440
240
240
240
2800 2800 2800
Window
220x220mm
Window Window Window Window Window
400x400mm 220x220mm 400x400mm 220x220mm 400x400mm
C
Window Detail - Rear
D
D
3 2
5 4 2 1
6
9
D 5
8
4
7
E 3
6
10 9 8 7
240
240
420 240 520 440 520 240 420 240 520 440 2380 520 240 420
440
440
240
240
660
660
220
220
220
220
2780 2780
E
220x220mm 400x400mm 220x220mm
Window
400x400mm
Type D Type E
Wall Opening Wall Opening
F
F
G
G
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
K/KETEMA
AR-04/04
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
A B C
B
B
10000
7000 2800
10
a
3000
a a a
9
C
C
CLASSROOM 1
3000
60 m2
b b b
8
3000
D
D
7
A A
a
3000
a a a
6
CLASSROOM 2
27200
3000
E
E
60 m2
Trawel finish
during casting
b b b
5
3000
4
F
F
a
3000
a a a
3
CLASSROOM 3
3000
60 m2
b b b
2
G
G
3000
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-01/02
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
7000 2800
13
3000 a
A
A
b
a a a
12
CLASSROOM 1
3000
60 m2
b b b
11
B
B
3000
7000 2800
10
a
3000
a a a
C
C
9
CLASSROOM 2
3000
60 m2
b b b
8
3000
D
D
A B C
7000
36200
7
4400 2600
3
A Jan a
a
3000
b Girls
Clean WD3
3000
Disabled
a a a
6 WD2
a a
6000
2 WD1
E
E
CLASSROOM 3
3000
60 m2
3000
GIRLS TOILET
3000
A B C
7400
4 7000
F
F
200 4400 2600 200
100
a 3
Jan
3000
a
b
Urinal WD3
3000
a a a Disabled
3
WD2
a a
6200
2
CLASSROOM 4
3000
60 m2
G
G
3000
1
100
3000
BOYS TOILET
CLASSROOM Block 3 GROUND LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-02/02
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
A B C
A B C
B
B
10000
7000 2800
10
10
Finance /2 HR a d
3000
a 12 m
3000
b
a
9
a a a
9
C
C
Deputy
2
b
3000
12 m d
CLASSROOM 1
3000
60 m2
b
8
b b b
8 c
c
Principal
3000
2
20 m
3000
7
D
D
7
A a A
3000
A A b
a
3000
b
Staff2
62
a
m
a a
a 6 Trowel finish
a a
6 during casting
27200
3000
CLASSROOM 2
27200
3000
60 m2
E
E
Trawel finish
during casting b b b
5
b b b
5
3000
3000
4
4
Department
2
40 m a
F
F
3000
a FF=Troweled
3000
During Casting
b
a a a
3
a a a
3
3000
CLASSROOM 3
3000
60 m2
2
b b b c
2
G
G
c
3000
Record
3000
2
20 m
1
1
ADMINISTRATION
CLASSROOM BLOCK 1&2 GROUND FLOOR
GROUND FLOOR
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-01/04
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
A B C
A B C
B
B
10000 10000
4700 4700
7000 2800 400
600 4700 4200 600
10 1
a
3000
3000
b
a a a
COMMUNITY HALL
9 a a a
STEM Center
2
2 170 m2
61 m a
C
C
Trowel finish
during casting
FF=Troweled During
3000
3000
Casting
b b
b b b b b b a a
8 3
3000
3000
18200
D
D
7 a a a
4
A a A A A
3000
3000
a a a b b b
6 5
27200
3000
3000
E
E
b b b a a a
5 6
General Science
2
124 m
3000
3000
FF=Troweled During
Casting
4 7
COMMUNITY HALL
GROUND FLOOR
F
F
a
3000
a a a
3
3000
b b b
2
G
G
3000
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-02/04
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
A B C
B
B
10000
7000 2800
A B C
10
10000
7000 2600
3000
b b b
3000
9
C
C
a a a a
3000
2
a
a a a
8 3000
Lobby
D1
IT Center
2 b b
bb
102 m b b b b aa
3000
FF=Troweled During a a 3
Casting
b b b LIBRARY Reception
D
D
3000
7 170 m2
Troweled
During Casting
18200
A
a a a a
3000
a a a
3000
b b b b
27200
3000
5
E
E
3000
5
D1
b
a a a a
3000
a 6
b b b
3000
4
Language
Center
2
62.3 m
F
F
FF=Troweled During
3000
7
Casting
LIBRARY GROUND FLOOR
a a a
3
3000
2
G
G
c
First aid
2
20 m c
3000
1
IT LANGUAGE CENTER
,
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-03/04
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
1
6
2
4
A
A
A B C
B
B
A B C
10000 7400
7100
7000 2800 400
1500 3200 2300
200
2
c
EL c c
1100
Board
b
D2
3000
a
c Office
3200
2800
3000
Rest
Room Area=8m2
c
1700
c
b b b
6
200
1
C
C
GUARD HOUSE
GROUND FLOOR
3000
Special-need class
60 m2
Trowel finish
during casting
a a a
5
3000
D
D
4
A B C
3000
40 m2 a 4400 2600
3
Jan a
a a a
3 Girls
Clean WD3
3000
Disabled
A A
3000
WD2
E
E
a a
6000
2 WD1
b b
3000
Counseling
3000
20 m2
GIRLS TOILET
1
THERAPEUTIC CENTER
F
F
SPECIAL NEED GROUND FLOOR A
7400
B C
7000
200 4400 2600 200
100
3
Jan a
Urinal WD3
3000
Disabled
WD2
a a
6200
2
G
G
3000
1
100
BOYS TOILET
LOCATION THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
PROJECT NAME EMPLOYER
KEY PLAN
FOR CONSTRUCTION PURPOSE ONLY
ADDIS ABEBA
nEsPRIMARYSCHOOL MINISTRY OF EDUCATION
EL-04/04
K/KETEMA
DRAWING NUMBER
YEKA
H
2
4
A B C D E F G H
KEY PLAN
A B C A B C
- THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
ARCHITECTS AND ENGINEERS DRAWINGS AND SPECIFICATIONS.
