Name Of Work :-Construction of CC Road at Heruru Village,Kasaba

Hobali in Hosadurga Tq,.Est Cost:50 lakhs


Scheme : Bayaluseeme Development 2021-22
Sl. Executed the items as mentioned in the Estimate Remarks
No.

Cement Concrete Pavement


Loosening, leveling and Compacting original ground supporting
1. Completed
embankment to facilitate placement of first layer of embankment, scarified to
a depth of 150 mm, mixed with water at OMC and then compacted by rolling Satisfactorily.
so as to achieve minimum dry density as given in Table 300-2 for
embankment construction.(V3,P.NO-15, I. NO-3.7)
1. Somashekara house to Govt School -150x3.5x0.15m
2. HR Govindappa house to Lakkappa house-30x4.0x0.15m
3. Lakkappa house to HL Nagarajappa house-70x4.0x0.15m
4. PWD main road-30x4.0x0.15m
5. Nagarajappa house to Mini water tank-150x4.0x0.15m
6. Around Hatti Lakkamma Temple-18x10.0x0.15m
2x(15x1.9x0.15m)
10x5.0x0.15m
    
10x5.0x0.15m
7. Other roads - 213x4.0x0.15m
Removal of unserviceable soil including excavation, loading and disposal
2. Completed
up to a suitable distance as directed by the engineer incharege of
work(V3,P.NO-15, I. NO-3.1)t excluding replacement by suitable soil Satisfactorily.
which shall be paid separately as per cluase 300.5 complete as per
specification.
Construction of sub-grade and earthen shoulder with approved material
3.
obtained from borrow pits with all lift and leads, transporting to site
spreading, grading to required slope and compacted to meet requirement of
Sl. Executed the items as mentioned in the Estimate Remarks
No.
table no 300-2 (V3, P.NO-15, I.NO-3.6)
Completed
1.Somashekara house to Govt School -150x3.5x0.15m
2.HR Govindappa house to Lakkappa house-30x4.0x0.15m Satisfactorily.
3.Lakkappa house to HL Nagarajappa house-70x4.0x0.15m
4.PWD main road-30x4.0x0.15m
5.Nagarajappa house to Mini water tank-150x4.0x0.15m
6.Around Hatti Lakkamma Temple-18x10.0x0.15m
2x(15x1.9x0.15m)
2x(10x5.0x0.15m)
7.Other roads - 213x4.0x0.15m
8. Shoulders-696x0.6x0.125m
Providing, laying, spreading and compacting graded stone aggregate to
4. Completed
wet mix macadam specification including premixing the Material with water
at OMC in mechanical mix plant carriage of mixed Material by tipper to site, Satisfactorily.
laying in(V3,P.NO-21, I. NO-4.21) requirement Table 300- 2 complete as
per specifications.(which includes cost of gravel / murrum, watering charges
& compaction by vibratory roller) .
1.Somashekara house to Govt School -150x3.5x0.15m
2.HR Govindappa house to Lakkappa house-30x4.0x0.15m
3.Lakkappa house to HL Nagarajappa house-70x4.0x0.15m
4.PWD main road-30x4.0x0.15m
5.Nagarajappa house to Mini water tank-150x4.0x0.15m
6.Around Hatti Lakkamma Temple-18x10.0x0.15m
2x(15x1.9x0.15m)
10x5.0x0.15m
10x5.0x0.15m
7.Other roads - 183x4.0x0.15m
Sl. Executed the items as mentioned in the Estimate Remarks
No.
KSRRB M600-1. Construction of dry lean cement concrete Sub- base
5. Completed
over a prepared sub-grade with coarse and fine aggregate conforming to IS:
383, the size of coarse aggregate not exceeding 25 mm, aggregate cement Satisfactorily.
ratio not to exceed 15:1, aggregate gradation after blending to be as per
Table 600-1, cement content not to be less than 150 kg/ cum, optimum
moisture content to be determined during trial length construction, concrete
strength not to be less than 10 Mpa at 7 days, mixed in a batching plant,
transported to site, laid with a paver with electronic sensor, compacting with
8-10 tonnes vibratory roller, finishing and curing complete as per
specifications. MORTH Specification No. 601 (Page.174/Item No. 22.1.2)
Other Roads-30x4.0x0.15m
Providing and constructing un-reinforced plain cement concrete
6. Completed
pavement, thickness as per design, over a prepared sub base, with 43 grade
cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and Satisfactorily.
fine aggregates conforming to IS:383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum
capacity and appropriate weigh batcher using approved mix design, laid in
approved fixed side formwork (steel channel, laying and fixing of 125
micron thick polythene film, wedges, steel plates including levelling the
formwork as per drawing), spreading the concrete with shovels, rakes,
compacted using needle, screed and plate vibrators and finished in
continuous operation including construction joints, , primer, sealant , curing
of concrete slabs for 14days, and water finishing to lines and grade as per
drawing and technical specification clause 1501 with all lead, lifts, loading
& unloading charges, cost and conveyance of all materials, labour,
equipments etc., complete. as per the directions of the Engineer-in-charge of
the work.(V3, P. NO-138, I NO-20.29
Sl. Executed the items as mentioned in the Estimate Remarks
No.
1.Somashekara house to Govt School -150x3.5x0.15m
2.HR Govindappa house to Lakkappa house-30x4.0x0.15m
3.Lakkappa house to HL Nagarajappa house-70x4.0x0.15m
4.PWD main road-30x4.0x0.15m
5.Agarajappa house to Mini water tank-150x4.0x0.15m
6.Around Hatti Lakkamma Temple-18x10.0x0.15m
2x(15x1.9x0.15m)
10x5.0x0.15m
10x5.0x0.15m
7.Other roads - 213x4.0x0.15m
Providing and fixing RCC name board of size
7. Completed
1.35xk0.60x0.04 mtrs fixed in reinforced cement concrete poles
Satisfactorily.
(MR)

