You are on page 1of 10

Operating instructions

SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC

G
F
E
D
H C
A
B

M
K
I

Table of contents:
Page
2 Safety references
3 General regulations / Intended use
/ Assembly
4 Cycle sequence/rinsing times
5 Digital clock/Prog. Back rinsing trigger time
Function film keyboard
6 Settings for back and clear rinsing duration
Setting for deceleration time
7 - 8 Electr. Connection
9 Board for E-3000/F2 - 24V
10 Exploded view

Ensuing damage due to neglect of the operating instructions or due to damaging sealed parts lead to a lapse
of the warranty. We do not take on liability for thus resulting damages! Please read the operating instructions
carefully before starting.

PRECISION - POWER - PROGRESS - PRODUCTION


Operating instructions
SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC

1. Safety Instructions:
• This equipment has been built and examined according to the safety precautions for electronic
devices and has left the plant in a perfect safety-related condition.
• To keep this status and to guarantee a safe operation, the user must
observe the safety instructions, which are included in these operating instructions.
• The installation work may only be undertaken by an authorized and licensed installer or
electrical business.
• The electrical installations must be carried out according to the respective local and regional
regulations (e.g. OEVE, VDE...) and possible official regulations.
• The electrical connection must have separating device built into the permanently installed
electrical installation, which enables the disconnection of all electrical contacts with a
contact space of minimum 3 mm from the mains.
• Pay attention that the supply voltage is correctly protected and an
earth-leakage circuit breaker < 30 mA is installed.
• Only use the equipment in dry rooms, in which no combustible gases and
vapors are present.
• Do not operate the equipment immediately if it has been taken from a cold into a warm area
The thereby developing condensation water could destroy your equipment
• If the equipment has visible damages doesn't work anymore or has been stored for longer
periods under adverse conditions then it is to be expected that a safe operation is not possible
anymore.
In this case the equipment is to be secured against unintentional start-up and if necessary to be
decommissioned.
• Live parts can be uncovered when opening the cover or removing parts.
Before an alignment, maintenance, a repair or a change of parts or devices, the equipment must
be separated from all voltage supplies, if opening the equipment is necessary. If after that an
alignment, maintenance or a repair on the opened equipment under voltage is inevitable, it may
only be done by experienced skilled personnel, who have knowledge of the associated dangers
and/or the relevant regulations.
• Capacitors in the equipment can be still charged, even if the equipment
is separated from all voltage supplies.
• Assembly and/or disassembly of the armature only in a pressure-free status (i.e. empty piping
beforehand).
• Armature flow and/or direction of flow must be considered!

PRECISION - POWER - PROGRESS - PRODUCTION


Page 2
Operating instructions
SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC
2. General:
PRAHER superstar controls are significant technical products, which are manufactured with high accuracy and according
to the most modern technical production methods. Entitled complaints will naturally be rectified as fast as possible if they
occur.
Warranty: According to “EU”-law. The warranty begins on the delivery day. The date is in the serial number on the rate
plate.

3. Intended use:
It is a control unit for a 6-way valve, with which a filter is fully automatically flushed by pressure application. A filter pump
connector is available, which when reaching the respective valve positions switches on delayed for approx.. 20 seconds.
Parallel there is also a potential-free signal. The dry operation protection ensures a safe operation of the plant.

Additional electrical connections are possible:


To position flush, to position back and clear rinse, for the serial connection of various valves, for the interruption of a heating
or heat exchanger before cycle start, for ball valve during the cycle

4. Assembly:
Equipment installation - installation of the valve
Integrate the valve into the piping according to the inscription and the following sketch. Use transition screw connections.
Seal threaded connections only with teflon band. The equipment is functional in any position, however if possible should
not be installed with the actuator downwards.

