REPORT

INITIAL VERTICAL LOAD TEST

ON

RCC CAST- IN SITU PILE

FOR

COMPOSIT WORK @ MS NAHARA & SV-2006

TEST NO. 1

LOCATION: - TP NO-1,

SUBMITTED TO

HPCL

DATE OF TESTING

31th December 2021

SUBMITTED BY

M/S KNY PROJECTS PVT.LTD.


1.0 INTRODUCTION
THE HPCL HAS AWARDED THE WORK OF COMPOSIT WORK @ MS
NAHARA & SV-2006.

2.0 PILE DETAILS

Pile load test was conducted on R.C. Bored pile with diameter 450mm.
Following table summarizes the pile details.

Pile Details
Type of Pile R.C. Bored
Pile Diameter 450 mm

Depth of pile 16 Mt.

Location T.P NO.1


Date of Casting 18.11.2021

Date of Testing 31.12.2021

Method of Test Initial Vertical load test


3.0 DETAIL OF TEST
3.1 Initial Vertical Load test has been carried out as prescribed in IS: 2911
(part-4) 2013 and the result of the same has been derived as per relevant
clauses of code.
3.2 Head of the pile was made to horizontal plane. A 500mm dia. 25mm
thick bearing plate was placed on the head of pile for 1 no. Of Hydraulic
jack capacity 0f 100MT fitted with hydraulic pump and calibrated
pressure gauge of least count 5KN. to rest on the plate. A 500mm x 25
mm thick bearing plate was placed on the top of jack.
3.3 Vertical incremental load of 4.5mt. was applied (as 20 % of the design
load 0.20 X 20.8 = 4.16mt) by obtaining reaction from the loaded
platforms, in accordance with clause 7.1.2 of the above code.
3.4 For recording settlement 4 nos. Calibrated dial gauges each of 0.01 mm
least count were kept on top of plate on pile head by immovable datum
bar.

4.0 TEST PROCEDURE


4.1 Complete set up was adjusted at initial readings after application and
release of small seating load. Vertical incremental load of each
increment of 4.5 MT. was applied and the corresponding settlements
were recorded for each stage of loading on 4 dial gauges.
4.2 As per clause 7.2 of IS: 2911 (part-4) 2013 each stage of loading was
maintained till rate of displacement of the pile top is not more than 0.2
mm/h or until two hours have elapsed, whichever is earlier subject to a
minimum of 1h.The maximum test load will be maintained for 24 h.
4.3 As per clause 7.2.1.1 (b) of IS: 2911 (part-4) 2013, vertical loading on
single shall be continued till one of the following takes place:-
1) Applied load reaches 2.5timesthe safe estimated load; or
2) Maximum settlement of pile exceeds a value of 10 percent of pile
diameter in case of uniform diameter pile and 7.5 percent of bulb diameter in
case of under-reamed pile
5.0 FINDINGS
The result of vertical load test is tabulated as below:-
Vertical Load Test
Design Load = 20.8 TON

Load to be applied = 2.5 Times x 20.8 MT=52 MT

Load applied = 52 MT

Total settlement = 7.43 mm

Net settlement = 6.79 mm

Rebound = 0.64 mm

IN VIEW OF THE ABOVE FINDINGS, AS PER PILE DESIGN LOAD 20.8 TON. THE TOTAL
SETTLEMENT IS LESS THAN 18MM. THE PILE IS SAFE TO CARRY THE DESIGN LOAD
20.8 MT.

Tested by

For M/s R.A.U CONSTRUCTION CO. For M/s KNY PROJECTS PVT.LTD

Authorized Authorized
INITIAL VERTICAL LOAD TEST NO-1

Name of work COMPOSIT WORK @ MS NAHARA & SV-2006.


Name of Client NHAI.