Remarks : This is to certify that the above said work found satisfactory at the time and date of
inspection only.

AUTHORISED SIGNATURE
Ref : AEE/Hosadurga

To,
The Assistant Executive Engineer,
KRIDL
Hosadurga

Sir,

Sub: Submission of third party inspection & Material Testing reports.


Ref: HQRS/KRIDL/2018-19/208 Dated:05.02.2019.

1 Name of the Work Construction of CC Road at Heruru


Village,Kasaba Hobali in Hosadurga Tq,.
2. Date of Inspection 14.09.2022
3 Name of the work done Construction of CC Road at Heruru
Village,Kasaba Hobali in Hosadurga Tq,.
4 Name of the Agency KRIDL, Hosadurga
5 In the presence of AEE, KRIDL, Hosadurga
6 Estimated cost of the project Rs.50.00 Lakhs
7 Head of Account

Authorised Signature
TEST REPORT ON CUBE M30.
To,
The Assisstant Executive Engineer,
KRIDL, Hosadurga.

Kind Attn :- The Asst., Executive Engineer, KRIDL Sub Division, Hosadurga

Sub :- Cube M30 for CC Road.


Name of work :- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga
Tq,..
Standard followed :- (IS-456 : 2000 for concreting) IS 516 : 1959
Grade :- Size of cubes (in cms) :- 15 x 15 x 15
At Somashekara house to Govt School -150m
Compres Avg.,
Weight Maxim Cross
sive compress
Sl. Notation of of um section Date of Date of
strength ive
No. cubes cubes load area casting testing
in strength
(in Kg) (KN) (mm2)
N/mm2 N/mm2
For 7 Days
1 CC Road 8.86 458 22500 21.05
2 8.87 425 22500 21.25 21.15
3 8.90 420 22500 21.15
For 28 Days
1 CC Road 8.90 528 22500 30.85
2 9.63 536 22500 30.22 30.40
3 8.74 530 22500 30.11
As per IS 456 : 2000 Recommendations
Grade 7 – Days 28- Days
M30 21.15 30.40
Remarks : Test confirms to IS – 456 : 2000

Note :
1) Samples are received by the KRIDL engineer
2) This report is not for the arbitration or evidence in legal dispute is forbidden
3) The laboratory is only responsible for the items collected.