I FILTER V RINSE From the Filter


From the filter From the filter

Pump Drain Pump Drain


Pump Drain
PUMP from the pump
Basin
TOP to the filter
Basin
BOTTOM from the Filter
Return to the basin Basin
To the Filter To the Filter Waste to the Drain
II EMPTY
From the filter
To the Filter

Pump Drain
I : Filtration of medium (e.g. water):
Basin
pool - pump - valve (to the filter) - valve (from the filter) - pool

II : Drainlage of pool with pump:


To the Filter
pool - pump - valve - drain
III BACK RINSE
From the filter
III : Cleaning up filter medium (e.g. Sand) in upstream (reserved flow in filter):
Pump Drain
pool - pump - valve (from the filter) - filters - valve (to the filter) - waste

Basin V : Cleaning of filter medium (e.g. Sand) after backwash:


pool - pump - valve (to the filter) - filters - valve (from the filter) - waste
To the Filter

6 - way valve-type 1 1/2”, 2”, 3”


Connections: Thread or stick (all connectors open)
max. Operating pressure: ABS 1 1/2", 2": 3,5 bar ; GFK 1 1/2", 2": 6 bar; GFK 3": 5 bar

PRECISION - POWER - PROGRESS - PRODUCTION


Page 3
Operating instructions
SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC
5. Cycle sequence: Starting position "filter" - equipment ON
- Start of the back rinsing cycle
- Control light "test key" for back rinsing cycle running, lights up
- Output heating COM-NO switches to Com-NC control.
- Adjusted time of potentiometer 7 (deceleration time) runs off (cooling time for heat exchanger).
- Output pump COM-NO switches off
- Output serial connection switches from COM-NC to Com-NO
- Output ball valve switches from COM-NO to COM-NC
- Valve on back rinse
- Output back rinse/clear rinse COM-NC switches to COM-NO
- Pump deceleration time of approx. 20 seconds runs
- Output pump COM-NO closes
- Output back rinse COM-NC switches to COM-NO
- Adjusted time of potentiometer 6 runs (back rinsing time)
- Output pump COM-NO switches off
- Output back rinses switches from COM-NO to COM-NC
- Output back rinse, clear rinse switches from COM-NO to COM-NC
- Valve on clear rinse
- Output back rinse/clear rinse switches from COM-NC to COM-NO
- pump deceleration time of approx. 20 seconds runs
- Output pump COM-NO closes
- Adjusted time of potentiometer 5 runs (clear rinse)
- Output pump COM-NO switches off
- Output back rinse/clear rinse switches from COM-NO to COM-NC
- Valve on filter
- Output serial connection COM-NO switches to COM-NC
- Output ball valve switches from COM-NC to COM NC
- Pump deceleration time of approx. 20 seconds runs
- Output pump COM-NO closes
- Output heating switches from COM-NC to COM-NO

Rinsing times and changing over time:


Deceleration time 25 sec. - 23 min.

Transpose
approx. 45 sec.
Filter - back rinse

Back rinse 25 sec. - 11 min.

Transpose
approx. 35 sec.
Back rinse - clear rinse

Clear rinse 20 sec. - 3 min.

Transpose
approx. 25 sec.
Clear rinse - filters

Cycle period approx. 3 - 40 min.

PRECISION - POWER - PROGRESS - PRODUCTION


Page 4
Operating instructions
SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC
7. Adjusting the digital clock:

- attach equipment to line voltage


- with pointed article [ Res. ] - press key
- clock - keep key pressed and with Day - key select desired day
- clock - keep key pressed and with h+ - key select desired hour
- clock - keep key pressed and with m+ - key select desired minute
Programmable 20 times/week!
8. Program back rinsing time: When programming several back rinsing times
--> repeat aforementioned steps.
- Prog. - press key
- Manual - key ¤ press ‘ON’ - on display appears “ON-Time programmming”
- with Day - key select day (E)
- with h+ - key select hour
- with m+ - key select minute
(- with Manual - key programming time can be switched between ON and OFF)
- Prog. - press key
- Manual - key ¡ press ‘OFF’ - on display appears “OFF-Time programming”
- with Day - key select day (E)
- with h+ - key select hour
- with m+ - key select minute
- Prog. - --> press key program
Terminated

NOTE:
Trigger back rinsing program for max. 1 minute!

