You are on page 1of 18

EMPLOYER STATE ENTERPRISE RADIOACTIVE WASTE

CONTRACTOR GERMAN-BULGARIAN CONSORTIUM "NDF"

AUTO PROJECT LTD


DESIGNER
Bulgaria, Sofia 1144, 50, Sinchets Str.

PROJECT CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

DOCUMENT ID DATE REVISION PAGE / PAGES

AP-R10-WD-ELE-R09 27.02.2023 4 1/18

BUILDING Technical Building


PART Electrical
DOCUMENT Explanatory Note
PHASE Working Design

DESIGNER REVIEWER APPROVER

eng. Aleksandrina Sandova eng. Delyan Atanasov eng. Nikolay Nikolov


Signature Signature Signature

CONCERTED

PART: ARC PART: STR PART: HVC PART: WSS

PART: FES PART: TEC PART: RDM PART: HSP

eng. P. Ignatov eng. P. Shushulov eng. A. Mladenov eng. A. Ivanov

DISTRIBUTION

No. SUBMITTED TO NUMBER OF COPIES LANGUAGE DATE


CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 2 / 18

APPROVALS

Space for stamp of the EMPLOYER Space for stamp of the CONTRACTOR

Space for stamp of ICS Space for stamps of the DESIGN SUPERVISOR

Space for further stamps STATUS


CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 3 / 18

REGISTER OF CHANGES

Rev. Date Description of changes


0 30.06.2017 Edition for the client
- Amendments made according to the following documents: SD NDF SEERАW, Radiana NSV
2015 и EQE Bulgaria AD
1 30.04.2018
- Changing of dimensions of the distribution panels -drawings : SS-R10-WD-ELE-R09-D221, SS-
R10-WD-ELE-R09-D231, SS-R10-WD-ELE-R09-D261 and SS-R10-WD-ELE-R09-D271

- Changing according comments of EQE Bulgaria AD to documents:

- SS-R10-WD-ELE-R09-D112
- SS-R10-WD-ELE-R09-D151
2 20.04.2018 - SS-R10-WD-ELE-R09-D172
- SS-R10-WD-ELE-R09-D201
- SS-R10-WD-ELE-R09-D211
- New positions are added in document SS-R10-WD-ELE-R09-A1
3 30.11.2022 Changes based on Client comments:

- AP-R10-WD-ЕLE-R09-D021
- AP-R10-WD-ЕLE-R09-D031
- AP-R10-WD-ЕLE-R09-D051
- AP-R10-WD-ЕLE-R09-D061
- AP-R10-WD-ЕLE-R09-D071
- AP-R10-WD-ЕLE-R09-D110
- AP-R10-WD-ЕLE-R09-D111
- AP-R10-WD-ЕLE-R09-D112
- AP-R10-WD-ЕLE-R09-D113
- AP-R10-WD-ЕLE-R09-D114
- AP-R10-WD-ЕLE-R09-D115
- AP-R10-WD-ЕLE-R09-D151
- AP-R10-WD-ЕLE-R09-D152
- AP-R10-WD-ЕLE-R09-D161
- AP-R10-WD-ЕLE-R09-D162
- AP-R10-WD-ЕLE-R09-D163
- AP-R10-WD-ЕLE-R09-D171
- AP-R10-WD-ЕLE-R09-D201
- AP-R10-WD-ЕLE-R09-D202
- AP-R10-WD-ЕLE-R09-D203
- AP-R10-WD-ЕLE-R09-D211
- AP-R10-WD-ЕLE-R09-D212
- AP-R10-WD-ЕLE-R09-D213
- AP-R10-WD-ЕLE-R09-D221
- AP-R10-WD-ЕLE-R09-D222
- AP-R10-WD-ЕLE-R09-D223
- AP-R10-WD-ЕLE-R09-D231
- AP-R10-WD-ЕLE-R09-D232
- AP-R10-WD-ЕLE-R09-D233
- AP-R10-WD-ЕLE-R09-D241
- AP-R10-WD-ЕLE-R09-D242
- AP-R10-WD-ЕLE-R09-D243
- AP-R10-WD-ЕLE-R09-D251
- AP-R10-WD-ЕLE-R09-D252
- AP-R10-WD-ЕLE-R09-D253
- AP-R10-WD-ЕLE-R09-D261
- AP-R10-WD-ЕLE-R09-D262
- AP-R10-WD-ЕLE-R09-D263
- AP-R10-WD-ЕLE-R09-D271
- AP-R10-WD-ЕLE-R09-D272
- AP-R10-WD-ЕLE-R09-D273
- AP-R10-WD-ЕLE-R09-D293
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 4 / 18

