TIE BEAM

Sr.
Particular
no. L B H

1 GB3 0.000 0.000 0.000


→ TOP -3- 20  & BOTTOM - 3- 20 
FACEBAR-2-12

→ RINGS-8 AT 150C/C

2 TB1 4.720 0.230 0.400


→ TOP -2- 12  & BOTTOM -4- 12 
2-12 EXTRA
2-12 FACEBAR
EXTRA TOP

→ RINGS-8 AT 150C/C

3 TB2 2.500 0.230 0.400


→ TOP -2- 12  & BOTTOM -3- 12 
0-20 EXTRA
2-12 FACEBAR

EXTRA TOP

→ RINGS-8 AT 150C/C
BAR BENDING SCHEDULE - TB

Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm

0.250 -0.050 0.250 0 3 2

0.250 -0.050 0.250 0 3 2

-0.050 0 2 2

-0.050
0.075 0 1 2
-0.050 0.075 -0.050

-0.050

0.250 4.670 0.250 12 2 12


0.250 4.670 0.250 12 4 12

4.670 0 2 12

1.900
0.250 12 2 12

0.180
0.075 8 48 12
0.350 0.075 0.350

0.180

0.250 2.450 0.250 12 2 4

0.250 2.450 0.250 12 3 4

2.450 0 2 4

1.800
0.150 12 1 4

0.180
0.075 8 18 4
0.350 0.075 0.350

0.180
NDING SCHEDULE - TB

Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)

0.450 2.700 - -

0.450 2.700 - -

-0.050 -0.200 - -

0.150 -0.050 -0.100 - -

5.170 124.080 - -
5.170 248.160 - -

4.670 112.080 - -

2.150 51.600 - -

0.100 1.210 696.960 275.299 -

2.950 23.600 - -

2.950 35.400 - -

2.450 19.600 - -

1.950 7.800 - -
0.150 1.210 87.120 34.412 -

TOTAL 309.712 0.000


GRAND TOTAL
Weight in Kg
Total wt Total wt
Total wt Total wt
12mm 16mm
20mm 25mm (3.85
(0.89 (1.58
(2.47 kg/mt) kg/mt)
kg/mt) kg/mt)

- - - -

- - - -

- - - -

- - - -

110.431 - - -
220.862 - - -

- - - -

45.924 - - -

- - - -

21.004 - - -

31.506 - - -

- - - -

6.942 - - -
- - - -

436.670 0.000 0.000 0.000


746.381