Authorised Signature
TEST REPORT ON CUBE M30.
To,
The Assisstant Executive Engineer,
KRIDL, Hosadurga.

Kind Attn :- The Asst., Executive Engineer, KRIDL Sub Division, Hosadurga

Sub :- Cube M30 for CC Road.


Name of work :- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga
Tq,..
Standard followed :- (IS-456 : 2000 for concreting) IS 516 : 1959
Grade :- Size of cubes (in cms) :- 15 x 15 x 15
At HR Govindappa house to Lakkappa house-30m
Compres Avg.,
Weight Maxim Cross
sive compress
Sl. Notation of of um section Date of Date of
strength ive
No. cubes cubes load area casting testing
in strength
(in Kg) (KN) (mm2)
N/mm2 N/mm2
For 7 Days
1 CC Road 8.95 458 22500 21.15
2 8.85 425 22500 21.25 21.28
3 8.80 420 22500 21.45
For 28 Days
1 CC Road 8.90 528 22500 30.55
2 9.66 536 22500 30.65 30.55
3 8.80 530 22500 30.45
As per IS 456 : 2000 Recommendations
Grade 7 – Days 28- Days
M30 21.28 30.55
Remarks : Test confirms to IS – 456 : 2000

Note :
4) Samples are received by the KRIDL engineer
5) This report is not for the arbitration or evidence in legal dispute is forbidden
6) The laboratory is only responsible for the items collected.

Authorised Signature
TEST REPORT ON CUBE M30.
To,
The Assisstant Executive Engineer,
KRIDL, Hosadurga.

Kind Attn :- The Asst., Executive Engineer, KRIDL Sub Division, Hosadurga

Sub :- Cube M30 for CC Road.


Name of work :- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga
Tq,..
Standard followed :- (IS-456 : 2000 for concreting) IS 516 : 1959
Grade :- Size of cubes (in cms) :- 15 x 15 x 15
At Lakkappa house to HL Nagarajappa house-70m
Compres Avg.,
Weight Maxim Cross
sive compress
Sl. Notation of of um section Date of Date of
strength ive
No. cubes cubes load area casting testing
in strength
(in Kg) (KN) (mm2)
N/mm2 N/mm2
For 7 Days
1 CC Road 8.86 458 22500 21.45
2 8.87 425 22500 21.35 21.45
3 8.90 420 22500 21.55
For 28 Days
1 CC Road 8.90 528 22500 30.85
2 9.63 536 22500 30.22 30.39
3 8.74 530 22500 30.11
As per IS 456 : 2000 Recommendations
Grade 7 – Days 28- Days
M30 21.45 30.39
Remarks : Test confirms to IS – 456 : 2000

Note :
7) Samples are received by the KRIDL engineer
8) This report is not for the arbitration or evidence in legal dispute is forbidden
9) The laboratory is only responsible for the items collected.

Authorised Signature
TEST REPORT ON CUBE M30.
To,
The Assisstant Executive Engineer,
KRIDL, Hosadurga.

Kind Attn :- The Asst., Executive Engineer, KRIDL Sub Division, Hosadurga

Sub :- Cube M30 for CC Road.


Name of work :- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga
Tq,..
Standard followed :- (IS-456 : 2000 for concreting) IS 516 : 1959
Grade :- Size of cubes (in cms) :- 15 x 15 x 15
At PWD main road-30m
Compres Avg.,
Weight Maxim Cross
sive compress
Sl. Notation of of um section Date of Date of
strength ive
No. cubes cubes load area casting testing
in strength
(in Kg) (KN) (mm2)
N/mm2 N/mm2
For 7 Days
1 CC Road 8.86 458 22500 21.10
2 8.85 425 22500 21.85 21.64
3 8.90 420 22500 21.99
For 28 Days
1 CC Road 8.86 528 22500 31.00
2 9.60 536 22500 30.85 30.80
3 8.70 530 22500 30.55
As per IS 456 : 2000 Recommendations
Grade 7 – Days 28- Days
M30 21.64 30.80
Remarks : Test confirms to IS – 456 : 2000

Note :
10) Samples are received by the KRIDL engineer
11) This report is not for the arbitration or evidence in legal dispute is forbidden
12) The laboratory is only responsible for the items collected.