- Attachment 1: Bill of materials


- Attachment 2: Lighting calculations
- Attachment 3: Power balance
- Attachment 4: Cable lists
Changes based on Client comments:

- AP-R10-WD-ELE-R09-D111
- AP-R10-WD-ELE-R09-D112
- AP-R10-WD-ELE-R09-D113_1-13
- AP-R10-WD-ELE-R09-D151
- AP-R10-WD-ELE-R09-D152_1-8
- AP-R10-WD-ELE-R09-D161
- AP-R10-WD-ELE-R09-D162_1-6
- AP-R10-WD-ELE-R09-D171
- AP-R10-WD-ELE-R09-D201
- AP-R10-WD-ELE-R09-D202_1-6
- AP-R10-WD-ELE-R09-D211
4 27.02.2023
- AP-R10-WD-ELE-R09-D212_1-7
- AP-R10-WD-ELE-R09-D221
- AP-R10-WD-ELE-R09-D222_1-8
- AP-R10-WD-ELE-R09-D232_1-7
- AP-R10-WD-ELE-R09-D251
- AP-R10-WD-ELE-R09-D252_1-6
- AP-R10-WD-ELE-R09-D261
- AP-R10-WD-ELE-R09-D262_1-4
- AP-R10-WD-ELE-R09-D272_1-2
- Attachment 3: Power balance
- Attachment 4: Cable lists
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 5 / 18

CONTENTS

CONTENTS.............................................................................................................................5
LIST OF DRAWINGS..............................................................................................................6
LIST OF ATTACHMENTS......................................................................................................8
LIST OF ABBREVIATIONS....................................................................................................9
1. GENERAL...................................................................................................................10
1.1. Grounds for Design.....................................................................................................10
1.2. Scope of the design part.............................................................................................10
2. POWER TRANSFORMERS L-EA-MT, L-EE-DTR И L-EE-DTR-DG........................11
3. LV SWITCHGEAR L-EB-LVS....................................................................................11
4. LV POWER STARTER BOARDS..............................................................................11
5. FIRE FIGHTING PUMPS. POWER STARTER BOARD L-DA-PSB-01....................12
6. LV DISTRIBUTION PANELS L-EE-ADS AND L-EE-ADS-DG.................................12
7. ELECTRICAL DISTRIBUTION PANEL L-EE-EDP-01..............................................13
8. LIGHTING DISTRIBUTION PANEL L-EE-LDP-01....................................................13
9. UPS ELECTRICAL DISTRIBUTION PANEL L-ED-EDP-01.....................................13
10. ELECTRICAL CONTROL PANEL L- GG-ECP.........................................................13
11. CABLE RACEWAYS..................................................................................................13
11.1. General.......................................................................................................................13
11.2. Main cable raceways..................................................................................................13
11.3. Cable leads to individual consumers and power socket panels.................................14
11.4. Cabling of lighting and current socket installations and HVAC peripheral components
....................................................................................................................................14
12. LIGHTING SYSTEM AND SOCKETS NETWORK....................................................14
13. EARTHING AND LIGHTNING PROTECTION SYSTEMS........................................15
13.1. Earthing system..........................................................................................................15
13.2. Equipotential bonding system.....................................................................................15
13.3. Lightning protection system........................................................................................16
14. MEMO ON SAFE WORK CONDITIONS, FIRE AND EMERGENCY SAFETY........16
14.1. Evaluation of possible hazards for staff......................................................................16
14.2. Measures for protection of the personnel against possible hazards..........................16
14.3. Possible harms and hazards......................................................................................17
14.4. Planned actions..........................................................................................................17
14.5. Healthy and safe working conditions..........................................................................17
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 6 / 18

LIST OF DRAWINGS

No. Drawing No. Drawing Title Rev.


