JOB NO PC-90-22 GF 29/31 THE EMPORER COMPLEX FATEGUNJ MAIN

CLIENT BRIGHT PHARMA FABRICATION STEEL QUANTITY ROAD,VADODARA


Mob:9979877931 Email:
jaineshbhavsar@gmail.com
DATE 12/10/2022

SR NO DESCRIPTION NO NOS OF MEMBERS L B H UNIT WT. TOTAL WT UNIT

1 BASE PLATE
COLUMN
MAIN COLUMN (ISMC 250) 50 1 0.7 0.4 0.02 7850 2198.00
GABLE END (ISMC 150) 16 1 0.5 0.3 0.02 7850 376.80
GABLE END (ISMB 250) 10 1 0.4 0.25 0.016 7850 125.60
FOR COLUMN FOUNDATION BOLT
MAIN COLUMN (ISMC 250) 50 10 1 500 2.47 1234.57
GABLE END (ISMC 150) 16 8 1 128 2.47 316.05
GABLE END (ISMB 250) 10 4 1 40 1.58 63.21

stifnner & gusset Plate

MAIN COLUMN (ISMC 250) 50 2 0.7 0.2 0.012 7850 1318.80


50 8 0.05 0.075 0.012 7850 141.30

GABLE END (ISMC 150) 16 2 0.5 0.2 0.012 7850 301.44


16 4 0.05 0.075 0.012 7850 22.61

GABLE END (ISMB 250) 10 2 0.25 0.2 0.012 7850 94.20


10 4 0.05 0.075 0.012 7850 14.13

2 MAIN COLUMN (ISMC 250)


2MC250 COLUMN 50 2 13.815 1381.5 30.4 41997.60

PLATES
ANGLE 50X50X6 50 2 18.81 1881 4.5 8464.50
BRACKET PLATE 1 50 2 0.61 0.2 0.012 7850 1149.24
BRACKET PLATE 2 50 1 0.45 0.35 0.012 7850 741.83
CAP AND SHOE 50 2 0.4 0.4 0.012 7850 1507.20

3 GABLE END (ISMC 150)


2MC150 COLUMN 16 2 13.9 444.8 16.4 7294.72

PLATES
ANGLE 50X50X6 10 2 10 200 4.5 900.00
ANGLE 50X50X6 6 2 11.95 143.4 4.5 645.30
BRACKET PLATE 1 16 2 0.55 0.2 0.012 7850 331.58
BRACKET PLATE 2 16 1 0.45 0.3 0.012 7850 203.47
CAP AND SHOE 16 2 0.35 0.3 0.012 7850 316.51
MB250 GABLE END 10 1 13.4 134 37.3 4998.20

MB200 CAP/SHOE 10 2 0.4 0.25 0.012 7850 188.40

4 CRANE BEAM
10 TON EOT
MB300 0 1 64.54 0 44.2 0.00
MC200 0 1 64.54 0 22.1 0.00

5 M.S RAFTER
MB250 BEAM 1 1 667.4 667.4 37.3 24894.02

6 ROOF PURLIN
TUBE 100X50X3.2 33 1 57 1881 7.01 13185.81
TUBE 100X50X3.2 12 1 29 348 7.01 2439.48
TUBE 100X50X3.2 6 1 45.5 273 7.01 1913.73
CLEAT 75X75X6 475 1 0.25 118.75 6.8 807.50

7 SIDE WALL PURLIN


SIDE WALL
TUBE 100X50X3.2 8 2 64.1 1025.6 7.01 7189.46
MC75 80 2 0.365 58.4 6.8 397.12

GABLE END BACK SIDE


TUBE 100X50X3.2 8 2 61.35 981.6 7.01 6881.02
MC75 80 2 0.37 59.2 6.8 402.56
TUBE 100X50X3.2 8 1 45.46 363.68 7.01 2549.40
MC75 80 1 0.37 29.6 6.8 201.28

BRACING
ISA 75X75X6 0 1 720 0 7.01 0.00
PLATE

8 DECK
MAIN MB500 0 1 54 0 86.9 0.00
MB500 LONG 0 1 64.54 0 86.9 0.00
MB400 0 2 54 0 61.6 0.00
MB150 0 4 64.54 0 14.9 0.00
DECK SHEET 0 54 64.54 3485.16 9.42 32830.21 32.83

CONSIDER WASTAGE 3%

TOTAL KG 168.64 MT

NOTE:
1. ROOF SHEET , TURBO AND POLY SHEED NOT COVERED ABOVE
2. ALL ACCESSORIES NOT COVERED ABOVE
GF 29/31 THE EMPORER COMPLEX FATEGUNJ MAIN
FABRICATION STEEL QUANTITY ROAD,VADODARA
Mob:9979877931 Email:
DATE 12/28/2022 jaineshbhavsar@gmail.com

SR NO DESCRIPTION NO NOS OF MEMBERS L B H UNIT WT. TOTAL WT UNIT

1 BASE PLATE
PLATE 500X310X24 7 1 0.5 0.31 0.024 7850.00 204.41

2 STIFF. PLATE
PLATE 150X100X8 7 2 0.15 0.1 0.008 7850.00 13.19
PLATE 150X80X8 7 2 0.15 0.08 0.008 7850.00 10.55
3 COLUMN-RAFTER CONNECTION
PLATE 1(DET-A) 6 2 0.307 0.3 0.01 7850.00 86.76
PLATE 2(DET-A)(SEC 3-3) 7 2 0.5 0.35 0.02 7850.00 384.65
PLATE 3(DET-B) 1 2 0.2 0.325 0.01 7850.00 10.21
BEND PLATE 4(DET-B)(SEC 4-4) 1 2 0.26 0.16 0.006 7850.00 3.92
STIFF PLATE 4(DET-B)(SEC 4-4) 1 2 0.184 0.064 0.006 7850.00 1.11
SAG RODS 72 1 1.595 114.84 1.58 181.4472
NO NOS OF MEMBERS L TL UNIT WT. TOTAL WT
4 RAFTER
TUBE 300X150X10 3 1 10.1 30.3 65.49 1984.347
5 COLUMN
TUBE 300X150X10 7 1 7.27 52.81 65.49 3458.5269
6 SIDE WALL PURLIN
SR1 8 1 4.002 32.016 12.7 406.6032
SR2 8 1 3.519 28.152 12.7 357.5304
SR3-1 8 1 2.46 19.68 12.7 249.936
SR3-2 8 1 2.46 19.68 9.2 181.056
FOR GRID 3 8 1 5.117 40.936 12.7 519.8872
CLEAT (DET-E) BENT PLATE 7 1 0.495 0.13 0.006 7850 21.216195
STIFF. PLATE 7 1 0.389 0.094 0.006 7850 12.0558102
BENT PLATE 2 1 0.453 0.13 0.006 7850 5.547438
STIFF. PLATE 2 1 0.347 0.094 0.006 7850 3.0726156
7 ROOF PURLIN
P1 10 1 3.982 39.82 12.7 505.714
P2 10 1 3.519 35.19 12.7 446.913
P3 10 1 2.47 24.7 12.7 313.69
P3 10 1 2.47 24.7 9.2 227.24
ISA 50X50X3 2 1 4.65 9.3 2.3 21.39
CLEAT BENT PLATE 24 1 0.26 0.13 0.006 7850 38.20752
STIFF. PLATE 24 1 0.184 0.064 0.006 7850 13.3115904
8 HORIZONTAL BRACING AT ROOF
PIPE NB 90 DIA. 4 1 4.889 19.556 9.63 188.32428
DET-C PLATE 270X140X8 8 1 0.27 0.14 0.008 7850 18.99072
PLATE 235X235X8 8 1 0.235 0.235 0.008 7850 27.74504
DET-D
PLATE 480X170X8 2 1 0.48 0.17 0.008 7850 10.24896
PLATE 270X140X8 2 2 0.27 0.14 0.008 7850 9.49536
9 VERTICAL BRACING
PIPE NB 90 DIA. 8 1 1.9 15.2 9.63 146.376
PIPE NB 90 DIA. 4 1 4.284 17.136 9.63 165.01968
DET-F
PLATE 237X236X8 8 1 0.237 0.236 0.008 7850 28.1002368
PLATEV270X140X8 8 1 0.27 0.14 0.008 7850 18.99072
DET-G
PLATE 445X170X8 4 1 0.445 0.17 0.008 7850 19.00328
PLATEV 270X140X8 4 2 0.27 0.14 0.008 7850 18.99072
DET-H
PLATE 630X236X8 4 1 0.63 0.236 0.008 7850 37.348416
PLATEV 270X140X8 4 2 0.27 0.14 0.008 7850 18.99072
10 GI GUTTER
DET-I
RUNNER 75X75X6 1 1 20 20 6.8 136
BOX 250X250X3 1 1 20 20 30.57 611.4
FLAT 430X60X6 40 1 0.43 0.06 0.006 7850 48.6072
FLAT 1094X60X7 40 1 1.094 0.06 0.006 7850 123.66576