Authorised Signature
TEST REPORT ON CUBE M30.
To,
The Assisstant Executive Engineer,
KRIDL, Hosadurga.

Kind Attn :- The Asst., Executive Engineer, KRIDL Sub Division, Hosadurga

Sub :- Cube M30 for CC Road.


Name of work :- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga
Tq,..
Standard followed :- (IS-456 : 2000 for concreting) IS 516 : 1959
Grade :- Size of cubes (in cms) :- 15 x 15 x 15
At Agarajappa house to Mini water tank-150m
Compres Avg.,
Weight Maxim Cross
sive compress
Sl. Notation of of um section Date of Date of
strength ive
No. cubes cubes load area casting testing
in strength
(in Kg) (KN) (mm2)
N/mm2 N/mm2
For 7 Days
1 CC Road 8.86 458 22500 21.50
2 8.87 425 22500 22.00 21.78
3 8.90 420 22500 21.85
For 28 Days
1 CC Road 8.90 528 22500 31.25
2 9.63 536 22500 31.15 31.13
3 8.74 530 22500 31.00
As per IS 456 : 2000 Recommendations
Grade 7 – Days 28- Days
M30 21.78 31.13
Remarks : Test confirms to IS – 456 : 2000

Note :
13) Samples are received by the KRIDL engineer
14) This report is not for the arbitration or evidence in legal dispute is forbidden
15) The laboratory is only responsible for the items collected.

Authorised Signature
TEST REPORT ON CUBE M30.
To,
The Assisstant Executive Engineer,
KRIDL, Hosadurga.

Kind Attn :- The Asst., Executive Engineer, KRIDL Sub Division, Hosadurga

Sub :- Cube M30 for CC Road.


Name of work :- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga
Tq,..
Standard followed :- (IS-456 : 2000 for concreting) IS 516 : 1959
Grade :- Size of cubes (in cms) :- 15 x 15 x 15
At Around Hatti Lakkamma Temple-18m,10m,10m and 15m
Compres Avg.,
Weight Maxim Cross
sive compress
Sl. Notation of of um section Date of Date of
strength ive
No. cubes cubes load area casting testing
in strength
(in Kg) (KN) (mm2)
N/mm2 N/mm2
For 7 Days
1 CC Road 8.80 458 22500 21.10
2 8.70 425 22500 22.00 21.65
3 8.95 420 22500 21.85
For 28 Days
1 CC Road 8.90 528 22500 31.85
2 9.63 536 22500 31.22 31.39
3 8.74 530 22500 31.11
As per IS 456 : 2000 Recommendations
Grade 7 – Days 28- Days
M30 21.65 31.39
Remarks : Test confirms to IS – 456 : 2000

Note :
16) Samples are received by the KRIDL engineer
17) This report is not for the arbitration or evidence in legal dispute is forbidden
18) The laboratory is only responsible for the items collected.

Authorised Signature
TEST REPORT ON CUBE M30.
To,
The Assisstant Executive Engineer,
KRIDL, Hosadurga.

Kind Attn :- The Asst., Executive Engineer, KRIDL Sub Division, Hosadurga

Sub :- Cube M30 for CC Road.


