Guyed Tower Foundations
Guyed Tower Foundations
B GUYED TOWERS
FOUNDATIONS AND ANCHORS
1.02 This section is reissued to delete concrete 1.07 Foundations for the towers are designed
design information which is now provided to include anchor bolts furnished as part
in Section AG25.130. Since this reissue covers a of the B Guyed Tower Anchor. Steel wire mesh,
general revision, arrows ordinarily used to indi- usually supplied by the contractor, is required
cate changes have been omitted. in the foundation but not in the anchors.
1.03 Local or state laws may require the ap-
proval of foundation and anchor designs
CONCRETE PIER
by a professional engineer duly registered and
licensed to practice in that state. To facilitate
checking the designs, the loads imposed by the
towers are tabulated in Part 5.
foundation construction. I \
I \
I \
1.05 The foundation and anchor designs shown
f--- REINFORCING RODS \
in this section assume soil adequate to I GROUTED IN ROCK FOR \
ANCHOR (NUMBER, SIZ~
withstand a pressure of 4000 pounds per square I AND DEPTH VARIABLE) \
foot. In locations where the soil is not capable I \
of satisfactorily bearing this load, soil stabiliza- I \
tion or foundations and anchors specifically de- I '
signed to meet local conditions will be required.
If there is any doubt concerning the adequacy Fig. 1 -Typical Foundation in Rock
1.08 To avoid damage from lightning, the 2.03 Excavations which must remain open over-
foundation and the anchors should be night should be adequately barricaded or
protected (as outlined in Part 4) with the B covered to prevent children or animals from
Guyed Tower Ground. falling into them. Excavations should also be
protected from flowing surface water in the
1.09 General .information regarding concrete event of rain. Extraneous materials (paper, rub-
characteristic s, forming, testing, reinforc- bish, etc.), should be removed before concrete
ing and related subjects is provided in Section is poured. The volume of excavation required for
AG25.130. a foundation is shown in Table B.
Page 2
ISS 2, SECTION 760-925-210
-.
' '
.. )
1,1 5/tsin. A~ 1 · • , · •
•- ? · -·-.-_- \ ·- _ ' 4tn; t tf1s.
• •·_...____ -_.·_ :- :._~_._.'<!_.·._.
@.o N_.. V:. ._· -··.
':c-"
-·-~- _- ._-_ :-.~_-.
•
·_: _.._ "--.'~_· _ _·. • . ~--.. -_.....-----_
... -1__::;_.
• -•. •.. ·- .. @-.-~
..••
Page 3
r
SECTION 760-925-210
I
!
1 in. Diam
8 in.
j_ ~--"=-~-=-====-8_in_.=====~~---r
1 in.
~------------------~~~
1 ~---------12in. ----------~
internal arcing in the finished pier in the event 3.02 Anchors for the B Guyed Tower consist
of a lightning stroke. Care should be exercised of rectangular blocks of concrete equipped
to ensure that the bolts are not pulled out of with the necessary anchor rods. Five varieties of
alignment in doing this. The bolts should be anchors are used with B Guyed Towers. These
pi umb to within 1!16-inch of true vertical. have been designated as Types I, II, III, IV, and
V, and are illustrated in Figs. 5, 6, 7, 8, and 9.
The Type I anchor is used only with the 80-
3. ANCHORS foot tower. The Type II anchor is used only
with 100- to 160-foot towers inclusive. Type III
anchor is used only with 180- and 200-foot towers.
3.01 The B Guyed Tower is guyed in three
Types IV and V are both required for towers
directions with guy anchors spaced 120 de-
220 feet high and larger.
grees apart. Each guy is attached to a separate
guy rod, although two or three rods may be em- 3.03 Table C lists the number and types of
bedded in the same concrete anchor. Block an- concrete anchors required for the various
chors should be located so as to provide a lead-to- sizes of towers. Local conditions may indicate
height ratio of 1 ( 45 degree angle) for the top set the need for other sizes or types of anchors, in
of six guys. For 100- to 200-foot towers, a second which case special engineering will be required.
set of three guys is also attached to the same
TABLE C
anchors. Towers of 220-foot height or greater
NUMBER AND TYPE OF ANCHORS
require three levels of guying and two rings of
anchors; both top and middle guys are installed TOWER HEIGHT TYPE OF ANCHOR
Page 4
ISS 2, SECTION 760-925-210
Typei,rr,m,
or N Anchor
Type Il
Anchor
A A
//~•A
~
/
/
/
\
Foundation
~
~
~
A = 120°±0°- 30'
Page 5
SECTION 760-925-210
5ft.- Oin.
Guy Rod
\
. . '
5ft-3 in.
Min.
PLAN VIEW
Fig. 5 - Anchor Used with 80 foot Tower
Page 6
ISS 2, SECTION 760-925-210
. i
-1 i I
a· . \ 1 •· __l
PLAN VIEW
TABLE
Tower Height (Feet) 100 120 140 160
Anglellall (Degrees)±r 26 30 26 23
~
Page 7
SECTION 760-925-210
.../
11ft -0 in. Guy Rod 5ft-Oin. Guy Rod _J 1-9in. ;----
I I
~6ft.-10in. Min. Sq.~
ELEVATION
Volume of Concrete 6.9 Cu. Yds.