1 SS-R10-WD-ЕLE-R09-D001 Earthing system - Layout 0
2 SS-R10-WD-ЕLE-R09-D002 Equipotential bonding system - Layout 0
3 SS-R10-WD-ЕLE-R09-D011 Lighting protection - Layout 0
4 AP-R10-WD-ЕLE-R09-D021 Cable channels and cable shafts - Layout 3
5 AP-R10-WD-ЕLE-R09-D031 Cable ladders - Layout 3
6 AP-R10-WD-ЕLE-R09-D051 Distribution panels and technology consumers 2
7 AP-R10-WD-ЕLE-R09-D061 Layout and cabling of HVAC consumers 1
8 AP-R10-WD-ЕLE-R09-D071 Lighting and socket network - layout 1
9 AP-R10-WD-ЕLE-R09-D110 LV panels block diagram 0
10 AP-R10-WD-ЕLE-R09-D111 LV switchgears LV-EB-LVS- single line diagram (1 of 2) 2
11 AP-R10-WD-ЕLE-R09-D112 LV switchgears LV-EB-LVS- single line diagram (2 of 2) 4
12 AP-R10-WD-ЕLE-R09-D113 LV switchgears LV-EB-LVS- wiring diagrams 1
13 AP-R10-WD-ЕLE-R09-D114 LV switchgears LV-EB-LVS-fasade 0
14 AP-R10-WD-ЕLE-R09-D115 LV switchgears LV-EB-LVS – ATS Logical Diagram 1
15 AP-R10-WD-ЕLE-R09-D151 Motor starter board L-VA-PSB-01 – single line diagram 5
16 AP-R10-WD-ЕLE-R09-D152 Motor starter board L-VA-PSB-01 –- wiring diagrams 1
Power starter boards L-VA-PSB – feeders control – typical
17 SS-R10-WD-ЕLE-R09-D153 0
diagram
18 AP-R10-WD-ЕLE-R09-D161 Motor starter board L-VA-PSB-02 – single line diagram 3
19 AP-R10-WD-ЕLE-R09-D162 Motor starter board L-VA-PSB-02 –- wiring diagrams 1
20 AP-R10-WD-ЕLE-R09-D163 Motor starter board L-VA-PSB-02 - fasade 0
Fire fighting pumps. Power starter board L-DA-PSB-01 –
21 AP-R10-WD-ЕLE-R09-D171 3
single line diagram
Power starter board L-DA-PSB-01 – main pumps control-
22 SS-R10-WD-ЕLE-R09-D172 1
typical diagram
23 SS-R10-WD-ЕLE-R09-D173 Power starter board L-DA-PSB-01 – jokey pump control 0
Power starter board L-DA-PSB-01 – controller L-GG-PLC02
24 SS-R10-WD-ЕLE-R09-D174 0
interface
Power starter board L-DA-PSB-01 – pumps control - logical
25 SS-R10-WD-ЕLE-R09-D175 0
diagram
26 SS-R10-WD-ЕLE-R09-D176 Power starter board L-DA-PSB-01 – specification 0
Auxiliary distribution switchgear L-EE-ADS – single line
27 AP-R10-WD-ЕLE-R09-D201 3
diagram
Main switchboard auxiliary circuits L-EE-ADS- wiring
28 AP-R10-WD-ЕLE-R09-D202 1
diagrams
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 7 / 18

No. Drawing No. Drawing Title Rev.

29 AP-R10-WD-ЕLE-R09-D203 Main switchboard auxiliary circuits L-EE-ADS- fasade 0

Auxiliary distribution switchgear L-EE-ADS-DG – single line


30 AP-R10-WD-ЕLE-R09-D211 3
diagram
Main switchboard auxiliary systems L-EE-ADS-DG - wiring
31 AP-R10-WD-ЕLE-R09-D212 1
diagrams
32 AP-R10-WD-ЕLE-R09-D213 Main switchboard auxiliary systems L-EE-ADS-DG - fasade 0
Electrical distribution panel L-EE-EDP-01 – single line
33 AP-R10-WD-ЕLE-R09-D221 3
diagram
34 AP-R10-WD-ЕLE-R09-D222 Distribution board L-EE-EDP-01- wiring diagrams 1
35 AP-R10-WD-ЕLE-R09-D223 Distribution board L-EE-EDP-01- facade 0
Lighting distribution panel L-EE-LDP-01 – single line
36 AP-R10-WD-ЕLE-R09-D231 2
diagram