CONSIDER WASTAGE 3% 3% 338.69 KG

TOTAL KG 11289.78 KG
11 COVER SHEET NO LENTH BREADTH AREA
ROOF 1 10.5 12.65 132.825 M2
SIDE RUNNER 1 35.51 8.9 316.039 M2
TOTAL AREA OF COVER SHEET 448.86 M2
LINTEL BEAM

Sr. no. Particular Shape of Bar


L B H

1 LB1 (SIZE IN METER) 6.175 0.230 0.230



Number of beams 16.000 0.250

0.250

Extra top bars 0.250

→ STIRRUPS

0.180

→ CHAJJA

CHIPPIYA 0.150

DISTRIBUTION BARS

GROUND BEAM

Sr. no. Particular Shape of Bar


Sr. no. Particular Shape of Bar
L B H

1 GB1 (SIZE IN METER) 6.175 0.230 0.300



Number of beams 16.000 0.250

0.250

Extra top bars 0.250

→ STIRRUPS

0.250

2 GB1 6.025 0.230 0.400



Number of beams 4.000 0.250

0.250

Extra top bars 0.250

→ STIRRUPS

0.350
3 GB1 6.000 0.230 0.400

Number of beams 2.000 0.250

0.250

Extra top bars 0.250

→ STIRRUPS

0.350

4 GB2 1.315 0.230 0.450



Number of beams 0.000 0.250

0.250

Extra top bars 0.250

→ STIRRUPS

0.400

FOOTING

Sr. no. Particular Shape of Bar


Sr. no. Particular Shape of Bar
L B H

1 F1 1.500 1.750 0.450


0.150
Number of foundation 18.000

0.150

2 F2 1.500 1.500 0.450


0.150
Number of foundation 4.000

0.150

3 F3 1.000 1.000 0.230


0.150
Number of foundation 0.000

0.150

COLUMN
Sr. no. Particular Shape of Bar
Sr. no. Particular Shape of Bar
L B H
1 C1 ( SIZE IN MM) 500 400 2150
→ SIZE IN METER 0.500 0.400 2.150

Number of column 18.000


2.076

→ TIES TYPE 1 (FULL)

1-SET 0.320

→ TIES TYPE 2
1-SET
0.320

LINK TYPE 1
1-SET

0.420

2 C2 ( SIZE IN MM) 300 350 2150


→ SIZE IN METER 0.300 0.350 2.150

Number of column 4.000


2.076

→ TIES TYPE 1 (FULL)


1-SET 0.270

LINK TYPE 1
1-SET

0.220

LINK TYPE 1
1-SET

0.270

3 C3 ( SIZE IN MM) 230 230 2370


→ SIZE IN METER 0.230 0.230 2.370

Number of column 0.000


2.296

→ TIES TYPE 1 (FULL)

1-SET 0.150

4 C3 ( SIZE IN MM) 230 230 3000


→ SIZE IN METER 0.230 0.230 3.000

Number of column 22.000


2.926
→ TIES TYPE 1 (FULL)

1-SET 0.150

COPING BEAM

Sr. no. Particular Shape of Bar


L B H

1 CB1 (SIZE IN METER) 138.640 0.230 0.100



Number of beams 1.000 0.250

0.250

7 TRIMIX FLOOR STEEL 2400 KG

UPTO FFL TOTAL STEEL 3203.168 KG


TOTAL STEEL 3.203 TON
ABOVE FFL TOTAL STEEL 1631.382 KG
TOTAL STEEL 1.631 TON
Shape of Bar Dia of Bar in mm No. of bar No. of item

6.125 0.250 12 2 16

6.125 0.250 12 3 16

3.063
0 2 16

0.180
0.075 8 42 16
0.075 0.180

0.180

0.530 10 15 16
0.100
0.530
8 4 16
2.113

Shape of Bar Dia of Bar in mm No. of bar No. of item


Shape of Bar Dia of Bar in mm No. of bar No. of item

6.125 0.250 12 3 16

6.125 0.250 12 4 16

3.063
12 0 16

0.180
0.075 8 42 16
0.075 0.250

0.180

5.975 0.250 12 3 4

14.938 0.250 12 4 4

7.469
12 0 4

0.180
0.075 8 41 4
0.075 0.350

0.180
5.950 0.250 12 3 2

5.950 0.250 12 4 2

2.975
0 2 2

0.180
0.075 8 41 2
0.075 0.350

0.180

1.265 0.250 12 3 0

1.265 0.250 12 3 0

0.633
0 1 0

0.180
0.075 8 10 0
0.075 0.400

0.180

Shape of Bar Dia of Bar in mm No. of bar No. of item


Shape of Bar Dia of Bar in mm No. of bar No. of item

10 12 18
0.150
1.400

10 10 18
0.150
1.650

10 10 4
0.150
1.400

10 10 4
0.150
1.400

10 7 0
0.150
0.900

10 7 0
0.150
0.900

Shape of Bar Dia of Bar in mm No. of bar No. of item


Shape of Bar Dia of Bar in mm No. of bar No. of item

0.100
12 10 18
12 0 18

0.450

0.420
0.075 8 15 18
0.075 0.320

0.420

0.270
0.075 8 15 18
0.075 0.320

0.270

0.075 8 15 18

0.075

0.100
12 8 4
12 0 4

0.450

0.220
0.075 8 15 4
0.075 0.270

0.220

0.075 8 15 4

0.075

0.075 8 15 4

0.075

0.100
12 8 0
12 0 0

0.450

0.150
0.075 8 16 0
0.075 0.150

0.150

0.100
12 8 22
12 0 22
0.450

0.150
0.075 8 21 22
0.075 0.150

0.150

Shape of Bar Dia of Bar in mm No. of bar No. of item

138.590 0.250 10 2 1

138.590 0.250 10 2 1
Total wt
Spacing in mtr Length in mtr Total length in mtr 8mm
(0.395
kg/mt)

6.625 212.000 -

6.625 318.000 -

3.313 106.000 -

0.150 0.870 584.640 230.933

0.150 1.310 314.400 -

2.113 135.232 53.417

TOTAL 284.349
GRAND TOTAL

Spacing in mtr Length in mtr Total length in mtr


Total wt
Spacing in mtr Length in mtr Total length in mtr 8mm
(0.395
kg/mt)