Excavation-Approx. 12.1 Cu. Yds.
1
'
6ft-10in.
Min.
.• •. t
PLAN VIEW
TABLE
Tower Height (Feet) 180 200
Angle "a" (Degrees) 1r 26 24
Page 8
ISS 2, SECTION 760-925-210
This face of
Anchor Block -------- .
to bear against
undisturbed earth.
I
.. . I
.
.
.;,·.·
"~~> .
.
·.· :,j
6ft-Oin.
To~ Tower - - Min.
·.·.-···• .-.fft Om. .• ·. -.· •
=====:=::;::::::···-~~>c:;·.•Pi~~J.:~7ftr~~J~j~~~~ -~ ~ ..
····-.-~---_- ..•••.••••• < .r·· -.•_.._.-.•.-._.· _· .
PLAN VIEW
Fig. 8 - Outer Anchor Used with 220-300 foot Towers
Page 9
SECTION 760-925-210
TABLE
Tower Height (feet) 220 240 260 280 300
11 11
Horizontal Distance A from 1 31 1 51 171 1 91 191
center of Tower (feet)
Angle .. a''(Degrees) ±r 27 24 27 25 25
Pagel O
ISS 2, SECTION 760-925-210
3.04 The distance "A" (see Figs. 5 through 9) port the anchor rods in place during the pouring
from the back face of the anchors is shown operation. These supplemental rods will not af-
for the particular case of flat ground. If the fect the strength capabilities of the anchors. No
tentative location of an anchor at distance "A" form work is required as a general rule, a! though
as shown is at a lower elevation than the loca- it may be necessary to shore the sides of exca-
tion chosen for the foundation, horizontal dis- vation to prevent cave-in. The approximate vol-
tance "A" should be increased by the amount of ume of excavation required for anchors is
difference in elevation so as to maintain a 45° indicated in Table E.
angle for the upper guys. Conversely, if the
tentative location of an anchor is higher in TABLE E
elevation than the spot chosen for the founda-
tion, distance "A" should be reduced by the TOWER HEIGHT TOTAL VOLUME OF EXCAVATION*
(cubic yards)
(feet)
difference in elevation. If the ground slope ex-
ceeds 3 per cent, the wind load which will cause 80 21.6
the tower to exceed the twist and deflection 100-160 28.2
limits of 1/2 degree and 1/4 degree (with the 180-200 36.3
equipment specified in AG25.200) may be less 220-300 51.9
than 20 lbsjftz (i.e., a lower wind velocity).
*Note: Quantities are based upon vertical walls
3.05 One B Guyed Tower Anchor is required for all excavations. If dug by machine, the
for each B Guyed Tower. In addition to actual quantity of earth removed will generally
four anchor bolts, this unit includes the quan- be in excess of the quantities shown. No slope
tities of guy rods and anchor rods indicated in should be permitted on that part of the wall
Table D. Since the quantity of different size and which abuts the front face of the anchor.
type rods varies with the height of the tower, it
is necessary to order the B Guyed Tower Anchor
according to tower height. 3.07 Guy rods should not be attached to anchor
rods until the concrete has set. A sloping
TABLED trench should be dug to accommodate the guy
rods when they are placed. The trench should
TOWER HEIGHT
GUY RODS
ANCHOR RODS
be deep and long enough so that the guy rod is
(feet) 11 FEET 5 FEET free to pull into line with its tensioned guy
without bending. These trenches should be left
80 0 6 6
open until the guys are installed to make sure
100-200 3 6 9
that each guy rod forms a straight line between
220-300 3 9 12
its attachment point on the tower and the
Note that the total number of guy rods is always anchor rod.