37 AP-R10-WD-ЕLE-R09-D232 Lighting distribution panel L-EE-LDP-01- wiring diagrams 1

38 AP-R10-WD-ЕLE-R09-D233 Lighting distribution panel L-EE-LDP-01- facade 0


39 AP-R10-WD-ЕLE-R09-D241 Motor starter board L-VA-PSB-03- single line diagram 0
40 AP-R10-WD-ЕLE-R09-D242 Motor starter board L-VA-PSB-03 –- wiring diagram 0
41 AP-R10-WD-ЕLE-R09-D243 Motor starter board L-VA-PSB-03 –- fasade 0
HVAC Motor starter board L-VA-PSB-04- single line
42 AP-R10-WD-ЕLE-R09-D251 1
diagram
UPS Electrical distribution panel L-ED-EDP-01 – single line
43 AP-R10-WD-ЕLE-R09-D252 1
diagram
44 AP-R10-WD-ЕLE-R09-D253 UPS Electrical distribution panel L-ED-EDP-01 ––- fasade 0
UPS Electrical distribution panel L-ED-EDP-01 ––- single
45 AP-R10-WD-ЕLE-R09-D261 3
line diagram
46 AP-R10-WD-ЕLE-R09-D262 Distribution board L-ED-EDP-01- wiring diagrams 1
47 AP-R10-WD-ЕLE-R09-D263 Distribution board L-ED-EDP-01- facade 0
Electrical distribution panel L-EE-MPS-01/02– single line
48 AP-R10-WD-ЕLE-R09-D271 2
diagram
Electrical distribution board L-EE-MPS-01/02- wiring
49 AP-R10-WD-ЕLE-R09-D272 1
diagrams
50 AP-R10-WD-ЕLE-R09-D273 Electrical distribution board L-EE-MPS-01/02- facade 0
51 SS-R10-WD-ЕLE-R09-D292 Local control panel L-ECP. LV switchgear control (1) 0
52 AP-R10-WD-ЕLE-R09-D293 Local control panel L-ECP. LV switchgear control (2) 1
53 SS-R10-WD-ЕLE-R09-D295 Local control panel L-ECP. Fault indication 0
54 SS-R10-WD-ЕLE-R09-D298 Local control panel L-ECP. Fault indication 0
55 SS-R10-WD-ЕLE-R09-D299 Local control panel L-ECP- specification 0
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 8 / 18

LIST OF ATTACHMENTS

No. Attachment No. Attachment Title Rev.


1 AP-R10-WD-ЕLE-R09-A1 Attachment 1: Bill of materials 3
2 AP-R10-WD-ЕLE-R09-A2 Attachment 2: Lighting calculations 1
3 AP-R10-WD-ELE-R09-A3 Attachment 3: Power balance 1
4 AP-R10-WD-ELE-R09-A4 Attachment 4: Cable lists 1
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 9 / 18

LIST OF ABBREVIATIONS

ATS Automatic Transfer Switch


ADS Auxiliary Distribution Switchboard
ECP Electrical Control Panel
EDG Emergency Diesel Generator
EDP Electrical Distribution Panel
LDP Lighting Distribution Panel
LV Low Voltage
MV Medium Voltage
MVCS Medium Voltage Switchgear Center
NDF National Disposal Facility
PDS Power Distribution Switchboard
PSB Power starters Board
TS Transformer Station

LIST OF DOCUMENTS

[1] BSS IEC 60038/2002, Standard voltages IEC


[2] BSS HD 60364-4-41/2007, Low voltage electrical installations. Part 4-41: Protection
against electric shock.
[3] Ordinance № 3 on the Design of Electrical Installations and Power Transmission
Lines
[4] BSS EN 60439, Low voltage switchgear and control gear assemblies standards
[5] BSS EN 60529/2004, Degrees of protection provided by enclosures (IP code)
[6] BSS EN 60947, Low voltage switchgear and control gear assemblies standards
[7] Ordinance 4 (2010) for lighting protection of buildings, installations and exterior area
[8] BSS EN-62305 standards. Protection against lighting
[9] Ordinance № Іz (1971) from 2009. for building the technical rules and standards for
ensuring fire safety.
[10] BDS EN 50173 - Information technology - Generic cabling systems - Part 1:
General requirements. Part 2: Office premises.
[11] BDS EN 50174 - Information technology - Cabling installation - Part 1: Specification
and quality assurance. Part 2: Installation planning and practices inside buildings.
Part 3: Installation planning and practices outside buildings.
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 10 / 18

