VEDANTA LIMITED, LANJIGARH

Integrated Management System


SOP description: SEAL AIR FAN OPERATION
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 122 Revision No: 01
Plant 12.08.2020

1. PURPOSE: Star up of Seal air fan


2. SCOPE: All three units
3. RESPONSIBILITY: Desk Engineers
4. DURATION: 5 mins

5. OUTPUT: Proper operation of seal air fan prevents ingress of coal dust to bearing of feeder and mill also
prevents coal ingress in oil system of the milling system.

6. PROCEDURE:

6.1 PRE-CHECKS

6.1.1 Equipment is electrically normalized and 415 V supply is available.


6.1.2 Local control switches in remote mode.
6.1.3 No fault indication is coming in relay panel.
6.1.4 Fan suction damper is in open condition (50-70%) (full open in case of VFD)
6.1.5 VFD OP should be zero before starting.
6.1.6 Fan discharge is in closed condition.
6.1.7 Standby fan discharge is in closed condition (if not running) and bearing oil level is not less than 60%.

6.2 STARTING PROCEDURE:

6.2.1. Start Fan Motor and ensure that motor current.


6.2.2. Gradually increase the speed in case of VFD.
6.2.3. Observe full opening of fan discharge damper in Auto.
6.2.4. Gradually open fan suction damper as per requirement.
6.2.5. Open individual Mill inlet seal air manually and motorized valve as per requirement.

6.3. Post check:

6.3.1. Motor current should be normal.


6.3.2. Motor and fan bearing temperature should be within limited (feel with hand and temperature Gun,
not greater than 70 0C)
6.3.3. Motor and fan bearing vibration should be normal.
6.3.4. Check no abnormal sound is coming from fan and motor and no leakage is present.

7. QUALITY:

7.1 All the parameters, activities are maintained within prescribed limit.

Prepared by : Shanti Swaroop


Reviewed By : Chaitanya Anand Date of Issue : 10.05.2015
Sibashish
Approved By: Susheem Behera Date of review : 12.08.2020
Date of preparation : 08.04.2008
VEDANTA LIMITED, LANJIGARH
Integrated Management System
SOP description: SEAL AIR FAN OPERATION
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 122 Revision No: 01
Plant 12.08.2020

7.2 Any deviation from the norm is recorded and corrective action is taken accordingly

8. ENVIRONMENT: NA

9. OHSAS:

9.1 Persons deployed on the work must use safety helmets, shoes, goggles, dust masks & hand gloves.
9.2 Before starting of any operation, ensure all standard clearance from main control room and shift in charge.
9.3 Ensure deployment of a group of people (2 or more) while carrying out job in an isolated or deserted
place in night shift.

10. ENERGY:-
11. RECORDS: VL/CPP/OPER/FILE/05

12. Amendment table:

Sl No. Description Amendment done Revision date


1. 6.1.5 & 6.2.2 added for VFD’s New line added 22.08.2018
2.

Document Revision History


VERSION REVISION
DATE CHANGE SUMMARY
NUMBER NUMBER

Version Changed:
10.05.2015 03 00 1. Company name changed from SSL to Vedanta Limited
2. Company logo changed.

1. Company logo changed.


12.08.2020 03 01 2. Content Addition: Amendment table added.

Prepared by : Shanti Swaroop


Reviewed By : Chaitanya Anand Date of Issue : 10.05.2015
Sibashish
Approved By: Susheem Behera Date of review : 12.08.2020
Date of preparation : 08.04.2008