- PIPES SHOULD BE LAID AS PER THE FOLLOWING SLOPE
1 Provide a minimum of 2.0% slope for Ø50 horizontal drainage pipes. 1
Ø25 Ø25 Ø25 Provide a minimum of 2.0% slope for Ø75 horizontal drainage pipes.
Provide a minimum of 1.5% slope for Ø110 horizontal drainage pipes.
3 3
Provide a minimum of 1.2% slope for Ø150 horizontal drainage pipes.
Jan Jan
- ALL PIPE DIAMETERS ARE IN MILLIMETERS UNLESS OTHERWISE
Girls Ø25 - ALL WATER SUPPLY PIPE DIAMETERS GIVEN ARE NOMINAL (INTERNAL )
Clean Urinal FOR CONSTRUCTION PURPOSE ONLY
Ø25 Ø25 DIAMETER. ALL COLD & HOT WATER PIPES ARE RUNNING AT ABOVE
FALSE CEILING.
NOVEMBER 2022
LAWE BERHANU
DATE OF ISSUE
- ALL uPVC WASTE WATER PIPES SHOULD NOT BE HEATED FOR
CHECKED BY
Ø25 CONNECTION. ALL PIPING CONNECTION SHOULD BE MADE WITH
Ø25 Ø25 Ø25 APPROVED FITTINGS.
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
Ø32 From EWT Ø32 From EWT
Ø32 Ø32 Ø32 Ø32 LEGEND
FINAL DESIGN
DESIGN STAGE
Ø25 Ø25
CHECKED BY
2 2 PPR Pipe for Cold Water
2 - 2
INDEX
Ø25 Ø25 Supply for Internal use, PN-20
A
Ø25 Ø25 - PPR Pipe for Hot Water
Supply for Internal use, PN-20
REVISION BY
Gate Valve
- One Way Valve
ARCHITECTURAL DESIGN
- uPVC waste pipe, PN-6
DAWIT MELAKU
-
SERKALEM N.
DATE
H.W. - Hand wash basin
1 1 W.C. - Low flush water closet
NO
K.S. - Kitchen sink
GIRLS TOILET GROUND FLOOR WATER SUPPLY INSTALLATION BOYS TOILET GROUND FLOOR WATER SUPPLY INSTALLATION SH. - Shower
B.T. - Bath Tub
3
ADDIS ABEBA
AA000050904212
SCALE 1:50 SCALE 1:50
3
TITLE DEED NO
F.D. - Floor drain
LOCATION
K/KETEMA
WOREDA
M.H. - Manhole
YEKA
Down Pipe
09
D/P -
CP. - Concrete Pipe
EWT - Elevated water tank
A B C GSNden tap
G.T -
H/L - Higher level
MINISTRY OF EDUCATION
EMAIL: Lawe.partners@gmail.com
F/B - From below
TEL: 0911419968
-
LAWE BERHANU
T/A - To below 4
CONSULTANT
FCO - Floor clean out
4
EMPLOYER
CO - Clean out
F.G. - Floor Gulley
LAN. - Laundry
Ø32 From Source
W1 - Water Supply Riser
INSTALLATION
nEsPRIMARYSCHOOL
DRAWING TITLE
PROJECT NAME
1 Ø75 D/P T/B
6
ROOF FLOOR WASTE WATER INSTALLATION DRAWING NUMBER
6
SCALE 1:50
SN-01/02
A B C D E F G H
A B C D E F G H
12000 KEY PLAN
EFFECTIVE VOLUME 70m3 SEPTIC TANK 150 250 700 Ø12/150 9100 Ø12/150 700 950 150
150
B
12000
3000 200 4400 200 3800 200 - THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT
200
200
ARCHITECTS AND ENGINEERS DRAWINGS AND SPECIFICATIONS.
