Study of The Management of LSP P1 Institutions in Increasing The Issuance of SKK-K Certificates in Kalimantan
Study of The Management of LSP P1 Institutions in Increasing The Issuance of SKK-K Certificates in Kalimantan
ISSN No:-2456-2165
Abstract:- Data from a survey by the Indonesian Central students. According to (BPS, 2019), the number of unemployed
Statistics Agency in 2021 shows that there is still a massive from the level of education for Vocational Schools was 8.3%,
gap between certified and uncertified construction workers, Diploma I/II/III was 6, 9% and Bachelors as much as 6.2%, with
so it is necessary to accelerate the certification of human one of the leading causes being the misalignment of
construction resources. One of the determinants of competencies possessed by Vocational High Schools,
accelerating certification is the well-integrated management Polytechnic and/or Higher Education graduates with industrial
of LSP P1. This study aims to analyze the dominant factors needs (BPS, 2019). Survey data from the Central Statistics
that influence the management of LSP P1 and determine the Agency for 2021 shows that Indonesian construction workers
right strategy for improving the management of LSP P1 to have exceeded 8.5 million people. Of this amount, only 9.6%, or
increase the issuance of construction work competency under 10% of the construction workforce or human resources,
certificates. The method used in this research is a survey have work competency certificates. There is still a massive gap
using a questionnaire. The sample data is taken from a between certified and uncertified construction workers, so it is
population from the management of LPS P1, while the necessary to accelerate the certification of construction workers
analysis method uses the Relative Important Index (RII). or human resources. In addition, the data of the Independent
From the results of the study, there are three dominant Intensive Learning Information System in the Construction
factors influencing the management of LSP P1 to increase Sector (SIBIMA), although it is known that there has been a
the issuance of construction work competency certificates, significant increase from 2017 to 2020, of the 4.9 million
namely (1) Post-Transition Period Regulatory workers or construction human resources, only 3% are certified
Implementation Factors, (2) LSP P1 Establishment and (SIBIMA, 2020). Of these figures, human resources come from
Assistance Factors and (3) Factors of Human Resources graduates and prospective graduates of Polytechnics and
(HR) and Excellent Service by LSP P1. Strategies that can Universities in the field of construction services in Indonesia. It
be recommended cush as assistance regarding the can be concluded from these conditions that the number of
procedures for establishing and registering a licensed LSP qualified human resources in construction work still needs to be
P1, planning and executing work programs in providing increased. Continuous efforts are made to carry out the
Training and Competency Tests, increasing the printing of Certification Test so that the implementation of construction in
competency assessors, especially in the civil and Indonesia can produce better quality construction and have
architectural fields, dan conducting MoU between competitiveness at the national and international levels.
Polytechnic and Construction Sector Universities with
Construction Services Business Entities or with the Ministry The role of printing/producing a competency-certified
of PUPR. workforce has shifted in authority/duty, initially served by the
Construction Services Development Institute (LPJK). In 2022 it
Keywords:- Management of LSP P1, Construction Work will become the task of the Professional Certification Institute
Competency Certificate Improvement Strategy, RII. (LSP), wherewith the growth of LSP-LSP, it is hoped that the
gap in Competency certificates can be filled quickly and with
I. INTRODUCTION quality. The Certification Test for construction workers or HR
can be carried out by LSP from Educational Institutions or
The main issues in infrastructure development include the Competency Test Technical Committees registered by the
limited number of certified construction workers or Human Minister, in this case, the Minister of Public Works and Public
Resources (HR). Law Number 2 of 2017 mandates that every Housing. Based on the results of data collection from the
worker in the construction sector must have a Work Competency Banjarmasin Region V Construction Service Center in early
Certificate as stipulated in Article 70, paragraph (1) and 2022, the number of LSP P1 established by Polytechnics and
paragraph (2). Currently, the number of Construction Workers Universities in the Construction Sector in Kalimantan still needs
or Human Resources (HR) who already have Work Competency to be increased. There are only about 6 (six) Polytechnics that
Certificates is 622,330 (7.3%) (LPJK, June 2020) out of a total already have LSP P1, and only some of them have been in the
of 8.5 million Indonesian Construction Workers (BPS, 2019). In process of being recorded on the PUPR licensing portal. LSP P1
2019 the potential number of graduates of Vocational High in question is a First Party Professional Certification Institution
Schools, Polytechnics, and Higher Education was 48,559 established by an education and or training institution with the
The number of graduates facilitated by LSP P1 in the Construction Sector has increased the
issuance of construction work competency certificates (SKK-K) - (X9)
Implementation of Costs in carrying out the competency test facilitated by LSP P1 in the Construction Sector
Competency Test by LSP P1 towards increasing the issuance of construction work competency certificate (SKK-K) - (X10)
Completeness of Facilities and Infrastructure in carrying out the competency test facilitated by
LSP P1 in the Construction Sector towards increasing the issuance of construction work
competency certificate (SKK-K) - (X11)
