You are on page 1of 4

Automotive and transportation

Nissan Motor
Continuous improvement – design through delivery

Products
NX, Teamcenter

Business initiatives
New product development
Commonization and re-use
Enterprise data management

Business challenges
Ongoing time-to-market
pressures
Consumer mandate for more
environmentally friendly cars
Global customer base and A highly successful PLM To ensure that Nissan is one of the win-
supplier network ners, the company is now building on the
implementation reduced vehicle
success of a program Ghosn initiated in
development time by nearly 2001. Called V-3P (Value Up for Product,
Keys to success 50 percent, improved quality Process and Program Innovation), this
Re-use of validated design by 80 percent, and exceeded comprehensive plan positions the com-
data and concepts ROI targets pany well for the challenges facing the
Virtual validation replaces all auto industry. In addition to the mandate
but one physical prototype Exciting times ahead for more environmentally friendly vehicles,
In Nissan’s view, the global automotive the challenges include on-going time-to-
Production requirements
industry is now engaged in “one of the market pressures, global markets, and
addressed earlier in the design
greatest engineering competitions in global supply chains.
process
history.” Carlos Ghosn, Nissan’s CEO and
Single source of vehicle data president, writes on the company’s The foundation of the V-3P program is
website, “In pursuit of environmentally product lifecycle management technology
sustainable mobility, we are now engaged from Siemens PLM Software, specifically
Results
in a great race…[that] will change almost I-deas™ and NX™ software for digital prod-
Development cycle reduced every facet of the car in the years ahead uct development and Teamcenter®
from 20 months to 10.5 and…distinguish the winners from the software for digital lifecycle management.
months rest.”
80 percent fewer problems
after vehicle release

www.siemens.com/plm
Results (continued)
Design changes reduced by
60 to 90 percent
Better-than-expected ROI

“Siemens has demonstrated


its performance on two
levels: the software has per-
formed very well and the
people understand our pro-
cesses and goals.”
Keigo Fukushi
General Manager and V-3P
Program Director
Nissan Design changes have been
reduced by 60 to 90 percent.
“Siemens PLM software is the main solu- processes are streamlined and timelines
tion for our V-3P innovation process,” says are shortened. Know-How CAD enables a
Keigo Fukushi, general manager and V-3P team to be more efficient and more inno-
program director at Nissan. “I-deas and NX vative, and allows younger engineers to
form the core design system, and achieve the same results as more experi-
Teamcenter manages all the data.” enced engineers.”

Dual goals In addition, digital data created in I-deas


The V-3P program as Ghosn originally and NX forms the basis for virtual valida-
conceived it had two goals: to get new tion, which is a key way Nissan is
vehicles to the market faster and to shortening the development cycle. “Virtual
increase product quality. Siemens’ soft- validation helps us find problems very
ware plays key roles in both areas. NX and early in the design process,” Fukushi says.
I-deas, for example, form the basis for “If you don’t find those problems until you
what the company calls “Know-How CAD,” make a physical prototype, it’s too late in
a system of knowledge capture and re-use the process and very expensive, plus it
that includes the entire team, from design may cause changes to many other pieces
engineers to suppliers. of the vehicle. A virtual test can happen
very early and it allows us to implement
“There are two aspects of Know-How CAD, countermeasures before other parts of the
process knowledge and product knowl- vehicle are fixed. Finding issues earlier
edge,” explains Fukushi. “With Know-How also gives you more time to work through
CAD, younger engineers have access to design alternatives to find the best overall
historical data and ideas; knowledge is solution or countermeasure.”
accessed and leveraged. And thus
“Siemens has demonstrated its performance
on two levels: the software has performed
very well and the people understand our
processes and goals.”
Keigo Fukushi
General Manager and V-3P Program Director
Nissan

These practices would not be possible available throughout the organization,


without Teamcenter, which establishes a even to those who don’t use the technical
single source of accurate and up-to-date applications.
vehicle information. The Teamcenter vault
contains CAD data created with both NX Success on all counts
and I-deas, digital validation models and The V-3P program has been hugely suc-
results, CAM files, bills of material, and cessful. When the program began, Nissan
process planning data. Teamcenter allows needed 20 months to bring a new vehicle
the company to make this information design from styling freeze to the start of
Solutions/Services
I-deas
NX
www.siemens.com/nx
Teamcenter
www.siemens.com/teamcenter

Customer’s primary business


Nissan Motor Co., Ltd. is one
of the world’s leading auto-
makers with a diverse
portfolio of cars, minivans,
trucks and SUVs.
www.nissan-global.com
production (SOP). The four vehicles that vehicle was released to the market. By this
have so far been developed in the V-3P measure, the V-3P program excelled,
Customer location program have gone from styling freeze to reducing this number by 80 percent.
Tokyo SOP in only 10.5 months.
Japan Nissan also reports that the V-3P program
Quality has improved significantly as well exceeded the return on investment the
under the V-3P program. This was deter- company originally expected. In the midst
“Siemens PLM software is the mined in two ways. One was a reduction of a great engineering competition that
main solution for our V-3P in design changes, which ranged from a will dramatically reshape its product line,
innovation process. I-deas 60- to a 90-percent decline. The lower fig- Nissan has established a vehicle develop-
and NX form the core design ure was achieved on a vehicle program ment process that both preserves its
system, and Teamcenter that included a significant amount of new reputation for quality and allows it to get
manages all the data.” technology. The 90-percent reduction was competitive technologies to market faster.
Keigo Fukushi found on a follow-up vehicle program The V-3P program, based on Siemens PLM
General Manager and V-3P based on an existing platform. The other technology, is the foundation for future
Program Director way that quality was measured was in the success.
Nissan number of problems reported after a

The development cycle has been


reduced from 20 months to 10.5
months.

Siemens PLM Software

Americas +1 314 264 8499 © 2015 Siemens Product Lifecycle Management Software Inc. Siemens and the Siemens logo are registered trademarks
Europe +44 (0) 1276 413200 of Siemens AG. D-Cubed, Femap, Fibersim, Geolus, GO PLM, I-deas, JT, NX, Parasolid,Solid Edge, Syncrofit, Teamcenter
Asia-Pacific +852 2230 3308 and Tecnomatix are trademarks or registered trademarks of Siemens Product Lifecycle Management Software Inc. or its
subsidiaries in the United States and in other countries. All other logos, trademarks, registered trademarks or service
marks belong to their respective holders.
www.siemens.com/plm 16299-Z11 1/15 A

You might also like