Name of Agency M/s KNY PROJECTS PVT.LTD


Location of Pile T.P. NO.1
Dia of Pile 450mm
Depth of pile 16mtr
Date of Casting 18-11-2021
Date of Testing 31-12-2021
Design Load 20.8 mt
Load to be applied 20.8 x 2.5times = 52mt.
Type of test Initial Vertical load test
Jack Dia. 157 mm
Least count of dial 1div = 0.01mm
gauge
Least count of pressure gauge 1div = 5KN
INITIAL PILE LOAD TEST NO.1 (VERTICAL)
LOCATION: TP. NO. 1
DATE TIME LOAD IN DIAL GAUGE DEFLECTION (in mm ) AVERAGE REMARKS
    M.TON I II III IV DEFL IN MM.  
31/12/2021 5:35pm 0.00 0.00 0.00 0.00 0.00 Initial setting  
31/12/2021 5:40 4.5 0.05 0.14 0.15 0.20 0.13  
31/12/2021 6:40 4.5 0.05 0.14 0.15 0.20 0.13  
31/12/2021 6:40 9.0 0.13 0.21 0.24 0.28 0.21  
31/12/2021 7:40 9.0 0.13 0.21 0.24 0.28 0.21  
31/12/2021 7:40 13.5 0.17 0.25 0.27 0.30 0.24  
31/12/2021 8:40 13.5 0.19 0.26 0.27 0.31 0.25  
31/12/2021 8:40 18.0 0.22 0.29 0.29 0.33 0.28  
31/12/2021 9:40 18.0 0.24 0.31 0.32 0.34 0.30  
31/12/2021 9:40 22.5 0.28 0.36 0.34 0.39 0.34  
31/12/2021 10:40 22.5 0.29 0.38 0.36 0.42 0.36  
31/12/2021 10:40 27.0 0.39 0.44 0.43 0.48 0.43  
31/12/2021 11:40 27.0 0.45 0.48 0.46 0.49 0.47  
31/12/2021 11:40 31.5 0.75 0.82 0.86 0.87 0.82  
1/1/2022 12:40am 31.5 0.95 0.83 0.98 0.99 0.93  
1/1/2022 12:40 36.0 1.25 1.31 1.14 1.45 1.28  
1/1/2022 1:40 36.0 1.30 1.38 1.25 1.55 1.37  
1/1/2022 1:40 40.5 2.04 2.10 2.02 2.15 2.07  
1/1/2022 2:40 40.5 2.15 2.20 2.20 2.25 2.20  
1/1/2022 2:40 45.0 3.04 3.10 3.16 3.20 3.12  
1/1/2022 3:40 45.0 3.12 3.19 3.22 3.31 3.21  
1/1/2022 3:40 49.5 4.10 4.15 4.18 4.21 4.16  
1/1/2022 4:40 49.5 4.20 4.25 4.30 4.36 4.27  
1/1/2022 4:40 52.0 5.45 5.52 5.66 5.73 5.59  
  LOAD MAINTAINED FOR 24 HRS.    
1/1/2022 5:40 52.0 5.55 5.60 5.70 5.80 5.66  
1/1/2022 6:40 52.0 5.67 5.75 5.81 5.92 5.78  
1/1/2022 7:40 52.0 5.74 5.84 5.92 6.05 5.88  
1/1/2022 8:40 52.0 5.87 5.93 6.01 6.10 5.97  
1/1/2022 9:40 52.0 5.94 5.99 6.09 6.15 6.04  
1/1/2022 10:40 52.0 6.03 6.09 6.16 6.21 6.12  
1/1/2022 11:40 52.0 6.11 6.18 6.22 6.30 6.20  
1/1/2022 12:40:pm 52.0 6.19 6.25 6.29 6.37 6.27  
1/1/2022 1:40 52.0 6.26 6.31 6.38 6.43 6.34  
1/1/2022 2:40 52.0 6.34 6.38 6.44 6.49 6.41  
1/1/2022 3:40 52.0 6.39 6.43 6.48 6.54 6.46  
1/1/2022 4:40 52.0 6.44 6.51 6.57 6.61 6.53  
1/1/2022 5:40 52.0 6.52 6.59 6.64 6.73 6.62  
1/1/2022 6:40 52.0 6.58 6.63 6.69 6.77 6.66  
1/1/2022 7:40 52.0 6.65 6.70 6.76 6.83 6.73  
1/1/2022 8:40 52.0 6.73 6.77 6.81 6.88 6.79  
1/1/2022 9:40 52.0 6.79 6.82 6.87 6.94 6.85  
1/1/2022 10:40 52.0 6.87 6.90 6.93 6.99 6.92  
1/1/2022 11:40 52.0 6.94 6.97 6.99 7.04 6.98  
2/1/2022 12:40am 52.0 7.01 7.06 7.09 7.11 7.06  
2/1/2022 1:40 52.0 7.11 7.14 7.18 7.20 7.15  
2/1/2022 2:40 52.0 7.19 7.21 7.26 7.32 7.24  
2/1/2022 3:40 52.0 7.28 7.32 7.35 7.39 7.33  
2/1/2022 4:40 52.0 7.35 7.42 7.46 7.49 7.43  
2/1/2022 5:40 52.0 7.35 7.42 7.46 7.49 7.43  
    LOAD RELEASED    
2/1/2022 5:40am 49.5 7.30 7.36 7.40 7.39 7.36  
2/1/2022 5:55 49.5 7.24 7.31 7.33 7.30 7.29  
2/1/2022 5:55 45.0 7.20 7.25 7.26 7.23 7.23  
2/1/2022 6:10 45.0 7.20 7.25 7.26 7.23 7.23  
2/1/2022 6:10 40.5 7.12 7.20 7.22 7.20 7.18  
2/1/2022 6:25 40.5 7.12 7.20 7.22 7.20 7.18  
2/1/2022 6:25 36.0 7.06 7.12 7.16 7.18 7.13  
2/1/2022 6:40 36.0 7.06 7.12 7.16 7.18 7.13  
2/1/2022 6:40 31.5 6.99 7.03 7.08 7.09 7.04  
2/1/2022 6:55 31.5 6.99 7.03 7.08 7.09 7.04  
2/1/2022 6:55 27.0 6.92 6.96 7.01 7.03 6.98  
2/1/2022 7:10 27.0 6.92 6.96 7.01 7.03 6.98  
2/1/2022 7:10 22.5 6.86 6.91 6.96 7.00 6.93  
2/1/2022 7:25 22.5 6.86 6.91 6.96 7.00 6.93  
2/1/2022 7:25 18.0 6.81 6.86 6.92 6.98 6.89  
2/1/2022 7:40 18.0 6.76 6.78 6.87 6.91 6.83  
2/1/2022 7:40 13.5 6.76 6.78 6.87 6.91 6.83  
2/1/2022 7:55 13.5 6.76 6.78 6.87 6.91 6.83  
2/1/2022 7:55 9.0 6.73 6.74 6.83 6.89 6.79  
2/1/2022 8:10 9.0 6.73 6.74 6.83 6.89 6.79  
2/1/2022 8:10 4.5 6.73 6.74 6.83 6.89 6.79  
2/1/2022 8:25 4.5 6.73 6.74 6.83 6.89 6.79  
2/1/2022 8:25 0.0 6.73 6.74 6.83 6.89 6.79  

TOTAL SETTLEMENT= 7.43 mm


NET SETTLEMENT= 6.79 mm
REBOND= 0.64 mm
GRAPH
COMPOSIT WORK @ MS NAHARA & SV-2006.
LOCATION: T.P NO.1

0 10 20 30 40 50 60
0

3
SETTLEMENT IN mm

LOAD IN M.TON