You are on page 1of 11

OPCO: UGANDA

SITE IDENTIFICATION

Site Name: Employee Name:


IRENZI charles onenchan atyero
Site Number: Employee
EA5652 Number: UG121
Site Type: Date:
outdoor 14/03/2023
Vendor: Signature:
zte charles
Key code: Opening: Key code:
site under construction Closing: site under construction

ITEM: COMMENTS:
na site still under construction

HEALTH AND SAFETY CHECKLIST

Health and Checks

Description Status Comments


First Aid kit and fire extinguisher (DCP) are YES NO N/A
available with PM team ok
Photo of First Aid kit and fire
extinguisher

Is site specific risk assessment conducted with YES NO N/A


appropriate control measures implemented? ok
Photo of risk level assessment
document conducted on site
before carrying out PM

Company ID cards and Proof of trainings


available for site team (Nokia Health and Safety YES NO N/A ok
induction, electrical safety certificates, etc.)
Photo of Company ID cards
and Proof of trainings
available for site team (Nokia
Health and Safety induction,
electrical safety certificates,
etc.)

Personal Fall Arrest equipment, Rescue kit and


Personal Protective Equipment PPE (Helmet, YES NO N/A ok
Harness, Safety shoes, high visibility Vest etc.)
on site?
Photo of PPE Kit and Fall
Arrest Equipment

Safety Climbing system (on tower) correctly


installed (fixing elements, connection screws, YES NO N/A none
fall arrestors,)
Photo of Tower climbing
system

Adequate lifting equipment / tools (rope and YES NO N/A


pulleys etc) are used and fit for purpose none
Photo of Lifting equipment /
tools (rope and pulleys etc)

Is the team aware of Nokia's Life Saving Rules


and Nokia Non-negotiables for work at height? YES NO N/A ok
Are they familiar with FASTEN?
Photo of Working at heights
and Life Saving Rules
certificate

Are all climbers certified as medically fit for YES NO N/A


working at heights? ok
Photo of Medical Certificate/
Medical report.

Is there any environmental hazard on site YES NO N/A


preventing engineer from executing PM? ok
Photo of any environmental
hazard on site

Is there any electrical hazard on site preventing YES NO N/A


engineer from executing PM? none
Photo of any electrical hazard
on site

Is there any other hazard on site preventing YES NO N/A


engineer from executing PM? none
Photo of any other hazard on
site

GSM ANTENNAS:

900 BAND
Sector 1 Sector 2 Sector 3 Sector 4 Sector 5
GSM Antenna type/model prose hexaband prose hexaband prose hexaband na na
GSM Antenna Part number BA- BA- BA- na na
G7G7W8W8W8W8X G7G7W8W8W8W8X G7G7W8W8W8W8X
65V-21MS 65V-21MS 65V-21MS
Electrical Tilt ret ret ret na na
Mechanical Tilt 2 2 0 na na
Azimut 40 140 250
ABH (Antenna Bracket Height) 48m 48m 38m na na

GSM ANTENNAS:

1800 BAND
GSM Antenna type/model prose hexaband prose hexaband prose hexaband prose hexaband na
GSM Antenna Part number na BA- BA- BA- na
G7G7W8W8W8W8X G7G7W8W8W8W8X G7G7W8W8W8W8X
65V-21MS 65V-21MS 65V-21MS
Electrical Tilt ret ret ret na na
Mechanical Tilt 2 2 0 na na
Azimut 40 140 250
ABH (Antenna Bracket Height) 48m 48m 48m na na

GSM ANTENNAS:

2100 BAND
GSM Antenna type/model prose hexaband prose hexaband prose hexaband na na
GSM Antenna Part number BA- BA- BA- na na
G7G7W8W8W8W8X G7G7W8W8W8W8X G7G7W8W8W8W8X
65V-21MS 65V-21MS 65V-21MS
Electrical Tilt ret ret ret na na
Mechanical Tilt 2 2 0 na na
Azimut 40 140 250
ABH (Antenna Bracket Height) 48m 48m 48m na na
GSM ANTENNAS:

2600 BAND
GSM Antenna type/model na ,no 2600 band on
site
GSM Antenna Part number
Electrical Tilt
Mechanical Tilt
Azimut
ABH (Antenna Bracket Height)

GSM ANTENNAS:

Site information
Site Type ( GBT/RTP/RTT) GBT GBT GBT na na
Number of Airtel Cabinet at site 1 1 1 na na
Sector on Feeder/ RRU Cable RRU CABLE RRU CABLE RRU CABLE na na
Building Height na na na na na
Tower/Pole Height (m) 50m 50m 50m na na
VSWR 1.19,1.21,1.15 1.17,1.16,1.20 1.14,1.13,1.08 na na
Equipment earthing earthed earthed earthed na na
Water proofing status waterproof waterproof waterproof na na
Number of RRU at site 2 2 2 na na
Location of RRU On Tower 2 2 2 na na
Location of RRU On Ground na na na na na
Location of RRU indoor na na na na na

