RENCANA ANGARAN BIAYA

PENGADAAN JARINGAN INTERNET MANDIRI


POKDARWIS DESA ANDUNGBIRU

N0 URAIAN SATUAN HARGA SATUAN Volume JUMLAH HARGA KET


1 2 3 4 5 6 7

A Peralatan Jaringan
1 Power Beam M5AC Gen2 unit 1,900,000.00 2 3,800,000.00
2 AM-5G 19-120 unit 1,950,000.00 1 1,950,000.00
3 Rocket 5AC Lite Airmax unit 2,150,000.00 1 2,150,000.00
4 Ubiquiti Unifi AP Lite/Uap AC Lite unit 1,450,000.00 3 4,350,000.00
5 Switch Hub Port GIGA ( 8 Port ) unit 420,000.00 1 420,000.00
6 Mikrotik RB 850 Gx2 unit 2,800,000.00 1 2,800,000.00
7 Cat 6 Belden 150mtr mtr 15,000.00 150 2,250,000.00
8 RJ 45 CAT 6 BELDEN bh 10,000.00 20 200,000.00
Sub total A 17,920,000.00

B PEMASANGAN TOWER TRIANGEL


1 Kawat m10 galvanis kg 29,000.00 25 725,000.00
2 Jarum Keras bh 17,500.00 20 350,000.00
Sub Total B 1,075,000.00
TOTAL A + B 18,995,000.00

Terbilang ; Delapan Belas Juta Tujuh Ratus Sembilan Ratus Sembilan Puluh Lima Ribu Rupiah