the same as the number of anchor rods. As may
be seen in Figs. 5 through 9, the 5-foot guy rods 4. GROUNDING
are always used with guys installed at a 45°
angle (that is, all top guys, and on towers with 4.01 All towers should be grounded to prevent
three levels of guying, also the middle guys). possible damage to their foundations or
All guy rods, regardless of length, engage the anchors. Grounding facilities should be installed
eye of an anchor rod with a l-inch bolt passing at the same time the foundations and anchors
through the clevis of the guy rod. are installed. The B Guyed Tower Ground con-
tains materials which are furnished to electri-
3.06 Anchor rods should be installed at the cally ground these towers and their guys. This
angles shown (±1 degree) in Figs. 5 ground is not furnished with the tower, but
through 9. Although no reinforcing is required must be ordered separately. Since the quantity
in these anchors, it may be found expedient to of material varies with the number of anchors
drive a few short lengths of reinforcing rods into and guys, and these in turn are a function of the
the sides and bottom of the excavations to sup- tower height, it is necessary to specify the height
Page 11
SECTION 760-925-210
of the tower as a part of the ordering informa- 4.05 As shown in Fig. 11, each anchor is pro-
tion. Normally, a lightning rod is required only tected with two ground rods connected to
when lighting facilities are installed on the the guy rods by a length of No. 2 A WG bare
tower. copper wire. Ground rods should be installed
after the concrete has been poured and set, but
4.02 Sufficient wire is provided to ground the before the excavations are backfilled. The ground
tower, but not to connect the tower ground- rods are 5 feet long and when installed to a
ing system to the station grounding system. This depth of 8 feet, their tops will be about 3 feet
connection should normally be made, but since below grade. While the excavations are open, it
the distance between the tower ground and the will be relatively easy to gouge a channel in the
station grounding system will vary for each in- two sides of the excavation which are to receive
stallation, the length of wire required for this the ground rods. The channel need be no more
connection should be included in the wire or- than 6 to 10 inches deep and about 6 inches
dered for the station grounding system. In some wide to permit room to drive the rod. Since the
cases, the distance involved, and electrical con- tail of the ground rod is about 12 inches long,
siderations may indicate that interconnection of the connection to the No. 2 copper wire can be
the two systems :is not necessary. made outside the channel. The tail of the ground
rod should be connected to a length of wire
which is long enough to reach the ground rod
4.03 The general principle of protecting a on the opposite side of the anchor, and also
buried concrete structure against light- permit connection to all guy rods associated
ning which may enter through steel extending with the anchor. Connectors are provided to
above ground, is to equalize the potential inside join the ends of the wire to the tail of each
and outside the concrete mass, in order to pre- ground rod and a clamp is provided to secure
vent arcing. In the specific case of anchors and the wire to each guy rod. The clamps should be
foundations for the B Guyed Tower, (as shown positioned so that they will be at least 6 inches
in Fig. 10 and 11) grounding is accomplished by below grade. Excavations may be backfilled after
placing two ground rods alongside each mass of all connections are tightened, but care should
concrete, and connecting them to the anchor rods be exercised to ensure that connections are not
and tower base, respectively. To obtain maximum broken or damaged in this process.
protection, the two ground rods are placed on
opposite sides of the concrete block. 5. FOUNDA nON LOADS AND GUY TENSIONS
5.01 When the tower is loaded with a full com-
4.04 In protecting the foundation, as shown in plement of reflectors and/or antennas,
Fig. 10, the ground rods are placed within and subjected to wind load of 40 pounds per
12 inches or less of the midpoint of opposite square foot, the foundation will be subjected to
sides and driven to a depth of about 51!2 feet. certain loading. The approximate loads trans-
Connectors are used to join the tail of each mitted to the foundation under these conditions
ground rod to a length of No. 2 A WG bare are indicated in Table G. ,
copper wire. About 7 feet of wire should be left
above ground to make the connection to the TABLE G
tower. Each copper wire is secured to the tower FOUNDATION LOADS
under a grooved washer which is held by a
TOWER FOUNDATION TOWER FOUNDATION
%-inch machine bolt supplied as part of the HEIGHT LOAD HEIGHT LOAD
grounding kit. Two 9/16-inch diameter holes are (fHt) (pounds) (feet) (pounds)
Page 12
ISS 2, SECTION 760-925-210
: ...
•
.
Base of Tower
Approx. . ·.·
5ft.6in. .. .
Page 13
SECTION 760-925-210
5.02 In addition to the above forces, there is is designed with a safety factor. Foundations
a horizontal force (shear) of approxi- have, therefore, been designed to withstand loads
mately 2400 pounds acting at the base of the one and one-half times greater than those shown.
t0wer. This force has also been taken into ac- Only three sizes of foundations are used, and
count in designing the foundation. The tower each size is used for a number of different tower
is capable of transmitting greater loads than heights. It follows, of course, that foundations
those tabulated in Table G since the structure which are adequate for a 300-foot tower are
Connectors
12 AWG
Bare
Copper
Wire
Page14
ISS 2, SECTION 760-925-210
somewhat more than adequate for a 220-foot 5.04 The maximum guy tensions are based
tower. upon a design wind pressure of 40 pounds
per square foot with the tower fully equipped.
5.03 Maximum guy tensions under design load- Anchor designs are based upon a safety factor
ing are indicated in Table H. of 2 for the vertical component of the guy ten-
sions, assuming concrete weighs 140 pounds per
cubic foot and.earth weighs 100 pounds per cubic
TABLE H
foot, and that the shape of engaged earth will
MAXIMUM GUY TENSIONS be an inverted frustum of a pyramid with the
sides inclined 30° from vertical. No specific
TOWER UPPER MIDDLE LOWER
HEIGHT GUYS GUYS GUYS safety factor is employed for the horizontal
(pounds) (pounds) (pounds)
(feet) component since the vertical component design
requiremen ts are always controlling for the soil
80 10,000 - - conditions assumed and the anchor configura-
100 to 160 10,000 - 7,600
tions used. Section AG25.300 provides methods
180 to 200 12,000 - 11,000
for determinin g horizontal and vertical com-
220 to 300 12,700 11,000 12,700
ponents of guy tensions.
Page 15
15 Pages