e.g.: ON ¤ 8:00
OFF ¡ 8:01
This product corresponds to the following EEC - Guidelines:

l Electromagnetic compatibility 89/336/EEC


l Low voltage directive 73/23/ EEC

9. Function:

1 OFF
Operating this key switches off the equipment, regardless of the position
of the valve.
2 ON
Operating this key switches on the equipment, the valve takes on
basic position - position "Filter" - (yellow control light shines)
3 2 1 4

3 TEST KEY
Operating this key triggers the back rinsing cycle for the length of a back rinse procedure (green
control light shines)

4 EMPTY
Operating this key sets the valve to position "Empty" (red control light shines)

PRECISION - POWER - PROGRESS - PRODUCTION


Page 5
Operating instructions
SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC
10. Adjust duration of back rinsing
The back rinsing time is adjusted with the potentiometer (rotary button) 6 .

- turn potentiometer
clockwise direction for a lengthy period 8
against clockwise direction short period 5

- triggering a back rinsing procedure


with the test key
- checking the back rinsing time 6

7
- repeat the sequence, until the
desired time is set.

10.1 Adjusting the clear rinsing duration

The clear rinsing time is adjusted with the potentiometer (rotary button) 5 .

- turn potentiometer
clockwise direction for a lengthy period
against clockwise direction short period

- trigging a back rinsing procedure with the test key


- checking the clear rinsing time

- repeat the sequence, until the desired time is adjusted.

10.2 Adjusting the deceleration time


The deceleration time can be stopped with the potentiometer (rotary button) 7 .

- turn the potentiometer


clockwise direction clockwise direction
against clockwise direction short period

- trigger a back rinsing procedure with the test key.


check the deceleration time
- repeat the sequence, until the desired time is adjusted.

PRECISION - POWER - PROGRESS - PRODUCTION


Page 6
Operating instructions
SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC
11. Electrical connections
a) Supply voltage connection:

L1 N 24 VAC, 50/60 Hz.

b) Connector for dry operation protection (float switch):

9 10 The clamps [ 9 ] and [ 10 ] are connected. If this


connection is interrupted, the pump is switched off.

c) Pump connection:

13 14 Zero potential: I max. 8 A


Switches to the positions filter, back rinse, clear rinse
NO COM
and empty approx. 30 sec. later.

d) Connection for ball valve:

6 G 2 Zero potential: I max. 8 A


In position filter G --> 6 is connected through .
NO COM NC
G --> 2 connected through, during entire
back rinsing cycle and position emptying.

e) Connection for 2. Back rinsing pump:

27 28 29 Zero potential: I max 4 A


NO COM NC
In position back rinse 28 --> 27 is connected through.
Switches only if pump is [ 13, 14 ] switched on.

f) Connection for signal on position back rinse and clear rinse:

24 25 26 Zero potential: I max 4 A


25 --> 24 connected through in position back rinse and clear
NO COM NC
rinse.
Switches independently of the pump to position back rinse
and clear rinse.

PRECISION - POWER - PROGRESS - PRODUCTION


Page 7
Operating instructions
SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC
g) connection for signal for heating/heat exchanger:

Zero potential: I max. 4 A


21 22 23 After triggering a back rinsing cycle 22 becomes --> 23
NO COM NC durchgeschaltet.
Filter pump remains for the duration of the adjusted deceleration time
(rotary button 7 ) switched on. Afterwards the pump switches off
(Heat exchanger cools down).

h) connection for signal for serial connection:

Zero potential: I max. 4 A.


During the entire cycle 19 is connected through -->18.
18 19 20 Connecting several valves:
NO COM NC

i) Push button switch input:

Trigger cycle EXTERNAL: Floating


Connection possibilities (SPS, push button switch...)
push button switch cycle strarts about 40 - 50 seconds later
(Pressure switch) (to compensate pressure peaks).

j) Trigger cycle EXTERNAL:

Zero potential: Note: trigger only short pulse.


(SPS, ...)