6.625 318.000 -

6.625 424.000 -

3.313 0.000 -

0.150 1.010 678.720 268.094

6.475 77.700 -

15.438 247.000 -

7.719 0.000 -

0.150 1.210 198.440 78.384


6.450 38.700 -

6.450 51.600 -

3.225 12.900 -

0.150 1.210 99.220 39.192

1.765 0.000 -

1.765 0.000 -

0.883 0.000 -

0.150 1.310 0.000 -

TOTAL 385.670
GRAND TOTAL

Spacing in mtr Length in mtr Total length in mtr


Total wt
Spacing in mtr Length in mtr Total length in mtr 8mm
(0.395
kg/mt)

0.150 1.700 367.200 -

0.150 1.950 351.000 -

0.150 1.700 68.000 -

0.150 1.700 68.000 -

0.150 1.200 0.000 -

0.150 1.200 0.000 -

TOTAL
GRAND TOTAL

Spacing in mtr Length in mtr Total length in mtr


Total wt
Spacing in mtr Length in mtr Total length in mtr 8mm
(0.395
kg/mt)
2.626 472.680 -
2.526 0.000 -

0.150 1.630 440.100 173.840

0.150 1.330 359.100 141.845

0.000 0.570 153.900 60.791

2.626 84.032 -
2.526 0.000 -
0.150 1.130 67.800 26.781

0.000 0.370 22.200 8.769

0.000 0.420 25.200 9.954

2.846 0.000 -
2.746 0.000 -

0.150 0.750 0.000 -

3.476 611.776 -
3.376 0.000 -
0.150 0.750 346.500 136.868

TOTAL 421.979
GRAND TOTAL 917.452

Total wt
Spacing in mtr Length in mtr Total length in mtr 8mm
(0.395
kg/mt)

139.090 278.180 -

139.090 278.180 -
TOTAL 0.000
GRAND TOTAL 3
TOTAL 4428.291
GRAND TOTAL
Weight in Kg
Total Total
Total wt Total wt Total wt
wt wt
10mm 12mm 16mm
20mm 25mm
(0.617 (0.89 (1.58
(2.47 (3.85
kg/mt) kg/mt) kg/mt)
kg/mt) kg/mt)

- 188.680 - - -

- 283.020 - - -

- - - - -

- - - - -

193.985 - - - -

- - - - -

193.985 471.700 0.000 0.000 0.000


950.034
Weight in Kg
Total Total
Total wt Total wt Total wt
wt wt
10mm 12mm 16mm
20mm 25mm
(0.617 (0.89 (1.58
(2.47 (3.85
kg/mt) kg/mt) kg/mt)
kg/mt) kg/mt)

- 283.020 - - -

- 377.360 - - -

- - - - -

- - - - -

- 69.153 - - -

- 219.830 - - -

- - - - -

- - - - -
- 34.443 - - -

- 45.924 - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

0.000 1029.730 0.000 0.000 0.000


1415.400

Weight in Kg
Total wt Total wt Total wt Total wt
Total wt
10mm 16mm 20mm 25mm
12mm
(0.617 (1.58 (2.47 (3.85
(0.89 kg/mt)
kg/mt) kg/mt) kg/mt) kg/mt)

226.562 - - - -

216.567 - - - -

41.956 - - - -

41.956 - - - -

- - - - -

- - - - -

527.041 0.000 0.000 0.000 0.000


527.041

Weight in Kg
Total Total
Total wt Total wt Total wt
wt wt
10mm 12mm 16mm
20mm 25mm
(0.617 (0.89 (1.58
(2.47 (3.85
kg/mt) kg/mt) kg/mt)
kg/mt) kg/mt)
- 420.685 - - -
- - - - -

- - - - -

- - - - -

- - - - -

- 74.788 - - -
- - - - -
- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

- - - - -

- 544.481 - - -
- - - - -
- - - - -

0.000 495.474 0.000 0.000


681.348

Weight in Kg
Total Total
Total wt Total wt Total wt
wt wt
10mm 12mm 16mm
20mm 25mm
(0.617 (0.89 (1.58
(2.47 (3.85
kg/mt) kg/mt) kg/mt)
kg/mt) kg/mt)

171.637 - - - -

171.637 - - - -
343.274 0.000 0.000 0.000
343.274
2267.672 4276.236 0.000 0.000 0.000
10972.200
CHANNI GF 29/31 THE EMPORER COMPLEX
FATEGUNJ MAIN ROAD,VADODARA
TOTAL AREA FABRICATION STEEL QUANTITY Mob:9979877931
Email:
DATE 1/21/2023 jaineshbhavsar@gmail.com

SR NO DESCRIPTION NO NOS OF MEMBERS L B H TL UNIT WT. TOTAL WT UNIT (KG)

1 BASE PLATE 1
PLATE 500X350X20 18 1 0.5 0.35 0.02 7850.00 494.55
STIFF PLATE 1
PLATE 500X200X10 18 2 0.5 0.2 0.01 7850.00 282.6
STIFF PLATE 2
PLATE 75X75X10 18 4 0.075 0.075 0.01 7850.00 31.7925
2 BASE PLATE 2
PLATE 300X350X20 4 1 0.3 0.35 0.02 7850.00 65.94
STIFF PLATE 3
PLATE 350X200X10 4 2 0.35 0.2 0.01 7850.00 43.96
STIFF PLATE 4
PLATE 50X75X10 4 4 0.05 0.075 0.01 7850.00 4.71
3 CAP & SHOE PLATE 1
PLATE 500X350X10 18 2 0.5 0.35 0.01 7850.00 494.55
4 CAP & SHOE PLATE 2
PLATE 300X400X10 4 2 0.3 0.4 0.01 7850.00 75.36
5 COLUMN
TUBE 300X150X6 18 1 6 - - 108 40.53 4377.24
6 GABLE END COLUMN
TUBE 200X100X4 4 1 6.7 - - 26.8 18.01 482.668
7 RAFTER
TUBE 300X150X6 9 1 19.204 - - 172.836 40.53 7005.04308
TUBE 300X150X6 9 1 3 27 40.53 1094.31
PLATE 400X200X10 18 1 0.4 0.2 0.01 7850.00 113.04
8 ROOF PURLIN
TUBE 80X40X3.2 16 1 50.25 - - 804 5.5 4422
CLEAT MC 75 16 9 0.2 - - 28.8 6.8 195.84
9 SIDE PURLIN
TUBE 80X40X3.2 6 1 50.25 - - 301.5 5.5 1658.25
CLEAT MC 75 54 1 0.6 - - 32.4 6.8 220.32
ISA 50X50X6 54 1 0.075 - - 4.05 4.5 18.225
10 GABLE END PURLIN
TUBE 80X40X3.2 6 1 19.09 - - 114.54 5.5 629.97
CLEAT MC 75 24 1 0.6 - - 14.4 6.8 97.92
ISA 50X50X6 24 1 0.075 - - 1.8 4.5 8.1

COSIDER WASTAGE 5% 1090.81943


TOTAL WEIGHT 22907.208 KG

11 COVER SHEET NO LENTH BREADTH AREA


ROOF 1 50.25 19.09 959.2725 M2
SIDE 2 50.25 3.9 195.975 M2
GABLE END 2 19.09 3.9 74.451 M2
TOTAL AREA OF COVER SHEET 1229.6985 M2
OUT/OUT
BUILDING NO L B GF AREA FF AREA SF AREA
PART 1 1 50.26 19.06 957.9556
PART 2 0 20 25 0
PART 3 0 25 25 0
PART 4 0 12 23 0
PART 5 0 15 17 0
OTTA 0 20 22 0
OTTA 0 23 24 0
DEDUCTION 0 10 10 0
DEDUCTION 0 10 10 0

