I.

Site Determination:
a. Location:
i. Minimum, average and maximum ambient temperature (C)
ii. Max. wet bulb temperature (C)
iii. Max. wind load (m/s)
iv. Amount of annual rainfall (mm), typhoon frequency occurrence
v. Earthquake factor (Mercalli)
vi. Surrounding air condition (salty sea area, pollution by neighbors, sandy, dusty due to
streets)
vii. Noise level (decibel)
viii. Power supply (Voltage, freq.)
b. Source of good water supply for plant use:
i. What is the source of water and the analysis of the water from the source?
(Deep well, surface or city water?) How much is the cost per cu. meter?
ii. What is the water temperature?
iii. Should water saving method and recuperating system be considered?
c. Power supply source:
i. Can it be supplied directly from TRANSCO Grid or by a local utility company?
ii How much is the cost per kW-hr?
d. Fuel supply:
i. What type of fuel should be used for steam system? Cost per liter?
ii. If there is a centralized gas supply system, what is the type of gas and can it be used for
steam system and how much is the cost per kg?
e. Waste disposal and Pollution Control system:
i. Required waste water effluent parameters for disposal and cost per cu. meter?
ii. Do we need to install our own waste water treatment plant?
iii. Air pollution control requirement for chimney, etc?
iv. Solid waste disposal system for spent grain, spent yeast, etc.
f. Available Local Skilled labor force
g. Availability of transportation to and from site
h. Raw material source
i. Community facilities
k. Other factors (road network, Mun.taxes, etc)
II. Site Survey
a. Soil Investigation
b. Topography Determination
c. Geo-Hazard Study and Ground Penetration Radar (If required)

III. Application for Construction


a. Zoning Approval,
b. Environmental Compliance Certification
c. What are the gov’t. permits required for construction of a new brewery?
d. Local Design Criteria requirement, if any:
i. Building Layout/Construction
ii. Process Technology & equipment requirement:
- What energy conservation capability is needed?
- Degree of automation
iii. Flexibility (plant can be open to future changes, expansion and modernization at minimum
disturbance)
iv. Working Environment
v. Aesthetic requirement
vi. Logistic (road network requirement, etc.)
RLL 082020