+ II Ch1

Serial connection for several valves

Valve 1 Valve 2 Valve 3

18 19 20 - + G CH2 CH1 18 19 20 - + G CH2 CH1 18 19 20

Technical data:
Voltage: 24 VAC Protective system: IP 54
Frequency: 50/60 Hz clock: approx. 1 month accu backup
max. Power consumption: approx. 4 Watts/12 Watts 1 1/2 “, 2"- approx. 4 Watts/20 Watts 3 "

PRECISION - POWER - PROGRESS - PRODUCTION


Page 8
Operating instructions
SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC
pump pressure sw gr gn 18 19 20
27 28 29 switch switch
BACKWASH Motor1 Serien-

LED
schaltung
Circuit diagram for
KLARSPÜL RINSE
ZEIT TIME
E-Type - 24VAC
25sec-

MotorKondensator
3min.
1,5" / 2" / 3"
R.4

MotorKondensator
- +

SEQUENCING
RÜCKSPÜL BACKWASH

Serie
ZEIT TIME
25sec- VERZÖGERUNG C3
RÜCKSPÜLEN

R
BACKWASH

R.6
11min. DELAY R.3
- + DELAY C2
Rückspülen Praher
Backwash LP004.0370.01.A
Klarspülen
Rinse 21 22 23
VERZÖG.-ZEIT 3 4 S14K35

DELAY TIME G
25sec- SS
S
S

23min

GLD1
-5
G

GL
1 D ™

SS-5
- +

Filtern
E-Prom

1
Parkstellung

LD

Filter
G
-5

G
SS

S
Ventil-

Entleeren SS-5 5
GL
Drain D1
RÜCKSPÜLEN 1,5" / 2" = 500mA T
24 25 26
Steuersicherung

Digital Uhr/ Clock KLARSPÜLEN


MIL 72E Analog BACKWASH


Control-Fuse
S
G

3" = 1,6A T
12VDC Clock

- RINSE BACKWASH R.5


CH1
CH2

+ G RINSE

E-6000/F E-3000/F
Anschlußplan für
AKKU MIL 72E Analog-12VCD
Clock

MO
Uhr

14:28
2
1 braun
3

4
Ballvalve
Kugelhahn

CH1 CH2
24V~ 3VA
Relais-

OFF OFF
Relais-
max.8A

max.8A
Pump

weiß
grau

grün
Pumpe

Day h+ m+

CH1 CH2 H1 H2
-
+

CH1
G

+1h Res.

sw gr gn L1 N
Digi-Uhr 2Kanal Motor 2
NETZ

CH1= Kanal1=Rückspülzyklus
6 G 2 13 14 9 10 CH1= Kanal1= Backwash 24V~
Ausgang- Ausgang- CH2= Kanal2=Filterpumpe Motor2 nur Versorgungs-
Pumpe Niveau- CH2= Kanal2=Filterpumpe spannung
Kugelhahn bei Ventil 3" Electricity
Output Schalter
Output Pump Level supply
pot.frei pot.frei Switch 24V~50-60Hz

PRECISION - POWER - PROGRESS - PRODUCTION


Page 9
Operating instructions
SUPERSTAR E-3000 / F2
for 1 1/2", 2"and 3" 24 VAC

R
SU
PE
R
ST
A
R
1

2
12
7 4 3

6
13
QUALITY
R

SERVICE

INNOVATION

PRÜFTASTE EIN AUS ENTLEEREN


8
TESTBUTTON ON OFF DRAIN

10
9
1 1. Deckel
Cover
2 2.
SealDichtung (Moosgummi)
(foam rubber)
3 3.
Control switch
Steuerkopf
4 4.
Curve gear wheel
Kurvenzahnrad
5 5.
Motor
Motor
6 6.
Control board
Steuerplatine
7 Pump limit switch
7. Pumpenendschalter
8 Automatic lower part
8. Automatikunterteil
9 Mounted screw connection
9. Anbauverschraubung
10 Clutch
11 10. Kupplung
11 Valve
11.Back
12 Ventilrinsing clock
12.Film
13 Rückspüluhr
keyboard
13. Folientastatur

PRAHER VALVES
Tel.: ++ 43 / ( 0 ) 72 62 / 61 178 - 0*
Fax: ++ 43 / ( 0 ) 72 62 / 61 203
austria@praher.com ; www.praher.com

Page 10
© by PRAHER, Austria

You might also like