TOTAL 957.9556 0 0

FOUNDATION RCC SIZE COLUMN


Building T No L B t T b l COLUMN
F1 18 1.5 1.75 0.23 0.45 0.5 0.4 C1
F2 4 1.5 1.5 0.23 0.45 0.3 0.35 C2
F3 0 1 1 0.23 0.23 0.23 0.23 C3
F4 0 2.1 2.5 0.23 0.6 0.3 0.6 C4
F5 0 2.4 2.6 0.23 0.6 0.3 0.6 C5
F6 0 2.1 2.5 0.23 0.6 0.3 0.6 C6
F7 0 2.4 2.6 0.23 0.6 0.3 0.6 C7
F8 0 2.1 2.5 0.23 0.6 0.3 0.6 C8
F9 0 2.4 2.6 0.23 0.6 0.3 0.6 C9
F10 0 2.1 2.5 0.23 0.6 0.3 0.6 C10
F11 0 2 2 0.3 0.6 0.3 0.6 C11
LIFT 0 2.1 2.5

Base to Plinth to Gf to
EXTRA CO NO b l Plinth ht gf ht FF ht
FC1 22 0.23 0.23 0.6 3 0
FC2 0 0.23 0.23 2.3 1 0
FC3 0 0.23 0.23 2.3 1 1
FC4 0 0.23 0.23 2.3 1 1

FFL
TRIMIX FLOOR 0.125 m
PCC FLOOR 0.1 m
METAL 1.2 m 0.2 m
PACT SOIL 0.775 m
NGL

2
2.2 m M

PCC 0.1
SAND 0.1
METAL 0
MEASURMENT SHEET
Item No. Description Nos. Length Width Height Quantity Total

1 Surface dressing
No l b
Area 1 1 50.26 19.06 957.9556
Area 2 0 10 10 100
Area 3 0 10 10 100
Area 4 0 10 10 100

1257.956
TOTAL 1257.956

2 Excavation
A Excavation 0.0 to 1.5m d
F1 18 2.3 2.55 1.5 158.355
F2 4 2.3 2.3 1.5 31.74
F3 0 1.8 1.8 1.5 0
F4 0 2.9 3.3 1.5 0
F5 0 3.2 3.4 1.5 0
F6 0 2.9 3.3 1.5 0
F7 0 3.2 3.4 1.5 0
F8 0 2.9 3.3 1.5 0
F9 0 3.2 3.4 1.5 0
F10 0 2.9 3.3 1.5 0
F11 0 2.8 2.8 1.5 0
LIFT 0 2.9 3.3 1.5 0

190.095

For GB
No L B t
GB1 1 100.4 0.38 0.225 8.5842
GB1 1 38.12 0.38 0.225 3.25926
GB2 0 6.8 0.38 0.225 0
GB4 0 15 0.65 0.225 0
GB5 0 15 0.65 0.225 0

11.84346
TOTAL 201.9385

B Excavation 1.5 to 3.0m

F1 18 2.3 2.55 0.7 73.899


F2 4 2.3 2.3 0.7 14.812
F3 0 1.8 1.8 0.7 0
F4 0 2.9 3.3 0.7 0
F5 0 3.2 3.4 0.7 0
F6 0 2.9 3.3 0.7 0
F7 0 3.2 3.4 0.7 0
F8 0 2.9 3.3 0.7 0
F9 0 3.2 3.4 0.7 0
F10 0 2.9 3.3 0.7 0
F11 0 2.8 2.8 0.7 0
LIFT 0 2.9 3.3 0.7 0

88.711

TOTAL 88.711

3 Back Filling

A. Back Filling in foundation excavation


Available good earth 290.6495
Deduction
1. Foundation -18.86936
2.PCC -14.875
3.Sand -14.875
4.Metal 0
5.Rcc Pedestal/Column upto GL -11.75328

230.2768

TOTAL 230.2768

B. Brought from outside for Plinth

PART 1 1 49.8 18.6 0.775 717.867


PART 2 0 19.54 24.54 0.775 0
PART 3 0 24.54 24.54 0.775 0
PART 4 0 11.54 22.54 0.775 0
PART 5 0 14.54 16.54 0.775 0
OTTA 0 19.54 21.54 0.775 0
OTTA 0 22.54 23.54 0.775 0
DEDUCTION 0 9.54 9.54 0.775 0
DEDUCTION 0 9.54 9.54 0.775 0
Soil availab 1 60.37264
657.4944

TOTAL 657.4944

4 PCC
A FOUNDATION
F1 18 2.5 2.75 0.1 12.375
F2 4 2.5 2.5 0.1 2.5
F3 0 2 2 0.1 0
F4 0 3.1 3.5 0.1 0
F5 0 3.4 3.6 0.1 0
F6 0 3.1 3.5 0.1 0
F7 0 3.4 3.6 0.1 0
F8 0 3.1 3.5 0.1 0
F9 0 3.4 3.6 0.1 0
F10 0 3.1 3.5 0.1 0
F11 0 3 3 0.1 0
LIFT 0 3.1 3.5 0.1 0

14.875

B For GB
B t
GB1 1 100.4 0.45 0.1 4.518
GB2 1 38.12 0.45 0.1 1.7154
GB3 0 6.8 0.45 0.1 0
GB4 0 15 0.45 0.1 0
GB5 0 15 0.45 0.1 0

6.2334

C For PB
No L B t
PB1 0 73.15 0.45 0.1 0
PB2 0 20 0.45 0.1 0
PB3 0 12 0.45 0.1 0
PB4 0 14 0.45 0.1 0
PB5 0 15 0.45 0.1 0

D Floor
PART 1 1 49.8 18.6 0.1 92.628
PART 2 0 19.54 24.54 0.1 0
PART 3 0 24.54 24.54 0.1 0
PART 4 0 11.54 22.54 0.1 0
PART 5 0 14.54 16.54 0.1 0
OTTA 0 19.54 21.54 0.1 0
OTTA 0 22.54 23.54 0.1 0
DEDUCTION 0 9.54 9.54 0.1 0
DEDUCTION 0 9.54 9.54 0.1 0

92.628

TOTAL 113.7364

5 SAND FILLING
FOUNDATION
F1 18 2.5 2.75 0.1 12.375
F2 4 2.5 2.5 0.1 2.5
F3 0 2 2 0.1 0
F4 0 3.1 3.5 0.1 0
F5 0 3.4 3.6 0.1 0
F6 0 3.1 3.5 0.1 0
F7 0 3.4 3.6 0.1 0
F8 0 3.1 3.5 0.1 0
F9 0 3.4 3.6 0.1 0
F10 0 3.1 3.5 0.1 0
F11 0 3 3 0.1 0
LIFT 0 3.1 3.5 0.1 0

14.875

TOTAL 14.875

6 METAL
A FOUNDATION
F1 18 2.5 2.75 0 0
F2 4 2.5 2.5 0 0
F3 0 2 2 0 0
F4 0 3.1 3.5 0 0
F5 0 3.4 3.6 0 0
F6 0 3.1 3.5 0 0
F7 0 3.4 3.6 0 0
F8 0 3.1 3.5 0 0
F9 0 3.4 3.6 0 0
F10 0 3.1 3.5 0 0
F11 0 3 3 0 0
LIFT 0 3.1 3.5 0 0

0
B Floor
PART 1 1 49.8 18.6 0.2 185.256
PART 2 0 19.54 24.54 0.2 0
PART 3 0 24.54 24.54 0.2 0
PART 4 0 11.54 22.54 0.2 0
PART 5 0 14.54 16.54 0.2 0
OTTA 0 19.54 21.54 0.2 0
OTTA 0 22.54 23.54 0.2 0
DEDUCTION 0 9.54 9.54 0.2 0
DEDUCTION 0 9.54 9.54 0.2 0

185.256

TOTAL 185.256

7 TRIMIX FLOOR RCC WORK


No
PART 1 1 49.8 18.6 0.125 115.785
PART 2 0 19.54 24.54 0.125 0
PART 3 0 24.54 24.54 0.125 0
PART 4 0 11.54 22.54 0.125 0
PART 5 0 14.54 16.54 0.125 0
OTTA 0 19.54 21.54 0.125 0
OTTA 0 22.54 23.54 0.125 0
DEDUCTION 0 9.54 9.54 0.125 0
DEDUCTION 0 9.54 9.54 0.125 0

115.785

TOTAL 115.785

8 TRIMIX WORK-Final finisihing work

PART 1 1 49.8 18.6 926.28


PART 2 0 19.54 24.54 0
PART 3 0 24.54 24.54 0
PART 4 0 11.54 22.54 0
PART 5 0 14.54 16.54 0
OTTA 0 19.54 21.54 0
OTTA 0 22.54 23.54 0
DEDUCTION 0 9.54 9.54 0
DEDUCTION 0 9.54 9.54 0

926.28

TOTAL 926.28
9 Groove cutting with BITUMEN FILLER .

