Professional Documents
Culture Documents
Prepare, KPI
upload and Material Installation
PWO Integration Verification (Link RFS
approval on Site and
Integration Budget) declaration
document DP Commisioning
NOC
SF
Internal Approval End To End Site Implementation & Acceptance
Process
SLA in Business
No Project Phase Documentation SF Reviewer SF Approver Remark
Days
-.SDP, CAF & TSSR
ITC Mgr
1 Implementation -.IP MW Parameters 3 ITC Engineer Planning MW upload
Planning MW Mgr
-.BOM MW as plan
TOTAL 16 5 10
ZTE SF Head of Acceptance Mngmnt Project Manager SF Head of NTI SF Head of NPI SF Head of RNOM SF Head of NOC SF Head of SQM SF Head of RAN & Transport Planning SF Head of Contract Mngmnt
Xiong Lei Ery Nurtanto Ran Charan Ishak Halim Hari Kumar Mathias AG Kumaran N Chetan K Agrawal Kalpamadhav Biswal Imrana Thiam De Tamba
Date: Date: Date: Date: Date: Date: Date: Date: Date: Date:
Notes :
• PO Service only, No GAC, PAC, RFS
• Propose one time acceptance
• KPI for throughput link budget only
• Material from SF, ZTE pick up from SF Warehouse
• BOM Plan upload by SF planning
• Acceptance split with E-Node B and not become
pre-requisite for ENB PAC Process
• ISR not required