- PIPES SHOULD BE LAID AS PER THE FOLLOWING SLOPE
2700
700 Provide a minimum of 2.0% slope for Ø50 horizontal drainage pipes.
1 1490 700 1010 Ø150 PN-6 700 1010 Ø150 PN-6
A 1
4300
4000
uPVC pipe uPVC pipe
2300
Provide a minimum of 2.0% slope for Ø75 horizontal drainage pipes.
2700
2300
700
700
700
Ø8/200 Ø8/200 Provide a minimum of 1.5% slope for Ø110 horizontal drainage pipes.
450 Provide a minimum of 1.2% slope for Ø150 horizontal drainage pipes.
Ø200 uPVC pipe, PN-6
from MH Ø12/200
Ø12/200 - ALL PIPE DIAMETERS ARE IN MILLIMETERS UNLESS OTHERWISE
200
200
Ø10/200 - ALL WATER SUPPLY PIPE DIAMETERS GIVEN ARE NOMINAL (INTERNAL )
SECTIONAL PLAN OF SEPTIC TANK
150
B
DIAMETER. ALL COLD & HOT WATER PIPES ARE RUNNING AT ABOVE FOR CONSTRUCTION PURPOSE ONLY
STRUCTURAL SECTION FALSE CEILING.
NOVEMBER 2022
LAWE BERHANU
12000 - ALL uPVC WASTE WATER PIPES SHOULD NOT BE HEATED FOR
DATE OF ISSUE
CHECKED BY
1490 700 2500 700 5950 Ø12/150 700 650 CONNECTION. ALL PIPING CONNECTION SHOULD BE MADE WITH
APPROVED FITTINGS.
12000
THESE DRAWINGS ARE NOT VALID WITHOUT THE SEALS OF THE CLIENT AND THE ARCHITECT/CONSULTANT
1490 700 2500 700 5262 700 650 DETAIL A
1200
700
3000 200 3000 200 5200
200
Ø200 PN-4
a
LEGEND
100
FINAL DESIGN
Ø150 PN-6 Ø150 PN-6 uPVC pipe a
DESIGN STAGE
700
uPVC pipe uPVC pipe
CHECKED BY
2
300
5 2
PPR Pipe for Cold Water
200
-
.
1
.
5 SECTION 2-2
.
4 4 4 6
700
7 2 2 d
2 700 700 2
.
2700
2700
4300
.
Supply for Internal use, PN-20
75
INDEX
Ø200 uPVC pipe, PN-6 3
A
.
150
400
.
.
from MH
4
.
2900
50 50
- PPR Pipe for Hot Water
.
2700
1
75
c
5
.
2400
b
b Ø10/200 L=300
.
2100
2100
.
Supply for Internal use, PN-20
20
.
5 d 280
a 4Ø10/200 L=600
20cm thick 20cm thick 600
c Ø10/200 L=300
50
20
HCB wall HCB wall 280
- Gate Valve
200
- uPVC waste pipe, PN-6
ARCHITECTURAL DESIGN
5cm thick SECTIONAL A-A
120
3900
DAWIT MELAKU
SERKALEM N.
120
H.W. - Hand wash basin
DATE
5900
400 5900 W.C. - Low flush water closet
NO
12000
3000
2 Ø12/150 L=11340
3000
F.D. - Floor drain
3 Ø12/150 L=3230 M.H. - Manhole
120
120
120
120
100 D/P - Down Pipe 3
ADDIS ABEBA
AA000050904212
5110
3 1395
TITLE DEED NO
Ø10/200 # CP. - Concrete Pipe
LOCATION
K/KETEMA
WOREDA
760 760 Elevated water tank
YEKA
900 560 830 830 EWT -
120
120
2700
120
120
120
120
120
120
09
G.T - Garden tap
2260 2390
C pipe, PN-6
H/L - Higher level
4 Ø12/150 L=4020 5 Ø12/150 L=2240 6 Ø12/150 L=1560 7 Ø12/150 L=4290
L/L - Lower level
T/A - To above
BOTTOM SLAB REINFORCEMENT
F/B - From below
MINISTRY OF EDUCATION
T/A - To below
EMAIL: Lawe.partners@gmail.com
A B C A B C FCO - Floor clean out
LAWE BERHANU
Ø75 Ø75 Ø75
F.G. - Floor Gulley 4
CONSULTANT
3 3
4 W1 - Water Supply Riser
EMPLOYER
Jan Jan
Girls Ø75
Clean Urinal S1 - Waste Water Riser
Typical Manhole section Ø75
FD
Ø50 FD
Ø50
Ø75 Ø75
2 Ø110 Ø110 Ø110 2 Ø110 Ø110 Ø110
1000
500
Ø50 Ø50
D
1300
10
12000
INSTALLATION
Ø160 Ø160
nEsPRIMARYSCHOOL
DRAWING TITLE
PROJECT NAME
2700
MH SEPTIC TANK MH
Ø200 Ø200
GIRLS TOILET GROUND FLOOR WASTE WATER INSTALLATION BOYS TOILET GROUND FLOOR WASTE WATER INSTALLATION
SCALE 1:50 SCALE 1:50
DRAWING NUMBER
6 6
SN-02/02
A B C D E F G H