PART 1 13.28 18.6 247.008


4.96 49.8 247.008
PART 2 5.210667 24.54 0
6.544 19.54 0
PART 3 6.544 24.54 0
6.544 24.54 0
PART 4 3.077333 22.54 0
6.010667 11.54 0
PART 5 3.877333 16.54 0
4.410667 14.54 0
OTTA 5.210667 21.54 0
5.744 19.54 0
OTTA 6.010667 23.54 0
6.277333 22.54 0
DEDUCTION 2.544 9.54 0
2.544 9.54 0
DEDUCTION 2.544 9.54 0
2.544 9.54 0

494.016

TOTAL 494.016

10 300 MOCRON SHEET

PART 1 1 49.8 18.6 926.28


PART 2 0 19.54 24.54 0
PART 3 0 24.54 24.54 0
PART 4 0 11.54 22.54 0
PART 5 0 14.54 16.54 0
OTTA 0 19.54 21.54 0
OTTA 0 22.54 23.54 0
DEDUCTION 0 9.54 9.54 0
DEDUCTION 0 9.54 9.54 0

926.28

TOTAL 926.28

11 EXPANSION JOINT
No L
PART 1 0 73.15 0

PART 2 0 64 0
0

TOTAL 0

12 GP2 GROUT
t
C1 18 0.5 0.4 0.05 0.18
C2 4 0.3 0.35 0.05 0.021
C3 0 0.23 0.23 0.05 0
C4 0 0.3 0.6 0.05 0
C5 0 0.3 0.6 0.05 0
C6 0 0.3 0.6 0.05 0
C7 0 0.3 0.6 0.05 0
C8 0 0.3 0.6 0.05 0
C9 0 0.3 0.6 0.05 0
C10 0 0.3 0.6 0.05 0
C11 0 0.3 0.6 0.05 0
0 0 0 0 0.05 0

0.201

TOTAL 0.201

13 FOUNDATION BOLTS
Bolt No.
C1 18 8 144
C2 4 6 24
C3 0 0 0
C4 0 6 0
C5 0 6 0
C6 0 6 0
C7 0 6 0
C8 0 6 0
C9 0 6 0
C10 0 6 0
C11 0 6 0
0 0 6 0

168

TOTAL 168

14 RCC WORK
A FOUNDATION
F1 18 0.60375 0.279577 0.883327 15.89988
F2 4 0.5175 0.224869 0.742369 2.969476
F3 0 0.23 0 0.23 0
F4 0 1.2075 0.831567 2.039067 0
F5 0 1.4352 0.967157 2.402357 0
F6 0 1.2075 0.831567 2.039067 0
F7 0 1.4352 0.967157 2.402357 0
F8 0 1.2075 0.831567 2.039067 0
F9 0 1.4352 0.967157 2.402357 0
F10 0 1.2075 0.831567 2.039067 0
F11 0 1.2 0.53383 1.73383 0
LIFT 0 0 0 0 0

18.86936

TOTAL 18.86936

B Pedestal/Column upto plinth


C1 18 0.5 0.4 2.75 9.9
C2 4 0.3 0.35 2.75 1.155
C3 0 0.23 0.23 2.97 0
C4 0 0.3 0.6 2.6 0
C5 0 0.3 0.6 2.6 0
C6 0 0.3 0.6 2.6 0
C7 0 0.3 0.6 2.6 0
C8 0 0.3 0.6 2.6 0
C9 0 0.3 0.6 2.6 0
C10 0 0.3 0.6 2.6 0
C11 0 0.3 0.6 2.6 0
0 0 0 0 3.2 0

FC1 22 0.23 0.23 0.6 0.69828


FC2 0 0.23 0.23 2.3 0
FC3 0 0.23 0.23 2.3 0
FC4 0 0.23 0.23 2.3 0

11.75328

TOTAL 11.75328

C For GB
B t
GB1 1 100.4 0.23 0.45 10.3914
GB2 1 38.12 0.23 0.45 3.94542
GB3 0 6.8 0.23 0.45 0
GB4 0 15 0.23 0.45 0
GB5 0 15 0.23 0.45 0

14.33682
TOTAL 14.33682

D For PB
B t
PB1 0 73.15 0.23 0.45 0
PB2 0 20 0.23 0.45 0
PB3 0 12 0.23 0.45 0
PB4 0 14 0.23 0.45 0
PB5 0 15 0.23 0.45 0

TOTAL 0

E Coaping Beam
No L B t
CB1 1 100.4 0.23 0.1 2.3092
CB2 1 38.12 0.23 0.1 0.87676
CB3 1 6.8 0.23 0.1 0.1564
CB4 0 14 0.23 0.1 0
CB5 0 15 0.23 0.1 0

3.34236

TOTAL 3.34236

F RCC RAMP
No L B t
R1 0 12.665 1.315 0.2 0
R2 0 6.4 1.315 0.2 0
R3 0 12 5 0.2 0
R4 0 14 5 0.2 0
R5 0 15 5 0.2 0

TOTAL 0

G GF SILL BEAM
No L B t
SB1 1 100.4 0.23 0.1 2.3092
SB1 1 38.12 0.23 0.1 0.87676
SB1 0 12 0.23 0.1 0
SB1 0 14 0.23 0.1 0
SB1 0 15 0.23 0.1 0
PROJECTIO 0 5 0.45 0.1 0
PROJECTIO 0 5 0.45 0.1 0
PROJECTIO 0 5 0.45 0.1 0
PROJECTIO 0 5 0.45 0.1 0

3.18596

TOTAL 3.18596

H GF LINTEL BEAM
No L B t
LB1 1 100.4 0.23 0.23 5.31116
LB2 1 38.12 0.23 0.23 2.016548
LB3 0 12 0.23 0.1 0
LB4 0 14 0.23 0.1 0
LB5 0 15 0.23 0.1 0
WEATHER S 16 2.1 0.45 0.1 1.512
WEATHER S 0 5 0.45 0.1 0
WEATHER S 0 5 0.45 0.1 0
WEATHER S 0 5 0.45 0.1 0

8.839708

TOTAL 8.839708

I TIE BEAM
No L B t
TB1 0 10 0.23 0.1 0
TB2 0 20 0.23 0.1 0
TB3 0 12 0.23 0.1 0
TB4 0 14 0.23 0.1 0
TB5 0 15 0.23 0.1 0

TOTAL 0

J Pedestal/Column Plinth to GF slab HEIGHT


C1 18 0.5 0.4 0 0
C2 4 0.3 0.35 0 0
C3 0 0.23 0.23 0 0
C4 0 0.3 0.6 3 0
C5 0 0.3 0.6 3 0
C6 0 0.3 0.6 3 0
C7 0 0.3 0.6 3 0
C8 0 0.3 0.6 3 0
C9 0 0.3 0.6 3 0
C10 0 0.3 0.6 3 0
C11 0 0.3 0.6 3 0
0 0 0 0 3 0
0 0 0 0 3
FC1 22 0.23 0.23 3 3.4914
FC2 0 0.23 0.23 3 0
FC3 0 0.23 0.23 3 0
FC4 0 0.23 0.23 3 0