1. GENERAL

1.1. Grounds for Design


The State Enterprise Radioactive Waste is the Employer under project for construction
of the National Disposal Facility for Low- and Intermediate Level Radioactive Waste at
“Radiana” Site, funded by the „Kozloduy“ International Fund.
Under the scope of Project R-5, a Technical Design for the near-surface repository
was elaborated, serving as a basis for the elaboration of the present Working Design.
Under the policies and rules of the European Bank for Reconstruction and
Development, in the year of 2015, an open and competitive Tender Procedure was
conducted. A “German Bulgarian Consortium ”National Disposal Facility”” was selected for
a Contractor of the “Construction of Phase 1 of the National Disposal Facility for Low- and
Intermediate Level Radioactive Waste” (Project R-10), consisting of four local companies
and a Consortium Leader “NUKEM Technologies” GmbH. The leading foreign partner
selected and assigned to the Bulgarian company “Smart Synergy” JSC the elaboration of
the Working Design, which is within the Contractor's scope under Project R-10.
The Working Design further develops and details the technical solutions adopted in
the approved Technical Design. In the process of its elaboration all applicable regulatory
requirements in force are observed. All changes in other external projects, related to the
implementation of the activities for construction of Phase 1 of the National Disposal Facility
for Low- and Intermediate Level Radioactive Waste are considered.
This document is part of the Working Design documentation, prepared according to
the scope and requirements of Project R-10.

1.2. Scope of the design part


The current working project has been prepared based on the approved Technical
Project, the previous revision of the same, as well as information from the Contractor
regarding approved and delivered to the site and technological equipment in the building.
The current revision of the working drawings is issued based on comments and
prescription from the Client.
For the purpose of easier review of and work with the design documentation, the
structure of the Technical Design has been preserved during the Working Design
elaboration.
The present Working Design of Part Electrical for Building R-09 covers technical
building, earthing system layout, lightning protection system, distribution panels and
technology consumers, lighting and socket installation layout, electrical single line diagram.
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 11 / 18

The present document is elaborated on the basis of document EQEB-11207-TD-ELE-


R09 from the Technical Design.

2. POWER TRANSFORMERS L-EA-MT, L-EE-DTR И L-EE-DTR-DG

The specifications of transformers are given in document EQEB-11207-TD-ELE-R01


from Technical Design sections 4.1.2. for power transformers 20/0.4 kV and 4.2.9 for
distribution transformers 0.4/0.4 kV.

3. LV SWITCHGEAR L-EB-LVS

The switchgear comprises two sections - L-EB-LVS-MT and L-EB-LVS-DG connected


by a tie-breaker.
The design basis and main ratings are according to document EQEB-11207-TD-ЕLE-
R01, section 4.2.5 from the Technical Design.
For the purpose of Working Design is developed equipment of the company Schneider
Electric and earth fault detectors by Siemens. Other possible configurations shall provide
similar functions.
In case of selection of other types of circuit breakers the discrimination with upstream
and downstream protections shall be checked.
The configuration includes freely scalable modular system with panels type “OKKEN“
of Schneider, consisting of typically tested according to EN-60439-1 standard panels.

