INSPECTION AND TEST PLAN (ITP) For Vibration Dampers

Type Sample

Manufacturer Name: Contract No. / Project Title:


Plant Location: ITP No. : ITP-VD-01
Equipment/Material Description: Vibration Dampers Review Cycle No :
Type of Equipment / Material Date:
No. of days:

Equipment Technical data (To be filled by the manufacturer):


Rated Voltage (Ur [kVrms]) 110/115/132/230/380kV
Nominal voltage (Um [kV])
Rated Current (A)
Rated Frequency (Hz) 60 Hz
Specification: 12-TMSS- 01, Rev. 02

Applicable Insp. Acceptance Criteria Test Remarks Manufacturer


Item Tests/Inspection items Unit Test Procedure Sample
Type Location
Standard Compliance
12-TMSS-01 As per approved
1 Visual Examination Clause 7.1 of IEC 61897 W drawing
Clause 7.2.2 (a)
Dimensions, materials & 12-TMSS-01 As per approved
2 mm Clause 7.2 of IEC 61897 W drawing
mass Clause 7.2.2 (b)
Corrosion protection Test 53
(Galvanizing Control on 12-TMSS-01 (bolts/nuts/washers)
3 µm Clause 7.3 of IEC 61897 W
ferrous parts) Clause 7.2.2 (c) 110
(clamps/counterweights)
Clause 7.2.4 of
12-TMSS-01 Clause 7.5 of IEC 61897 12-TMSS-01
4 Clamp Slip Test kN W >2.5
Clause 7.2.2 (d)
12-TMSS-01
5 Breakaway Bolt Test Nm Clause 7.6 of IEC 61897 W
Clause 7.2.2 (e) Design torque ±10%
No breakage of threads
Clamp Bolt Tightening 12-TMSS-01
6 Nm Clause 7.7 of IEC 61897 W at 2 times the design
Test Clause 7.2.2(f)
torque.

7
Damper Performance
Test φv 12-TMSS-01
Clause 7.2.2 (g)
Clause 7.11 of IEC
61897
W As per IEC 61897

ITP-VD-01 Standards & Specifications Department PAGE 1 OF 2

License=Al Sharif Group & KEC Co. Ltd/SA-881-t Not For Resale ,1/23/2023 8:26:01 PM Saudi Time
INSPECTION AND TEST PLAN (ITP) For Vibration Dampers

Legend:

W = Witness [by SEC/National Grid SA Engineers. and/or SEC approved 3rd Party Independent Inspection Agency (IIA) Inspector]
RC = Review of Certificates [by SEC/National Grid SA Engineers. and/or approved 3rd Party Independent Inspection Agency (IIA) Inspector]

General instructions:

1- Manufacturer’s compliance shall be indicated in front of each test.


2- Approved Data Schedule & final drawings for the equipment / Material shall be attached.
3- Test Procedure & Day-to-day activity schedule shall be attached for approval.
4- The ITP must be duly signed and stamped by manufacturer's authorized personnel.
5- This document is valid for testing after S&SD approval.

Prepared by (Mfr's authorized QC test inspector) Approved by: (Mfr's authorized QA/QC personnel)

Date:
Date:
Manufacturer Stamp

S&SD Approval

ITP-VD-01 Standards & Specifications Department PAGE 2 OF 2

License=Al Sharif Group & KEC Co. Ltd/SA-881-t Not For Resale ,1/23/2023 8:26:01 PM Saudi Time

You might also like