3.4914

TOTAL 3.4914

K GF SLAB BEAM Depth w/o


No L B slab thk.
B1 0 10 0.23 0.3 0
B2 0 20 0.23 0.3 0
B3 0 12 0.23 0.3 0
B4 0 12 0.23 0.3 0
B5 0 12 0.23 0.3 0
B6 0 12 0.23 0.3 0
B7 0 12 0.23 0.3 0
B8 0 14 0.23 0.3 0
B9 0 12 0.23 0.3 0
B10 0 12 0.23 0.3 0
B11 0 12 0.23 0.3 0
B12 0 15 0.23 0.3 0

TOTAL 0

L GF SLAB
No Thickness
PART 1 0 49.8 18.6 0.125 0
PART 2 0 19.54 24.54 0.125 0
PART 3 0 24.54 24.54 0.125 0
PART 4 0 11.54 22.54 0.125 0
PART 5 0 14.54 16.54 0.125 0
OTTA 0 19.54 21.54 0.125 0
OTTA 0 22.54 23.54 0.125 0
DEDUCTION 0 9.54 9.54 0.125 0
DEDUCTION 0 9.54 9.54 0.125 0
Loft slab 0 1 1.5 0.1 0

0
TOTAL 0

M STAIR CASE FOR GF


No L B Thickness
FLIGHT 1 0 3.5 1 0.125 0
STEPS 0 0.15 0.25 0.5 0
LANDING 1 0 1.5 1 0.125 0

FLIGHT 2 0 3.5 1 0.125 0


STEPS 0 0.15 0.25 0.5 0
LANDING 2 0 1.5 1 0.125 0

FLIGHT 3 0 3.5 1 0.125 0


STEPS 0 0.15 0.25 0.5 0
LANDING 3 0 1.5 1 0.125 0

Landing Be 0 2 0.23 0.45 0


Landing Be 0 2 0.23 0.45 0
Landing Be 0 2 0.23 0.45 0

TOTAL 0

15 BRICK WORK
A Up to FFL No l t ht
OUTER WAL 1 100.4 0.23 0.9 20.7828
OUTER WAL 1 38.12 0.23 0.9 7.89084
OUTER WAL 0 6.8 0.23 0.9 0
OUTER WAL 0 15 0.23 0.9 0
OUTER WAL 0 15 0.23 0.9 0
WALL 1 0 11 0.23 0.3 0
WALL 2 0 14 0.23 0.3 0
WALL 3 0 15 0.23 0.3 0
WALL 4 0 15 0.23 0.3 0

28.67364

TOTAL 28.67364

B WALL FROM
No l t Ht
OUTER WAL 1 100.4 0.23 3 69.276
OUTER WAL 1 38.12 0.23 3 26.3028
OUTER WAL 0 6.8 0.23 3 0
OUTER WAL 0 15 0.23 3 0
OUTER WAL 0 15 0.23 3 0
WALL 1 0 11 0.23 3 0
WALL 2 0 14 0.23 3 0
WALL 3 0 15 0.23 3 0
WALL 4 0 15 0.23 3 0

95.5788
Deduction
No l t Ht
Door 1 0 1.2 0.23 2.1 0
Door 2 0 1.2 0.23 2.1 0
Door 3 0 1 0.23 2.1 0
Door 4 0 0.9 0.23 2.1 0
Door 5 0 0.9 0.23 2.1 0
RS 1 6 5 0.23 3 -20.7
RS 2 0 3 0.23 3 0

Window 1 16 1.5 0.23 1.2 -6.624


Window 2 0 1.4 0.23 1 0
Window 3 0 2 0.23 1 0
Window 4 0 1 0.23 1 0
Vnetilation 0 0.6 0.23 0.6 0
Vnetilation 0 0.6 0.23 0.6 0
Vnetilation 0 0.6 0.23 0.6 0

-27.324

TOTAL 68.2548

C PARTITIO No l Ht
WALL 1 0 11 3 0
WALL 2 0 14 3 0
WALL 3 0 15 3 0
WALL 4 0 15 3 0

0
Deduction
No l Ht
Door 1 0 1.2 2.1 0
Door 2 0 1.2 2.1 0

Window 1 0 1.5 1 0
Window 2 0 1.4 1 0
Vnetilation 0 0.6 0.6 0

0
TOTAL 0

16 PLASTER WORK INSIDE


A FROM FFL No./FACE l ht
(230mm walls)
OUTER WAL 1 100.4 3 301.2
OUTER WAL 1 38.12 3 114.36
OUTER WAL 0 6.8 3 0
OUTER WAL 0 15 3 0
OUTER WAL 0 15 3 0
WALL 1 0 11 3 0
WALL 2 0 14 3 0
WALL 3 0 15 3 0
WALL 4 0 15 3 0
WALL 4 0 15 3 0

Deduction Door
Door 1 0 1.2 2.1 0
Door 2 0 1.2 2.1 0
Door 3 0 1 2.1 0
Door 4 0 0.9 2.1 0
Door 5 0 0.9 2.1 0
RS 1 3 4 4 -48
RS 2 0 3 3 0

Window
Window 1 16 1.5 1.2 -28.8
Window 2 0 1.4 1 0
Window 3 0 2 1 0
Window 4 0 1 1 0
Vnetilation 0 0.6 0.6 0
Vnetilation 0 0.6 0.6 0
Vnetilation 0 0.6 0.6 0

Partition walls
WALL 1 0 11 3 0
WALL 2 0 14 3 0
WALL 3 0 15 3 0
WALL 4 0 15 3 0

Deduction

Door 1 0 1.2 2.1 0


Door 2 0 1.2 2.1 0

Window 1 0 1.5 1 0
Window 2 0 1.4 1 0
Vnetilation 0 0.6 0.6 0

Stair
Flight 1 0 3.5 1 0
Landing 1 0 1.5 1 0

Flight 2 0 3.5 1 0
Landing2 0 1.5 1 0

Flight 3 0 3.5 1 0
Landing 3 0 1.5 1 0

Slabs

PART 1 0 49.8 18.6 0


PART 2 0 19.54 24.54 0
PART 3 0 24.54 24.54 0
PART 4 0 11.54 22.54 0
PART 5 0 14.54 16.54 0
OTTA 0 19.54 21.54 0
OTTA 0 22.54 23.54 0
DEDUCTION 0 9.54 9.54 0
DEDUCTION 0 9.54 9.54 0
Loft slab 0 1 1.5 0

Beams sid Face


B1 0 10 0.3 0
B2 0 20 0.3 0
B3 0 12 0.3 0
B4 0 12 0.3 0
B5 0 12 0.3 0
B6 0 12 0.3 0
B7 0 12 0.3 0
B8 0 14 0.3 0
B9 0 12 0.3 0
B10 0 12 0.3 0
B11 0 12 0.3 0
B12 0 15 0.3 0

338.76

TOTAL 338.76
10 SHUTTERING
A SHUTTERING L D
F1 36 1.5 0.45 24.3
36 1.75 0.45 28.35
F2 8 1.5 0.45 5.4
8 1.5 0.45 5.4
F3 0 1 0.45 0
0 1 0.45 0
C1 36 0.5 2.15 38.7
36 0.4 2.15 30.96
C2 8 0.3 2.15 5.16
8 0.35 2.15 6.02
C3 0 0.23 2.37 0
0 0.23 2.37 0
GB1 2 100.4 0.45 90.36
1 100.4 0.23 23.092
GB1 2 38.12 0.45 34.308
1 38.12 0.23 8.7676
GB2 0 6.8 0.45 0
0 6.8 0.23 0
COPING BEAM 2 138.64 0.1 27.728
1 138.64 0.23 31.8872
TOTAL 360.4328
FROM PLINTH TO 3.0 M
C3 88 0.23 3 60.72
RCC LINTEL 3 98.2 0.23 67.758
CHAJJA 16 2.1 0.45 15.12
32 2.1 0.1 6.72
TOTAL 150.318
BOQ OF FACTORY SHED CHANNI
AREA 922 SQM
PLINTH HEIGHT 0.6 RMT

