No Description Qty PO Vendor Harga Tgl Pic up Tgl PO Lead Time Status Keterangan 3/24/2023 19:09
1 Motor Hydraulic 1 MHB 20-Apr Cancel epaire
2 Motor Hydraulic 1 Prime Enginering 19-Apr Redo, Warranty
4 PIPE AFTER COLLAR, REPAIR. JACK BAGIAN PENYOK KEMEALI STD 1 PO/PTB/590/04.2021 Panca Teknik 6-Apr 6-Apr Waiting Supply
21 Wire Plate 1- Panca Teknik 5-May 5-May Waiting Supply
22 Shaft Bareshaft J350 1- Panca Teknik 5-May 5-May Waiting Supply
33 Shaft Bareshaft J600 1 PO/PTB/724/05.2021 Panca Teknik 20-May 20-May 674 Waiting Supply
34 Housing Bareshaft J350 1 PO/PTB/727/05.2021 Borindo 7,700,000 18-May 676 Waiting Supply
37 Housing Bareshaft J350 1 PO/PTB/744/06.2021 Panca Teknik 6,105,000 28-May 2-Jun 666 Waiting Supply
38 Shaft Bareshaft J350 1 PO/PTB/745/06.2021 Borindo 6,600,000 28-May 666 Waiting Supply
39 Shaft Bareshaft J350 1 Panca Teknik 28-May 666 Waiting gambar Jatmiko
40 Motor Hydraulic 1 UHT 28-May 666 Waiting Quotes
Status
Waiting Supply Close Waiting PO Total Result
8 6 1 15
16
15
14
12
10
Close
8 Waiting PO
6 Total Result
6
2
1
0
6
Count of Description Lead Time
Vendor (empty) Total Result
Borindo 4 4
MHB 1 1
Panca Teknik 13 13
Prime Enginering 1 1
Total Result 19 19
3
2 2
1 1