Name of work :- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga
Tq,..
Standard followed :- (IS-456 : 2000 for concreting) IS 516 : 1959
Grade :- Size of cubes (in cms) :- 15 x 15 x 15
Other roads - 75 m
Compres Avg.,
Weight Maxim Cross
sive compress
Sl. Notation of of um section Date of Date of
strength ive
No. cubes cubes load area casting testing
in strength
(in Kg) (KN) (mm2)
N/mm2 N/mm2
For 7 Days
1 CC Road 8.86 458 22500 21.25
2 8.87 425 22500 21.85 21.70
3 8.90 420 22500 22.00
For 28 Days
1 CC Road 8.90 528 22500 31.25
2 9.63 536 22500 30.95 30.90
3 8.74 530 22500 30.50
As per IS 456 : 2000 Recommendations
Grade 7 – Days 28- Days
M30 21.70 30.90
Remarks : Test confirms to IS – 456 : 2000

Note :
19) Samples are received by the KRIDL engineer
20) This report is not for the arbitration or evidence in legal dispute is forbidden
21) The laboratory is only responsible for the items collected.

Authorised Signature
TEST REPORT ON CUBE M30.
To,
The Assisstant Executive Engineer,
KRIDL, Hosadurga.

Kind Attn :- The Asst., Executive Engineer, KRIDL Sub Division, Hosadurga

Sub :- Cube M30 for CC Road.


Name of work :- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga
Tq,..
Standard followed :- (IS-456 : 2000 for concreting) IS 516 : 1959
Grade :- Size of cubes (in cms) :- 15 x 15 x 15
Other roads - 75 m
Compres Avg.,
Weight Maxim Cross
sive compress
Sl. Notation of of um section Date of Date of
strength ive
No. cubes cubes load area casting testing
in strength
(in Kg) (KN) (mm2)
N/mm2 N/mm2
For 7 Days
1 CC Road 8.86 458 22500 21.10
2 8.87 425 22500 22.00 21.61
3 8.90 420 22500 21.85
For 28 Days
1 CC Road 8.90 528 22500 31.85
2 9.63 536 22500 31.22 31.40
3 8.74 530 22500 31.11
As per IS 456 : 2000 Recommendations
Grade 7 – Days 28- Days
M30 21.61 31.40
Remarks : Test confirms to IS – 456 : 2000

Note :
22) Samples are received by the KRIDL engineer
23) This report is not for the arbitration or evidence in legal dispute is forbidden
24) The laboratory is only responsible for the items collected.

Authorised Signature
TEST REPORT ON CUBE M30.
To,
The Assisstant Executive Engineer,
KRIDL, Hosadurga.

Kind Attn :- The Asst., Executive Engineer, KRIDL Sub Division, Hosadurga

Sub :- Cube M30 for CC Road.


Name of work :- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga
Tq,..
Standard followed :- (IS-456 : 2000 for concreting) IS 516 : 1959
Grade :- Size of cubes (in cms) :- 15 x 15 x 15
Other roads - 63 m
Compres Avg.,
Weight Maxim Cross
sive compress
Sl. Notation of of um section Date of Date of
strength ive
No. cubes cubes load area casting testing
in strength
(in Kg) (KN) (mm2)
N/mm2 N/mm2
For 7 Days
1 CC Road 8.75 458 22500 21.55
2 8.85 425 22500 21.75 21.76
3 8.90 420 22500 22.00
For 28 Days
1 CC Road 8.90 528 22500 31.00
2 9.63 536 22500 30.95 31.06
3 8.74 530 22500 31.25
As per IS 456 : 2000 Recommendations
Grade 7 – Days 28- Days
M30 21.76 31.06
Remarks : Test confirms to IS – 456 : 2000

Note :
25) Samples are received by the KRIDL engineer
26) This report is not for the arbitration or evidence in legal dispute is forbidden
27) The laboratory is only responsible for the items collected.