SR.NO. DESCRIPTION OF ITEMS QTY. RATE UNIT AMOUNT

A UPTO PLINTH LEVEL


1 SURFACE DRESSING / SITE CLEANING
Labour charges for grubbing and clearing Road / land including clearing top soil, including all plants, vegetations, dirts etc.
complete,etc with dumping all the nonuseful stuff materials into the plot boundary , as per instruction of site engg. for the location
[Max depth @ 150 mm assumed ] 1257.96 10 SQM 12579.56

2 EXCAVATION WORK
Earth work in excavation below existing ground level in foundations, trenches, in all class of soil / murrrum except rock up to a depth
of 1.50 mtrs. Including shoring, strutting, dewatering, and disposing off the un useful soil outside the plot boundary complete as
directed by Engineer IN charge.

a ( upto 1.50 )
Do--- as above in depth 0 mtrs. To 1.50 mtrs. 201.94 170 CUM 34329.54
b ( upto 3.00 )
Do--- as above in depth 1.50 mtrs. To 3.00 mtrs. 88.71 200 CUM 17742.20
c Do--- as above in depth 3.0 mtrs. To 4.50 mtrs. R/O CUM

3 BACK FILLING WORK


Filling in foundation & in Plinth with selected(Non Expansive) earth spread in layers of 150 to 230 mm thickness to achieve required
level and slope / gradient and compacted to 95% of proctor density and leveling finally as per the instruction of Engineer-In-Charge
inclusive cost of soil, transportation and all taxes and royalties .

a Available excavated soil 230.28 155 CUM 35692.91


b Earth brought from outer side for Plinth filling
Murrum filling 657.49 550 CUM 361621.90
4 PLAIN CEMENT CONCRETE [M10-1:3:6]
Providing and laying cement concrete in foundation and plinth M:10 [Site mix] and curing complete including cost of formwork as
directed by Engineer In charge.
Total Qty. for Metal concrete(PCC) 113.74 5000 CUM 568682.00
5 SAND FILLING
Providing and laying sand in foundation and plinth including cost of formwork as directed by Engineer In charge.
Total Qty. for Sand 14.88 800 CUM 11900.00
6 Metalling [ 63-90 mm ]
Providing and laying metal (size 63mm x 90mm) in a layer of 175mm each well compacted with power roller without damaging
foundation filling voids with quarry dust, watering, ramming, compacting if required for edges and corners use plate compactor etc. 185.26 2375 CUM 439983.00
complete as directed by Engineer In charge.

7 RCC WORK [ IN M20 GRADE]


Providing and laying controlled reinforced Cement Concrete of M20 grade with 20mm down size graded crushed stone
aggregate including scaffolding, opening, recesses, chamfering, finishing top surfaces vibrating, machine mixing tamping, curing
(excluding centering and shuttering) etc. complete as per the specifications, drawings and instruction of Engineer - in- charge
(excluding cost of reinforcement) for all elements of concrete.
a Total Qty. for RCC footings 18.87 6300 CUM 118876.97
b Total qty. for RCC columns (Pedestal ) 11.75 6300 CUM 74045.66
c Total Qty. for RCC groundbeams 14.34 6300 CUM 90321.97
d Total Qty. for copping beams + RAMP 3.34 6300 CUM 21056.87

8 BRICK MASONARY WORK


Providing and constructing Conventional Brick masonry in CM 1:6 (1 Cement and 6 Coarse sand) upto plinth with conventional size
bricks having minimum crushing strength of 35 Kg / Sq. Cm. including scaffolding, racking out joints, curing, watering etc., complete as
directed by Engineer IN charge.

a Total qty. of brick work upto P.L. (230 mm thick) (1:6) proportion 28.67 6200 CUM 177776.57

9 REINFORCEMENT STEEL FE 500


Providing & Supplying & fixing in position High yield deformed bar Reinforcement confirming to IS – 1139 or cold Twisted bars, TOR
steel / TMT / or Equivalent Reinforcement bars confirming to IS – 1786 for RCC construction including transporting (i.e. loading &
unloading) the steel from store/issue points to site of works including unloading from Trucks/Trailers, cleaning, de coiling, cutting,
bending to required shape and lengths as per detailed drawing, binding with 16 SWG black soft annealed binding wire, placing with 3.20 72000 MT 230628.08
proper cover block, support chairs, overlap, spacers, etc. complete in all respect as directed by Engineer IN charge in foundation and
up to Plinth level.

10 SHUTTERING
Providing and erecting in position form work with plate shuttering materials of approved quality for all type of concrete elements
vertical, horizontal or inclined including scaffolding, stagging, fasteners,locking ,Ties at respective levels necessary nails, wires, locking
pins,Guggus etc keeping in position till concrete is laid and members have acquired required strength, removal thereafter, applying 360.43 500 SQM 180216.40
shuttering oil etc. complete as directed by Engineer-in-Charge.
B ABOVE PLINTH LEVEL & UPTO LINTEL LEVEL 3.00 HT
11 RCC Tremix Flooring [M:25] --only concrete pourng work
Providing and laying conventional cement concrete M-25, 150 mm thick in alternate panels for flooring. Panels shall be
formed by MS channel 100 mm depth on all four sides and bolted adequately to make the panel size as required. Entire
concrete mass shall be vibrated with screed vibrators and levelled etc ,including the cost of form work but excluding cost 115.79 6300 CUM 729445.50
of reinforcement, and curing by pounding the surface of concrete, complete as directed by Engineer IN charge..

12 RCC work [ in M25 Grade ]


Providing and laying controlled reinforced Cement Concrete of M25 grade with 20mm down size graded crushed stone
aggregate including scaffolding, opening, recesses, chamfering, finishing top surfaces vibrating, machine mixing tamping, curing
(excluding centering and shuttering) etc. complete as per the specifications, drawings and instruction of Engineer - in- charge
(excluding cost of reinforcement) for all elements of concrete

a RCC COLUMNS UPTO GF slab..volume 3.49 6300 CUM 21995.82


b RCC LINTEL BEAMS & Weather shed+sill beam 12.03 6300 CUM 75761.71

13 BRICK MASONARY WORK


Providing and constructing Conventional Brick masonry in CM 1:6 (1 Cement and 6 Coarse sand) above plinth and upto ground floor
slab level with conventional size bricks having minimum crushing strength of 35 Kg / Sq. Cm. including scaffolding, racking out joints,
curing, watering etc., complete as directed by Engineer IN charge.

a Total qty. of brick work above P.L. (230 mm thick) (1:6) propoprtion 68.25 6200 CUM 423179.76
b Partition wall above P.L (115 mm thick) (1:4) propoprtion R/O SQM

14 Inside Single coat Smooth Plaster


Providing and applying 12mm thk. Smooth cement plaster in CM 1:4 (1:Cement and 4:Coarse sand) to walls, beams, column, drain,
bends, moulds, making grooves, pattas on all brick and RCC surfaces including raking joints, scaffolding, curing finishing smooth ,
above plinth to all level above plinth. The plaster shall be rubbed with "Iron Plate' till the surface shows cement paste in line level 338.76 380 SQM 128728.80
including scaffolding ,curing etc., complete as directed by Engineer IN charge. and the RCC surface shall be chipped etc.