4. LV POWER STARTER BOARDS

The following Motor Control Centers (MCP) are subject of this section:
Powered by "EB" power supply system:
 HVAC Motor starter board L-VA-PSB-01
 HVAC Motor starter board L-VA-PSB-02
Powered by "EE" power supply system:
 HVAC Motor starter board L-VA-PSB-03
 HVAC Motor starter board L-VA-PSB-04
The design basis and main ratings are according to document EQEB-11207-TD-ЕLE-
R01, section 4.2.7 from the Technical Design.
For the purpose of Working Design is developed configuration based on PrismaSet P
series by Schneider Electric with fixed motor protection thermo-magnetic circuit breakers
directly attached to contactors. Other possible configurations shall provide similar functions.
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 12 / 18

In case of selection of other types of circuit breakers the discrimination with upstream
and downstream protections shall be checked.
This configuration has been preferred to more sophisticated modular systems for the
following reasons:
 All motors are comparatively small and are started in direct mode. This
refers also to the motors operated by frequency converters, as the solutions
developed in design part HVAC anticipate the solutions with frequency
converters built in the units.
 The total power of the motor starter boards is small and correspondingly
comparatively simple molded case circuit breakers are sufficient as
incomers.
 As the system is designed for operation exclusively in automatic mode, no
other control means are anticipated for these panels except status indication
lamps. The motor control for the common systems – hot water and chilled
water systems shall be done from the panel L-VA-PLC-01. Means for
manual operation for testing purposes shall be provided in the latter panel.
The buildings’ air handling system shall be controlled by the local HVAC
control panels x-VA-PLC01. Start/stop push buttons for starting and
stopping of each Air Handling system, including motors, fed from L-VA-PSB-
01/2 are provided at each building’s local HVAC control panel x-VA-PLC01.

5. FIRE FIGHTING PUMPS. POWER STARTER BOARD L-DA-PSB-01

This report provides as well functional diagrams for control of the following HVAC
systems:
 Hot water system
 Chilled water system
 Fan coils for building L
The following Power Starter Boards, anticipated for NDF shall be complete delivery
with the equipment, therefore no separate design is necessary:
 Fire protection motor starter board L-DA-PSB-01
 Motor starter board L-AA-PSB-02
This report provides functional diagrams for control of the fire fighting pumps.
According to three separate feeders are provided to L-DA-PSB-01 panel – for each of
working and back-up pumps and for the jokey pump.

6. LV DISTRIBUTION PANELS L-EE-ADS AND L-EE-ADS-DG

The design basis and main ratings are according to document EQEB-11207-TD-ЕLE-
R01, section 4.3.3 from the Technical Design.
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 13 / 18

For the purpose of Working Design is developed configuration based on PrismaSet P


series by Schneider Electric with plug-in molded case circuit breakers. Other possible
configurations shall provide similar functions.
In case of selection of other types of circuit breakers the discrimination with upstream
and downstream protections shall be checked.
Provided L-EE-ADS and L-EE-ADS-DG panels supply consumers through external
underground cable lines, measures against damages due to indirect lightning strokes are
provided, namely installation of surge protecting devices in these panels and using of
shielded cables with shield grounded at both sides for all external feeders.

7. ELECTRICAL DISTRIBUTION PANEL L-EE-EDP-01

For the purpose of Working Design is developed configuration based on PrismaSet G


series by Schneider Electric with fixed miniature circuit breakers with residual current
detection for the end consumer feeders. Other possible configurations shall provide similar
functions.
In case of selection of other types of circuit breakers the discrimination with upstream
and downstream protections shall be checked.

8. LIGHTING DISTRIBUTION PANEL L-EE-LDP-01

For the purpose of Working Design is developed configuration based on Prisma G


series by Schneider Electric with fixed miniature circuit breakers with residual current
detection and modular contactors. Other possible configurations shall provide similar
functions.
In case of selection of other types of circuit breakers the discrimination with upstream
and downstream protections shall be checked.
Switching on and off of rooms’ lighting is manual from switch in the corresponding
room.

9. UPS ELECTRICAL DISTRIBUTION PANEL L-ED-EDP-01

For the purpose of Working Design is developed configuration based on Prisma G


series by Schneider Electric with fixed miniature circuit breakers with residual current
detection and modular contactors. Other possible configurations shall provide similar
functions.
In case of selection of other types of circuit breakers the discrimination with upstream
and downstream protections shall be checked.

