Site

Possessio
n Major Construction
Logic Flow

Design / Material /
Method Statement /
Drawing
Submissions and
Approval

Procurement,
Manufacturing and
Delivery to Site

Foundation Works

Viaduct ISH Station SVP Station


Construction Construction Construction

ABWF BS ABWF BS ABWF BS


Degree Degree Degree Degree Degree Degree
1 1 1 1 1 1

TTM

Handover
to / Allow Major
RSS
Contracto Construction
r Access
Logic Flow of
other Area

C110 ABWF Degree 2 & 3 BS Degree 2 & 3


Installation
Works and
T&C

T&C and Ready for CB


Inspection Legend:

Logic Path

Milestone 16 Key Date / Milestone

Remaining ABWF and Activity


BS Works, Defect CB Inspection
Rectification

Logic Path By C110

Handover to Operator

Milestone 17

C390B -Logic Flow Diagram


Site
Possessio
n Major Construction
Logic Flow

Design / Material /
Method Statement /
Drawing Submissions
and Approval

Procurement,
Manufacturing and
Delivery to Site

Foundation Works Retaining Wall


Construction

Excavation and
Lateral Support
Installation

Station Structure / Back Fill and


Tunnel Structure TTM
Waterproofing Test
Construction

Major
ABWF Degree 1 BS Degree 1
Construction
Logic Flow of
other Area

Handover
to / Allow
CC10
Access

C110
Installation ABWF Degree 2 & 3 BS Degree 3
Works and
T&C
Legend:

Logic Path

T&C and Ready for CB Landscape and


Inspection Roadworks Key Date / Milestone

Milestone 18 Activity

Remaining ABWF and Logic Path By C110


BS Works, Defect CB Inspection
Rectification

Handover to Operator

Milestone 19

Logic Flow Diagram C340B - MAIN WORKS FOR BARRA STATION