A hotel housekeeper was observed five times on each of four task elements shown in
the following table.
OBSERVATION IN MINUTES
ELEMENT 1 2 3 4 5 PR %
Compute the Mean Time for each element and the OT, NT, ST, given an allowance job
time of 15%
ELEMENT OT NT ST
Check minibar (0.44 + 0.50 + 0.43 + 0.46 * 90% = 0.41 0.41 * (1 + 0.15) =
0.45 + 0.48) / 5 = 0.46 0.48
Make bed (1.50 + 1.54 + 1.47 + 1.50 * 85% = 1.28 1.28 * (1 + 0.15) =
1.51 + 1.49) / 5 = 1.50 1.47
Vacuum floor (0.84 + 0.89 + 0.77 + 0.84 * 110% = 0.92 0.92 * (1 + 0.15) =
0.83 + 0.85) / 5 = 0.84 1.06
Clean bath (1.10 + 1.14 + 1.08 + 1.14 * 100% = 1.14 1.14 * (1 + 0.15) =
1.20 + 1.16) / 5 = 1.14 1.31
Problem 2. Given the table below,
Compute for the OT, NT and ST assuming and allowance factor of 15% of job time.
Elements PR 1 2 3 4 5 6
1 110% 1.20 1.17 1.16 1.22 1.24 1.15
Elements OT NT ST
How many observations would be needed to estimate the mean time for element
2 within 1% of its true value with 95% level of confidence?
TIME MEAN SQ DIFFERENCE
0.83 0.83 0
0.87 0.83 0.87 – 0.83 = 0.042 = 0.0016
0.78 0.83 0.78 – 0.83 = -0.052 = 0.0025
0.82 0.83 0.82 – 0.83 = -0.012 = 0.0001
0.85 0.83 0.85 – 0.83 = 0.022 = 0.0004
TOTAL 0.0046
AF = 1% or 0.01
Level of confidence = 95% = 1.96
Standard deviation = √0.0046 / 5 = 0.03
n = (zs/a*xbar)2
n = ((1.96 * 0.03) / (0.01 * 0.83))2
n = 50.18 or 51 observations