10. ELECTRICAL CONTROL PANEL L- GG-ECP

The design basis and main ratings are according to document EQEB-11207-TD-ЕLE-
R01, section 5.3 from the Technical Design

11. CABLE RACEWAYS


CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 14 / 18

11.1. General
The design basis and main ratings are according to document EQEB-11207-TD-ЕLE-
R01, section 7 from the Technical Design
11.2. Main cable raceways
The main cable routes consist of concrete cable ducts and wire mesh cable trays with
a bar of electro-welded steel installed on galvanized steel supports.
Vertical cable trays shall lead from main cable trays to each electrical or control panel.
The vertical trays shall be equipped with protective metallic covers.
At each wall crossing the cable trays shall be interrupted. The cables shall cross the
walls through penetrations with fire resistance not less than EI120.
The cable ladders for building L are shown on drawing AP-R10-WD-ELE-R09-D031.
The power cables connecting the power transformers and the diesel generator to the
MV and LV main switchgear will be laid in a cable duct under the floor of the room, closed
with concrete covers, shown in drawing AP-R10-WD-ELE-R09-D021. To pull the cable from
the diesel generator to the concrete cable duct in the room, a special cable tray with a cover
for floor installation, secured with suitable supports, is provided.
11.3. Cable leads to individual consumers and power socket panels.
Shall be laid in rigid metal protective conduits will be made of electro-welded steel with
a zinc cover whose thickness will be not less than 0,02 mm, with threaded ends in
accordance with EN standards.
The conduits shall be installed on the wall surface.
Each cable shall be installed in separate conduit.
11.4. Cabling of lighting and current socket installations and HVAC peripheral
components
 In rooms with gypsum board walls and suspended ceilings:
The cables shall be laid in flexible (corrugated) conduits inside the walls, respectively
above the ceiling where the conduits shall be attached to the ceiling suspension elements.
The flexible corrugated conduits will be of LHC type, halogen free, without toxic gases,
corrosive gases and opaque smokes, for operating temperatures of up to 105 oC and in
accordance with the standards: EN 13501, EN 50086 and EN60423.
The auxiliary and junction boxes for this type of flexible conduits will be made of
material with similar characteristics to the ones defined for the conduits.
Each cable shall be installed in individual conduit.
 In technical rooms with concrete walls:
The cables for individual consumers and commutation devices shall be installed in
rigid metal conduits
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 15 / 18

The cables for lighting fixtures installed in lines (the premises L-1-01 ÷ L-1-05) shall
be laid in perforated galvanized steel cable trays which serve in the same time as supports
for the fixtures.

12. LIGHTING SYSTEM AND SOCKETS NETWORK

The design basis and main ratings are according to document EQEB-11207-TD-ЕLE-
R01, section 9 from the Technical Design.
In the present revision, new calculations of the lighting in the technical building are
presented. They were made by the Contractor company due to the accepted replacement
of fluorescent lighting fixtures with LED lighting fixtures. The lighting installation shown in
drawing AP-R10-WD-ELE-R09-D071 has been adjusted according to the new lighting
fixtures.

13. EARTHING AND LIGHTNING PROTECTION SYSTEMS

This part of the project is according to the previous revision of the project.
13.1. Earthing system
Earthing system consists of the following components:
 Foundation electrode.
Constitutes of a ring installed on the periphery of foundation with cross-
connections at each 20 m approximately. Solid copper conductor 50 mm 2 (
8) shall be used. The foundation electrode shall be attached to the
reinforcement thus providing grounding of the whole building structure.
 Potential equalizing ring.
Buried in the soil at 1 m depth and 1 meter away from the building. Stranded
copper conductor 50 mm2 shall be used.
 Connections to other earthing electrodes – as shown on the drawings.
Stranded copper conductor 50 mm2 buried in soil shall be used.
 Tap-offs for down-conductors and connections from foundation electrode to
potential equalizing ring.
Both the tap-offs to lightning protection down conductors and connections to
the potential equalizing ring shall be made connected to the foundation
electrode in one and the same points at each 10 m along the building
periphery. Solid copper conductor 50 mm 2 ( 8) shall be used.
The tap-offs to the lighting protection down-conductors shall end with test-
boxes installed on external walls surface. The function of the test boxes is to
provide dismountable bolt connection to the down-conductor. Specially
certified products shall be used.
All connections between elements shall be made with materials specially certified for
use in earthing systems.
13.2. Equipotential bonding system
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 16 / 18

The equipotential grounding system serves to:


 Protect people against touching of conductive parts which may accidentally
get different potentials.
 Provide grounding for surge protecting devices.
Equipotential grounding busses are provided in all technical rooms. For offices,
service rooms, laboratories and similar only grounding of electrical equipment metallic
frames through the PE conductor is sufficient.
The equipotential bonding bus in building L will constitute of a stranded copper
conductor 50 mm2 installed on the upper cable tray as shown at drawing SS-R10-WD-ELE-
R09-D002.
Connection of the equipotential bonding bus to the foundation electrode is provided at
two points.
The following equipment shall be connected to the equipotential bonding bus:
 All kind of metallic structures.
 Metal frames of electrical and non-electrical machines and units.
 Grounding terminal, respectively PE bus of each electrical distribution
board. Some electronic cabinets might have special mode of earthing
according to supplier’s specification.
 All incoming metallic pipes. Grounding connection shall be made as closer
as possible to the entry point.
 All cable shields of incoming cables. Grounding connection shall be made in
the electrical panels.
The crane rail at each side of the building shall be grounded at two points. For this
purpose direct tap-offs from the foundation electrode are provided.
13.3. Lightning protection system
A mesh of 5 x 5 m will be installed in the roof of the building, in accordance with IEC
62305-3 for Class I of LPS.
The mesh will be made of AlMgSi0.5 solid round conductor 50 mm 2 ( 8), according
to IEC 62305-3. The conductors shall be installed on prefabricated supports.
Down-conductors will have the same characteristics as those defined above for the
lightning protection mesh and shall be installed on clamps on walls surfaces,
The distance between down-conductors will be 10 m, according to IEC 62305-3. The
down conductors shall be connected to the earthing system through above described test
boxes.

14. MEMO ON SAFE WORK CONDITIONS, FIRE AND EMERGENCY SAFETY

14.1. Evaluation of possible hazards for staff


CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 17 / 18

The following hazards are likely to occur during the implementation and operation
stages of the project:
 • During operations it is possible to get an electric shock if contact is
made with exposed current wires or burns due to breakthroughs of
insulation or short circuits.
 • Affecting of adjacent power cords during work.
 • Contact with parts, which are normally not on voltage.
 • Ignition of exposed cable fragments due to overload or breakthroughs.
14.2. Measures for protection of the personnel against possible hazards
The following measures are envisioned in order to ensure safety and work hygiene, as
well as fire safety during operations on the site:
 The building has a monolithic construction.
 The dimension of the premises allows for correct placement and installation
of all facilities and installations.
 The switchgear units use IP-31 and IP-44 degree of protection. The
connection between incoming and outgoing current wires in the switchgear
is made via cable shoes, and in the smaller sections – via cable loops and
screw links.
 All electrical equipment is technically secured, whereby the non-conducting
metal parts are connected to the zero bus of the switchgear or to the ground
loop.
 The grounding installation is executed via the third and fifth conductor of the
power cord.
14.3. Possible harms and hazards
The following hazards may occur during the installations foreseen in this project:
 Uncoordinated actions by the work force.
 Lack of any of the following: tools necessary for safe operations, safety
equipment for work at high altitudes, suitable work clothing and personal
protective equipment, etc.
14.4. Planned actions
The following actions have been envisioned in order to avoid above mentioned harms
and hazards:
 The work area must be fire-protected.
 Daily safety instructions will be given by the technical supervisor.
 The execution of all sorts of tasks will be carried out in groups of at least two
installers.
CONSTRUCTION OF PHASE 1 OF NATIONAL DISPOSAL FACILITY

Document Explanatory Note ID AP-R10-WD-ELE-R09 Rev. 4

Part Electrical Page 18 / 18

 All switchgear units have safety shutters, doors, key, appropriate protection
against dust and water, and are made of metal or ABS non-combustion
materials.
 The use of appropriate tools, work clothing, etc.
 The responsible personnel will be trained how to fight fires.
14.5. Healthy and safe working conditions
The provision of healthy and safe working conditions is carried out in accordance with
the specific activities and the requirements of the technical, technological and social
development in order to protect the life, health and working capacity of the employees. The
work equipment shall be maintained and repaired promptly throughout its use and after its
decommissioning so as not to endanger the health and safety of the personnel.