15 Outside Double coat Sand faced Plaster OR Mala Plaster


Providing and applying 20 mm th. double coat sandfaced or mala cement plaster on any surface, consisting of 12 mm thick backing
coat in CM 1:3 with water proofing compound (1:Cement and 3:Coarse sand) & 8 mm thick finishing coat in CM 1:1 with water
proofing compound (Q 200ml /bag as dosage)(1:Cement and 1:Coarse sand) to walls, beams, column, drain, bends, moulds, making
grooves, pattas and all brick and RCC surfaces including raking joints, scaffolding, curing finishing.The plaster surface shall have rough 338.76 410 SQM 138891.60
finish by using sponge on all types of surfaces in line level and including all scaffolding and curing & level at all level above plinth and
upto ground floor level complete as directed by Engineer IN charge
16 TRIMIX WORK-Final finisihing work
Extra for using "Tremix system " (vacuum dewatering system and smooth finishing and after that smooth finish with power
926.28 80 SQM 74102.40
trowel) in flooring.etc complete incl.all cost and as per instruction of Engg Incharge .

17 Groove cutting
Providing and constructing groove cutting of size 5mm x 50mm deep for floor , including saw cutting of concrete floors / 494.02 125 RMT 61752.00
pavement to the required depth, filling the same with polysulpide, etc. complete.as per instruction of Engg in charge.

18 300 micron PLASTIC


Providing and laying 300 micron plastic above PCC of trimix projected at least 300 mm from RCC face and overlap at least
926.28 60 SQM 55576.80
300 mm etc completed as per instruction of Site engineer.

18 REINFORCEMENT STEEL FE 500


Providing & Supplying & fixing in position High yield deformed bar Reinforcement confirming to IS – 1139 or cold Twisted bars, TOR
steel / TMT / or Equivalent Reinforcement bars confirming to IS – 1786 for RCC construction including transporting (i.e. loading &
unloading) the steel from store/issue points to site of works including unloading from Trucks/Trailers, cleaning, de coiling, cutting,
bending to required shape and lengths as per detailed drawing, binding with 16 SWG black soft annealed binding wire, placing with 1.63 72000 MT 117459.53
proper cover block, support chairs, overlap, spacers, etc. complete in all respect as directed by Engineer IN charge in above plinth to
upto GF slab level.

18 SHUTTERING
Providing and erecting in position form work with steel props, shuttering and boxing using plate shuttering materials of approved
quality for all type of concrete elements vertical, horizontal or inclined including scaffolding, stagging, fasteners,locking ,Ties at
respective levels necessary nails, wires, locking pins,Guggus etc keeping in position till concrete is laid and members have acquired 150.32 500 SQM 75159.00
required strength, removal thereafter, applying shuttering oil etc. complete as directed by Engineer-in-Charge.

19 Foundation Bolt Fixing


Labour charges for Positioning Foundation Bolts in the pedastals maintaining all the line & level , confirming from the responsible
Engineer etc as per detailed drawing, to keep the bolts in position as required ,etc. complete as directed by Engineer In Charge. 168.00 250 NOS 42000.00

20 GP2 Grouting
Filling the gap between RCC column, base plate and floor with GP2 Grout of M45 I S I grout to consume shall confirm to company
Equavalient of SIKA make / Fair mate / Dr. fixit etc. as per I S Specification including the all the over head expesnes and the edges shall 0.20 62000 CUM 12462.00
be shampered etc completed as directed by Engineer Incharge.
20 Alluminum Windows & Ventilation
Providing, febricating and fixing in position aluminum windows and ventilator using : with approved colour anodizing ( 15 microns ).
Supplying and fixing 5mm thick plane glass.. including sealing the gap between frame & plaster with SILICON SELEANT of approved
make , all fixtures and fastening, fittings such as hinges, handles, tower bolts (concealed) etc. all as per drawing / manufacturing 28.80 4500 SQM 129600.00
specification & direction of Engineer in charge.

Two track
Bottom frame - 61.2X31X 1.5mm thick @ 0.905 Kg/m.
Top & side frame -61.2X31X 1.5 mm thick @ 0.781 Kg/m.
Shutter top and bottom frame - 40.00 x 18.5 x 1.5 thick @ 0.530 Kg/m.
Shutter Handle side vertical frame - 40.00 x 18.5 x 1.5mm @ 0.530 Kg/m
Shutter interloking frame - 40.00 x 18.5 x 1.5mm thick @ 0.629 Kg/m.

21 PAINTING WORK (FROM INSIDE)


Providing and applying Two coats of Acrylic distemper [ Water base ]of approved brand & make , with one two coats of Brila putti--
Or J k Putti over the distemper of approved shade of color on wall and all other surfaces to give an even and smooth painted surface
over and including a priming coat after thoroughly cleaning the walls by water, scaffolding and brushing to remove all dirt and
remains of loose materials, mortar droppings & other foreign matter and preparing the surface even and sand papered smooth 338.76 190 SQM 64364.40
complete, up to all level above plinth complete as directed by Engineer In Charge.(INNER SIDE)

22 PAINTING WORK (FROM OUTSIDE)


Providing and applying two or more coats, of "Apex weather proof exterior emulsion paint" (Asian paint make) of approved shade to
give good and even shade over plaster, brick / concrete surfaces at all levels as per instructions of the engineers-in-charge including 338.76 210 SQM 71139.60
scaffolding, cleaning, washing the surface etc. complete at all levels.

23 Rooling shutter 150.00 4500 SQM 675000.00


TOTAL AMOUNT FOR CIVIL WORK 5272072.53

24 STRUCTURAL STEEL WORK


Providing and labour charges for straightening, cutting, cleaning, fabricating, erecting, placing in position and connecting M.S. Str.l
work fabricated from rolled steel sections, plates, angles, channels, rounds, flats, RHS etc. in roof trusses, Column, beams, gantry
girders, bracings,catwalk for false ceiling, platforms, pipe trestles, stairs, monorails, cleats, protection angles, brackets, hangers,
a purlins, tie runners, sag rods with threading, triangular frames for louvers, cable trays, rain water & other utilities pipe supports, 22.91 90000 MT 2061648.72
ladders with or without cage, canopy, etc. including transport, loading and unloading as and when required, cutting, wastage, welding
with welding rods (shop & site) bolting, wherever necessary including cleaning etc. complete.

25 PAINTING FOR STRUCTURAL STEEL


Painting with one coat of red oxide premier before erection and two coats of synthatic enamel paint of approved shade after erection
22.91 6500 MT 148896.85
to Fabricated structure in position various insert like edge angels channels ,plates etc complete.

26 ROOF SHEETING [GALVALUAM SHEET]


Providing ,Transporting to site ,cutting ,placing and fixing to structural member G.I .Precoated coloured sheet in roofing & cladding
fixed with “Drip Grip” Roof fixing accessories manufactured by Ketalist Group consisting of poly cap polymer washer ,seal
a 1229.70 550 SQM 676334.18
washer ,seal bolts etc all as per manufactureer’s specification and as directed by engineer .( 0.5 MM TCT FOR SHEETS OF JINDAL OR
EQIVALENT MAKE ))
b Providing and fixing GI gutter 100.52 950 RMT 95494.00
c Flashing 382.00 950 RMT 362900.00

27 POLYCARBONATE SHEET
Providing and Fixing in Positional FRP Translucent roofing sheet of 1.5m thick in precoated sheet roofing for lighting etc.including
341.06 1450 SQM 494537.00
necessary scaffolding ,fixtures and as directed.

28 DOWN TAKE PIPE..110 mm dia


Providing and fixing in positional PVC Rain Water Pipe of Prince or Supreme Manufacture,jointing with suitable adhensive as per
108.00 750 RMT 81000.00
manufacturer specification with all special likes bends ,shoes,M.S. Clamps etc. complete.

TOTAL COST FOR STRUCTURAL STEEL WORK 3920810.75

TOTAL AMOUNT CIVIL AND STRUCTURAL WORK 9192883.28