SOP description: TWO COAL MILL OPERATION
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 121 Revision No: 01
Plant 03.02.2021

1. PURPOSE: Operation of boiler with two coal mills at partial load operation of Boiler with no oil
gun support.
2. SCOPE: All three units
3. RESPONSIBILITY: Desk Engineers
4. DURATION: NA

5. OUTPUT: Proper operation of boiler with two coal mills helps in reduction in ESP inlet
temperature, maximized milling efficiency with minimum auxiliary power consumption at partial
load.

6.1 INITIAL STATUS

6.1.1 One boiler is running with partial load of 145-190 TPH.


6.1.2 Blending Coal GCV should be greater than 3000 Kcal/Kg.
6.1.3 All the bunkers are fed with imported and Indian blended coal in the ratio 20:80%.

6.2 OPERATION SEQUENCES:

6.2.1 During part load operation of boiler with blended coal in two or more bunkers keep the AA-
elevation SADC open more than 40% always irrespective of the adjacent(A-mill is in service or
not.)
6.2.2 Normal FD air flow must remain about 20000m3/hr. more when only imported/blended coal is
fed. ie. Keep FD flow 1,80000m3/hr. per fan if operating with blended coal for the same load
with Indian coal FD flow is requiring only 1,60000m3/hr. per fan.
6.2.3 Maximize the corner pressure, for Indian coal it is advised to maintain at about 0.20-0.30 Kpa
but during imported/blended coal operation increase the corner pressure up to 0.50-0.60Kpa
to prevent the approach of flame intensity nearer to the furnace wall which will prevent the
buildup of temperature nearer to ash fusion temperature.
6.2.4 With AA- elevation open more than 70% increase other elevation damper equally for proper
distribution of secondary air.
6.2.5 Preferably go for A/B and if required go for A/C or B/C mill operation.
6.2.6 Maintain furnace oxygen at about 2.8-3.5% for Indian coal. Maintain furnace oxygen at about
3.8-4.5% for blended coal operation
6.2.7 Maintain the PA fan outlet pressure as per mill loading with remaining vigilant about the mill
inlet temperature not going above 180 DegC.
6.2.8 Follow the schedule of soot-blower operation (Furnace soot-blower/Fixed rotary and Long
Retractable once daily as per requirement.
6.2.9 Desk operator should always communicate with the coal handling person regarding coal
quality during two mill operation.
6.2.10 Desk operator must always communicate with the Ash handling operating personnel
regarding Bottom ash generation its quality and evacuation status.
6.2.11 It is strongly recommended to operate the other standby mills for 10hrs in every two days
especially in summer season to prevent fire in the Bunker.
6.2.12 Strict adherence of schedule mill changeover to be followed during blending coal operation as
per (6.2.11).
6.2.13 Water sprinkling to be done in shutdown unit bunkers if smoke comes out with proper
communication with main control room.
Prepared by :Avishek Moitra Revised By : Chaitanya Anand Date of Issue : 10.05.2015
Date of preparation : 04.05.2015 Approved By: Susheem Behera Date of review : 03.02.2021
VEDANTA LIMITED, LANJIGARH
Integrated Management System
SOP description: TWO COAL MILL OPERATION
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 121 Revision No: 01
Plant 03.02.2021

6.2.14 It is strongly recommended that take oil gun support if Boiler load goes below 145 TPH.
6.2.15 Three consecutive Mills Operation when moisture of coal above 10 %
6.2.16 Oil gun Support when two Mills in operation or consecutive mills are not in service when
moisture of coal above 10 %

7. QUALITY:

7.1 All the parameters, activities are maintained within prescribed limit.
7.2 Any deviation from the norm is recorded and corrective action is taken accordingly.

8. ENVIRONMENT:

8.1 Ensure stack SPM < 100 mg/NM3


8.2 Ensure Stack temperature around 155 Deg. C.

9. OHSAS:

9.1 Persons deployed on the work must use safety helmets, shoes, goggles, dust masks & hand gloves.
9.2 Before starting of any operation, ensure all standard clearance from main control room and shift in charge.

10 ENERGY:
11 RECORD: VL/CPP/OPER/FILE/05

12. Amendment Table:

Amendment
Sl No. Description Revision Date
done
1. Proper schedule for mill changeover defined 6.2.11 30/08/2015
Schedule of mill change over during blending
2. 6.2.12 30/08/2015
coal operation defined
Immediate Corrective action for shutdown
3. 6.2.13 30/08/2015
unit bunker
Blending Coal GCV should be greater than
4. 6.1.2 21/07/2017
3000 Kcal/Kg
It is strongly recommended that take oil gun
5. 6.2.14 21/07/2017
support if Boiler load goes below 145 TPH
6. New points added as RCA 6.2.15/16 10.05.2018

Prepared by :Avishek Moitra Revised By : Chaitanya Anand Date of Issue : 10.05.2015


Date of preparation : 04.05.2015 Approved By: Susheem Behera Date of review : 03.02.2021
VEDANTA LIMITED, LANJIGARH
Integrated Management System
SOP description: TWO COAL MILL OPERATION
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 121 Revision No: 01
Plant 03.02.2021

Document Revision History


VERSION REVISION
DATE CHANGE SUMMARY
NUMBER NUMBER
Version changed:
1. Company name changed(VAL- SSL)
11.09.2013 01 00
2. Indication of Abbreviations, Details of document at the
footer
Version changed:
00
Document format changed.
07.06.2014 02
Content Addition: Equipment safety, Bibliography, Man power
01
required.

Version Changed:
10.05.2015 03 00 1. Company name changed from SSL to Vedanta Limited
2. Company logo changed.

1. Content Addition: Amendment table added.


03.02.2021 03 01
2. Company Logo changed.

Prepared by :Avishek Moitra Revised By : Chaitanya Anand Date of Issue : 10.05.2015


Date of preparation : 04.05.2015 Approved By: Susheem Behera Date of review : 03.02.2021