FEEDER CONNECTORS

Waveguide: na, no feeders on site


Water proofing status :
Earthing :
NO Dents :
No mositure Water :
Fixation:

MICROWAVE DETAILS

IDU Type / Model Link Dir 1 Link Dir 2 Link Dir 3 Link Dir 4 Link Dir 5 Comments
IDU TYPE / MODEL zte na ja na na ok
zxmwnr915
0
IDU Part Number 219405546 na na na na ok
706
MW DISH SIZE 0.9m na na na na ok
MW DISH Bracket Height (m) 45m na na na ok
na
site B Busembati na na na na ok
a
TX FREQUENCY (MHz) 11155mhz na na na na ok
RX Frequency (MHz) 11685mhz na na na na ok
ODU / IDU Cable working na na na na working properly
Ethernet cable termination terminated na na na na terminated properly
Water Proofing waterproof na na na na waterproofed properly
ed
ODU fixation fixed na na na na fixed firmly
OCTOPUS CABLE/JUMPERS na na na na na na
DDF JUMPERS na na na na na na
IDU FAN cooling na na na na cooling steadily
Equipment earthing earthed na na na na earthed properly
SNR level na na na na nq na
RSL Level (dBm) -50 na na na na not ok
TX Power (dB) 26 ja na na na ok
Back Up Configuration taken taken na na na na taken and kept
BACKUP CROSS CONNECTION TAKEN na na na na na na
IP Port settings 10.141.95. na na na na ok
35
DCN availability connecting na na na na connecting properly
STP configured settings na na na na na na
Dust blowing done done na na na na done properly
CHECK FOE ENVIROMENTAL EXPOSURE ok na na na na equipment secured
OF EQUIPMENT
Modulation Check
(a) Maximum E1 capacity 0 na na na na na
(b) Used E1s na na na na na na
(c) Ethernet bandwidth capacity (Mbps) na na na na na na
packet loss check na na na na na na
colition check na na na na na na
ODU / RING diversity test 1+0 XPIC na na na na na
link
Errors on link check no errors na na na na na
No Alarms no alarm na na na na na

2G BTS

Alarm termination status : terminated


Check and tighten all jumper connections : tightened
Check VSWR readings, correct any deterioration : 1.19,1.21,1.15
BTS soft inventory : ZXRANB59900A
internal BTS alarms : no alarm
backup system module configuration : taken
check hardware alarms and correct : no alarm
BUST BLOWING : done
Equipment earthing : earthed

3G BTS

Internal BTS alarms : no alarm


BACK UP configuration : taken
IP PORT SEALS PRESENT : yes
DUST BLOWING : done
equipment earthing : earthed
check VSWR readings , correct any deteroriation : 1.17,1.16,1.20

4G BTS

Internal BTS alarms : no alarm


BACK UP configuration : taken
IP PORT SEALS PRESENT : yes
DUST BLOWING : done
equipment earthing : earthed
check VSWR readings , correct any deteroriation : 1.14,1.13,1.08

TRM/BTS/RRU Power connection

Tighten DC Power supply cable connection tightened


terminals between Active Nodes, customer DCDB
and cable lugs :
TRM Node DC Supply connected in 1+1 protection yes
(On LVD):
State DC cable size.: 16mm
State DC Breaker Rating.: 315A
BTS Battery Autonomy: passive scope
Rectifiers Charging: passive scope
Check and ensure BTS is connected to Normal yes connected
load:
Check and note the TRM circute breaker rating: 63A
Check and note the BTS circute breakers rating: 100A
Check and ensure the external alarms cards are working properly
working:

OTHER TENANTS ON THE TOWER

No. tenants : na
Name of tenant 1: na
Name of tenant 2: na
Name of tenant 3: na
Name of tenant 4: na
Name of tenant 5: na
Is the site connected on Solar: na
Is the site connected on Grid (UMEME): na
Is the site having generator: yes

GENERAL COMMENTS ON SITE STATUS

SITE CLEANLINESS : site is clean


Access road condition : good

REDUNDANT

Redundant equpment at site (Ground): na, no redundant equipment on site


List the redundant equpment at site GSM
(Ground):
List the redundant equpment at site Microwave
and sizes (Ground):
List the redundant equpment at site Power
(Ground):
List the redundant equpment at site Others
(Ground):
Redundant equpment at site (On Tower):
List the redundant equpment at site GSM (On
Tower):
List the redundant equpment at site Microwave
and sizes (On Tower):
List the redundant equpment at site Power (On
Tower):
List the redundant equpment at site Others (On
Tower):

Photos

Take photo to show Gate Signage


Take photo to show inside of BTS (BBU, ODF, TXN NODEs)
Take photo to show Showing all cabinet layout on the slab
Take photo to show Fiber and IF Cable earthling
Take photo to show ODUs and RRUs earthling
Take other photos you may find necessary to share