Human Resources (HR) and Availability of the number of assessors in the construction sector at LSP P1 in the Construction
Excellent Service by LSP P1 Sector towards the increase in the issuance of construction work competency certificates (SKK-
K) - (X12)
Availability of Competency Test Sites at LSP P1 in the Construction Sector towards increasing
the issuance of construction work competency certificates (SKK-K) - (X13)
A large number of types of construction work competency certificates issued by LSP P1 in the
Construction Sector has increased the issuance of construction work competency certificates
(SKK-K) - (X14)
The LSP P1 Process in the Construction Sector registers with LPJK the increase in the issuance
of construction work competency certificates (SKK-K) - (X15)
LSP P1 Process in the Construction Sector to obtain LPJK recommendations for increasing the
issuance of construction work competency certificate (SKK-K) - (X16)
LSP P1 Process in the Construction Sector to obtain a BNSP license to increase the issuance of
construction work competency certificate (SKK-K) - (X17)
LSP P1 Process in the Construction Sector for recording at LPJK towards increasing the
issuance of construction work competency certificate (SKK-K) - (X18)
The maximum service performed by LSP P1 in the Construction Sector towards increasing the
issuance of construction work competency certificate (SKK-K) - (X19)
There is an MoU/KSO between Polytechnics and Universities in the Field of Construction and
Construction Service Business Entities towards increasing the issuance of construction work
competency certificates (SKK-K) - (X20)
Training Program and Link and Match Program for Prospective Graduates to increase the issuance of construction
Competency Test by related work competency certificate (SKK-K) - (X21)
Stakeholders Training Program and Competency Test for Prospective Graduates to increase the issuance of
construction work competency certificate (SKK-K) - (X22)
Training Program and Competency Test for Graduates to increase the issuance of construction
work competency certificate (SKK-K) - (X23)
Additional Competency Training for Prospective Graduates to increase the issuance of
construction work competency certificate (SKK-K) - (24)
Additional Competency Training for Graduates to increase the issuance of construction work
competency certificate (SKK-K) - (X25)
SIBIMA Construction Training for Prospective Graduates to increase the issuance of
construction work competency certificate (SKK-K) - (26)
SIBIMA Construction Training for Graduates on increasing the issuance of construction work
competency certificate (SKK-K) - (27)
The results of RII's calculations related to the factors that Construction Sector towards an increase in the issuance of
influence the management of LSP P1 towards increasing the SKK-K; and
issuance of SKK-K at Polytechnics and Universities in the Field Factors of Human Resources (HR) and Excellent Service by
of Construction in Kalimantan show that 27 variables out of the LSP P1, with an MoU/KSO between Polytechnics and
five factors all have critical assessment criteria. Universities in the Construction Sector and Construction
Service Business Entities (BUJK), towards increasing the
Analysis and Discussion issuance of SKK-K.
Determination of Dominant Factors Of the five top-ranking factors mentioned, the variables are
From the analysis results, these 27 variables have essential closely related to the management and establishment of LSP P1.
criteria. Then 27 variables from the analysis results must be The five top-ranking variables are obtained from the three
considered for improvement or research. However, like the dominant factors that influence the management of LSP P1 in
initial research hypothesis, the current problem is the limited increasing the issuance of SKK-K, as follows:
licensed LSP P1. From the results of observations and studies of Regulatory Implementation Factors After the Transitional
secondary data, only a few Polytechnics and Universities in the Period,
Field of Construction in Kalimantan have established LSP P1, LSP P1 Establishment and Assistance Factors, and
namely only five Polytechnics with LSP P1. Of the five Factors of Human Resources (HR) and Excellent Service by
Polytechnics, it is known that 3 Polytechnics with schemes in the LSP P1.
construction sector, and 2 Polytechnics with schemes outside the
construction sector. Furthermore, those who have received Systems Approach
recommendations from LPJK PUPR and are applying for After calculating all variables and knowing the dominant
licenses from BNSP are from only 3 Polytechnics, namely factors that influence the management and establishment of LSP
Banjarmasin State Polytechnic, Samarinda State Polytechnic, P1 on increasing the issuance of SKK-K, the criteria for
and Pontianak State Polytechnic. determining the most important factors or strengthening
explanations related to these factors, whether they can be stated
Meanwhile, when viewed from the top five factors that as top priorities can be carried out in a systemic approach. The
have the highest RII value from the first to the fifth rank, as initial step in confirming the intended system is that the existing
follows: variables can be divided into those with an internal effect and
Factors for Implementing Post-Transition Period those with an external effect on the management of LSP P1. Can
Regulations, with the variable being licensed by LSP P1 in be seen in Fig. 1 LSP P1 management system approaches from
the Construction Sector at LPJK to increase the issuance of research results.
SKK-K;
LSP P1 Establishment and Assistance Factors, with the
variable role of BNSP in assisting the establishment of LSP
P1 in the Construction Sector towards increasing the
issuance of SKK-K;
Factors for Implementing Post-Transition Period
Regulations, with the variable forming LSP P1 in the
Construction Sector to increase the issuance of SKK-K;
Factors of Human Resources (HR) and Excellent Service by
LSP P1, with the variable availability of the number of
assessors in the construction sector at LSP P1 in the Fig. 1: LSP P1 Management System Approach