PAKISTAN RAILWAYS

DETAIL OF OVERHEAD WAPDA (FESCO) CROSSINGS

UNDER
AEFO/P/FAISALABAD
Location No: 2/3 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Provided Provided 29’-0” -
Provided Provided Provided Provided
Location No: 3/4-5 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Broken Broken 29’-0” -
Provided Provided Provided Provided
Location No: 4/4-5 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Provided Provided 29’-0” -
Provided Provided Provided Provided
Location No: 5/9 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not
2023 Provided Provided Missing Missing 29’-0” -
Provided Provided Provided Provided
Location No: 6/13 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Loose Loose 26’-0” -
Provided Provided Provided Provided
Location No: 7/13 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 29’-0” -
Provided Provided Provided Provided
Location No: 8/5 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Provided Provided 34’-0” -
Provided Provided Provided Provided
Location No: 9/13 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Provided Provided 34’-0” -
Provided Provided Provided Provided
Location No: 10/8 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 29’-0” -
Provided Provided Provided Provided
Location No: 11/12 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not -
2023 Provided Provided Provided Provided Missing Missing Provided Provided 33’-0”
Location No: 12/9 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 29’-0” -
Provided Provided Provided Provided
Location No: 13/12 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 132KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not
2023 Provided Provided Required Required 37’-0” -
Provided Provided Provided Provided
Location No: 14/13 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 132KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not
2023 Provided Provided Required Required 34’-0” -
Provided Provided Provided Provided
Location No: 15/14-15 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 132KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not
2023 Provided Provided Required Required 42’-0” -
Provided Provided Provided Provided

Location No: 16/8 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Year of Foundation Danger Board Earthing Remarks of AEN
climbing device / Cradle Guard from track) Remarks order of DEE
Inspection & DEN with
To lowest from To guard initial
Left Right Left Right Left Right Left Right Left Right
conductor / safety
net
Not Not Not Not
2023 Provided Provided Provided Provided 34’-0” -
Provided Provided Provided Provided

Location No: 17/14 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing Remarks of AEN
Year of climbing device / Cradle Guard from track)
& DEN with Remarks order of DEE
Inspection To lowest from To guard
Left Right Left Right Left Right Left Right Left Right initial
/ safety
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 35’-0” -
Provided Provided Provided Provided

Location No: 18/15 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 500KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Year of Foundation Danger Board Earthing Remarks of AEN
climbing device / Cradle Guard from track)
To guard
To lowest from & DEN with
Inspection Left Right Left Right Left Right Left Right / safety Left Right Remarks order of DEE
conductor initial
net
Not Not Not Not Not Not
2023 Provided Provided Required Required 46’-0” -
Provided Provided Provided Provided

Location No: 19/4 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 132KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level
Particulars and Particulars and Clearance above Rail
Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not
2023 Provided Provided Required Required 40’-0” -
Provided Provided Provided Provided

Location No: 20/2 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level
Particulars and Particulars and Clearance above Rail
Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not
2023 Provided Provided Missing Missing 36’-0” -
Provided Provided Provided Provided

Location No: 21/7 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 500KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level
Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not
2023 Provided Provided Required Required 44’-0” -
Provided Provided Provided Provided

Location No: 22/12 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 500KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level
Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not
2023 Provided Provided Required Required 43’-0” -
Provided Provided Provided Provided

Location No: 23/11 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized
Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Provided Provided 29’-0” -
Provided Provided Provided Provided

Location No: 24/15 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 132KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized
Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not Not Not
2023 Provided Provided Required 34’-0” -
Provided Provided Provided Provided Provided

Location No: 25/0 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning
Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 33’-0” -
Provided Provided Provided Provided

Location No: 26/6 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning
Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 35’-0” -
Provided Provided Provided Provided

Location No: 27/1 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference
Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Provided Provided 34’-0” -
Provided Provided Provided Provided

Location No: 28/6 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference
Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Provided Provided 36’-0” -
Provided Provided Provided Provided
Location No: 30/2 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 32’-0” -
Provided Provided Provided Provided
Location No: 31/4 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 30’-0” -
Provided Provided Provided Provided
Location No: 32/8 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Provided Provided 37’-0” -
Provided Provided Provided Provided
Location No: 33/6 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 33’-0” -
Provided Provided Provided Provided
Location No: 34/10 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 33’-0” -
Provided Provided Provided Provided
Location No: 35/5 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Provided Provided 32’-0” -
Provided Provided Provided Provided
Location No: 36/4 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 32’-0” -
Provided Provided Provided Provided
Location No: 37/9 Section: FSLD-SLL Agreement/Memo of terms reference Safety Certificate reference

Type Overhead/Underground and particulars of Conductors/Cables OVERHEAD Owning Department WAPDA (FESCO) Date of Commissioning

Electrical Circuit and Voltage 11KV Particulars of poles Particulars of Stays/Guys Status of crossing (authorized/unauthorized) Authorized

Distance & Circuit of pols/towers from center line of Track Right Left Angle of Crossing Level

Cables indications boards particulars of conductor how laid Depth below formation level

Particulars and Particulars and Clearance above Rail


Condition of condition of Anti- condition of Cage Guard Level (Vertical Clearance
Foundation Danger Board Earthing
climbing device / Cradle Guard from track)
Remarks of AEN
Year of To guard
To lowest from & DEN with Remarks order of DEE
Inspection / safety
Left Right Left Right Left Right Left Right Left Right initial
conductor
net
Not Not Not Not
2023 Provided Provided Missing Missing 32’-0” -
Provided Provided Provided Provided