You are on page 1of 3

VEDANTA LIMITED, LANJIGARH

Integrated Management System


SOP description: START UP AND OPERATION OF HIGH LEVEL DRAIN PUMP
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 138 Revision No: 01
Plant 16.01.2021

1. PURPOSE: Start up and operation of high level drain pump


2. SCOPE: Common system
3. RESPONSIBILITY: Desk Engineers
4. DURATION: 5 mins

5. OUTPUT: Proper operation of High level drain pump is required for preservation and backfilling, hydro
test of Boiler and operated in recirculation while sample checking.

6. PROCEDURE:
6.1 Start Prechecks:

6.1.1 415 V supply should be available.


6.1.2 Discharge valve to be kept closed. Recirculation valve to be kept opened.
6.1.3 High level sampling line isolation valve to be kept closed.
.

6.2. Starting Sequence:-

6.2.1. Open the suction v/v.


6.2.2. Close the discharge v/v.
6.2.3. Oil level should be 70%.
6.2.4. Start the pump (Normal - 100 A)
6.2.5. Discharge pr. should be 8.0 bar.
6.2.6. Now slowly open discharge valve up to requirement and motor current. Recirculation valve to be closed.

6.3. Stopping Procedure:-

6.3.1. Close the discharge valve fully.


6.3.2. Now stop pump from the local panel using local push button. After pump stops, release the push button.
6.3.3. Suction will remain open.

7 QUALITY:

7.1All the parameters, activities are maintained within prescribed limit.


7.2Any deviation from the norm is recorded and corrective action is taken accordingly

8 ENVIRONMENT:

Not applicable.

Prepared by : Avishek Moitra Revised By : Chaitanya Anand Date of Issue : 10.05.2015


Date of preparation : 04.04.2015 Approved By: Susheem Behera Date of review : 16.01.2021
VEDANTA LIMITED, LANJIGARH
Integrated Management System
SOP description: START UP AND OPERATION OF HIGH LEVEL DRAIN PUMP
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 138 Revision No: 01
Plant 16.01.2021

9. OHSAS:

9.1 Persons deployed on the work must use safety helmets, shoes, goggles, dust masks & hand gloves.
9.2 Before starting of any operation, ensure all standard clearance from main control room and shift in charge.
9.3 Ensure deployment of a group of people (2 or more) while carrying out job in an isolated or deserted
place in night shift.

10. ENERGY:
11. RECORDS: VL/CPP/OPER/FILE/05
12. Amendment Table:

Sl No. Description Amendment done Revision date

Prepared by : Avishek Moitra Revised By : Chaitanya Anand Date of Issue : 10.05.2015


Date of preparation : 04.04.2015 Approved By: Susheem Behera Date of review : 16.01.2021
VEDANTA LIMITED, LANJIGARH
Integrated Management System
SOP description: START UP AND OPERATION OF HIGH LEVEL DRAIN PUMP
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 138 Revision No: 01
Plant 16.01.2021

Document Revision History


VERSION REVISION
DATE CHANGE SUMMARY
NUMBER NUMBER
Version changed:
1. Company name changed(VAL- SSL)
11.09.2013 01 00
2. Indication of Abbreviations, Details of document at the
footer
Version changed:
00
Document format changed.
07.06.2014 02
Content Addition: Equipment safety, Bibliography, Man power
01
required.

Version Changed:
10.05.2015 03 00 1. Company name changed from SSL to Vedanta Limited
2. Company logo changed.

Content Addition: Recirculation line operation added.


27.02.2017 03 01
Procedure modified as per requirement.

1. Content Addition: Amendment table added.


16.01.2021 03 01
2. Company Logo changed.

Prepared by : Avishek Moitra Revised By : Chaitanya Anand Date of Issue : 10.05.2015


Date of preparation : 04.04.2015 Approved By: Susheem Behera Date of review : 16.01.2021