Authorised Signature
TEST REPORT ON COURSE AGGREGATES
IS383-1970 (RA- 2002)
Client : Assistant Executive Engineer, KRIDL, Hosadurga
Agency : A.B.C Technical Consultants and Testing Centre, Mysore
Name of work : Construction of CC Road at Heruru Village,Kasaba Hobali in
    Hosadurga Tq,..
.
Reference : AEE/ Hosadurga /Thirdpartyinspectionreport2020/No-
Date of Testing :
Material : 20 mm Aggregate Totals Wt. Of Aggregates in gms= 5000

Cumulative
Cumulative
Is Sieve Weight Retained Retained Retained
Weight Passing Spec.Limits
Size in mm (gm) Weight in % Weight in
in %
%
40 0 0 0 100 100
20 202 4.0 4 96.0 95-100
10 2743 54.9 58.9 41.1 25-55
4.75 1628 32.6 91.5 8.5 0-10
Physical Properties
Specific Gravity 2.60
Water Absorption 0.25%
Dry rodded Bulk Density 1455 kg/m3
loose rodded Bulk Density 1405 kg/m3
Note:
1. Samples are received by the concerned engineer
2. The report shall not be reproduced, except in full, without the written approval of the
laboratory.
3. The results indicated above are based on the tests carried out on the samples received
in the laboratory.
4. Any Query regarding the report must be reported immediately

Authorised Signature
TEST REPORT ON COURSE AGGREGATES
IS 383-1970 (RA- 2002)
Client : Assistant Executive Engineer, KRIDL Hosadurga
Agency : A.B.C Technical Consultants and Testing Centre
Name of work : Construction of CC Road at Heruru Village,Kasaba Hobali in
     Hosadurga Tq,..
Reference : AEE/ Hosadurga /Thirdpartyinspectionreport2020
Date of Testing :
Material : 40mm (Course Aggregates)
Total Wt. Of Aggregates in gms=15000

Cumulative Cumulative
Is Sieve Size Weight Retained
Retained Weight Passing Spec.Limits
in mm Retained (gm) Weight in %
Weight in % in %
80 0 0 0 100 100
40 256 1.71 1.71 98.29 95-100
20 8732 58.21 59.92 40.08 30-70
10 3173 21.15 81.07 18.93 10-35
4.75 2476 16.51 97.58 2.42 0-5
Physical Properties
Specific Gravity 2.62
Water Absorption 0.20%
Dry rodded Bulk Density 1500kg/m3
loose rodded Bulk Density 1450 kg/m3
Note:
1. Samples are received by the concerned engineer
2. The report shall not be reproduced, except in full, without the written approval of the
laboratory.
3. The results indicated above are based on the tests carried out on the samples received
in the laboratory.
4. Any Query regarding the report must be reported immediately

Authorised Signature
TEST REPORT ON FINE AGGREGATES (SAND)
IS383-1970 (RA- 2002)
Client : Assistant Executive Engineer, KRIDL Hosadurga
Agency : A.B.C Technical Consultants and Testing Centre
Name of work : Construction of CC Road at Heruru Village,Kasaba Hobali in
     Hosadurga Tq,...
Reference : AEE/ Hosadurga /Thirdpartyinspectionreport2020
Date of Testing :
Material : Sand
Total Wt. Of Aggregates in gms 1500
Cumulative
Cumulative
Is Sieve Size Weight Retained Retained Retained Spec.Limits
Weight Passing
in mm (gm) Weight in % Weight in For Zone-II
in %
%
10 0 0 0 100 100
4.75 79 5.27 5.27 94.7 90-100
2.36 143 9.53 14.80 85.2 75-100
1.18 281 18.73 33.53 66.5 55-90
600 Micron 283 18.87 52.40 47.6 35-59
300 Micron 394 26.27 78.67 21.3 8-30
150 Micron 278 18.53 97.20 2.8 0-10
Physical Properties
Specific Gravity 2.58
Water Absorption 3.26%
Dry rodded Bulk Density 1600kg/m3
loose rodded Bulk Density 1565 kg/m3
Note:
1. Samples are received by the concerned engineer
2. The report shall not be reproduced, except in full, without the written approval of the
laboratory.
3. The results indicated above are based on the tests carried out on the samples received
in the laboratory.
4. Any Query regarding the report must be reported immediately

Authorised Signature
NAME OF WORK:- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga Tq,.

Photographs after completion of work


NAME OF WORK:- Construction of CC Road at Heruru Village,Kasaba Hobali in Hosadurga Tq,.

Photographs after completion of work