GAMBAR RENCANA

PENANGANAN LONGSORAN
RUAS JALAN SYARIFUDDIN YOES
STA 2+490

TAHUN 2021

CORE TEAM KONSULTAN APBN TA. 2021


PT. ADIYA WIDYAJASA KSO.
Alamat : Komplek Perumahan Pesona Mediterania, Jl. Magnolia Raya Blok S3 No. 07, Balikpapan Baru, Kalimantan Timur,
email : coreteamkaltimct01@gmail.com
UMUM
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO PETA LOKASI PEKERJAAN Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

PETA LOKASI PROYEK

REPUBLIK INDONESIA
Bts. Negara
Bantul
Serudong
U
Tou Lumbis Simanggaris S. Nyamuk PROV. KAL.TIM.
Bakalan Alang NUNUKAN
Sp3. Apas
Siapak P. SEBATIK
Lembubut
Longmidang
Uluulu Tj. Aru
Sasipu Setabu
Beruwen Bisai
Sungailesan
Silau
Papadi
Longberang
Atap
Longbawan
Mesalong

Manuk Tanahmerah
Bulungan/
Malinau
Benuang Sesayap P.BUNYU
Km.70
Punan
Patara P.TARAKAN
Langap Sekatak Buji
Tarakan

Kabuang

P
Sp.3 Tj.Palas
Longkemuat
TANJUNGSELOR
Longpeso

SERAWAK - MALAYSIA Longbujungan


Besar

Sawah
Napaku 024 P.PANJANG
Longagung 037

TANJUNGREDEP P.MARATUA
036
Datadian Labanan
023
Longnawang
Kelay
Longuro Km.50 022
Guntur
021

Longtop Km.100
Metulang
Lembusan

Kebumesai Talisayan

Longboh
Pengadan
Lasan
Ma.Wahau Ma.Lembak
017
019
DPC. 016 Sangkulirang
Maloi
KALIMANTAN BARAT Longpakangai 020 Sp.Perdau018
Batuampar
Longapari
015
Tiongohang
A Sangata

014
Ma. Bengkal

Tering Bontang LOKASI PENANGANAN LONGSORAN


Longiram 034 RUAS JL. SYARIFUDDIN YOES STA 2+490
SENDAWAR 013
L.Bigung
Mentiwan
Br. Tongkok Sebulu Santan
Sp. B. Tongkok Melak
Kotabangun 028 027 012 Sp.M.Badak
033 Sk.Darat Sp. Sambera
Sp.Damai 030 B Sp.Ambalut
011 Ma.Badak

Damai
032 Sp.Blusuh
Gusig
029
Sp.3.Senoi
B
KALIMANTAN TENGAH TENGGARONG SAMARINDA
Bts.Kalteng 031 Anggana
026
Tukuq Loajanan
010 Sangasanga

Bts.Prov.Kalteng
Ke. Ma.Teweh
009 Dondang
Semoisepaku Sp. Ma.Jawa

Sp.Samboja
008
Sp. Semboja
Kenangan
A LEGENDA :
005 BALIKPAPAN
JL. STRATEGIS NASIONAL RENCANA (TERSAMBUNG) IBUKOTA PROVINSI
004 JL. STRATEGIS NASIONAL RENC. (Blm.TERSAMBUNG)
KOTA
Kademan Penajam JALAN NASIONAL
U Petung JALAN PROVINSI IBUKOTA KABUPATEN
003 IBUKOTA KECAMATAN
Kuaro PKN (PUSAT KEGIATAN NASIOANAL)
DAERAH TUJUAN WISATA NASIONAL / INTERNASINAL :
Lolo TANAHGROGOT PKW (PUSAT KEGIATAN WILAYAH) 5 TH. PERTAMA
Skala :
025
002
PKW (PUSAT KEGIATAN WILAYAH) 5 TH. KEDUA
A WISATA ALAM /SUNGAI/DANAU/GUNUNG / T. NASIONAL

Batuaji
Ma.Biu
Periuk
PKSN (PUSAT KEGIATAN STRATEGIS NASIONAL)
B WISATA BUDAYA

0 10 20 30 40 50 60 Km 001 5 TH. PERTAMA. P WISATA PANTAI


KALIMANTAN SELATAN JU
N
G A Kerang
Tj.Aru
PKSN (PUSAT KEGIATAN STRATEGIS NASIONAL)
5 TH. KEDUA. M WISATA MUSEUM / PENDIDIKAN
N
TA
Ke 021 NO RUAS
Ke
BATULICIN BATAS PROVINSI
BATAS KABUPATEN
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO LEGENDA Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

x x

565.1

U
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO DAFTAR SINGKATAN Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

DAFTAR SINGKATAN

L ATAU l PANJANG
S SKALA
LC PANJANG LENGKUNG
A PARAMETER DARI LENGKUNG CLOTHOID E TIMUR
SD SUB DRAIN
& DAN LIN M METER PANJANG
EC UJUNG LENGKUNGAN SC LENGKUNG SPIRAL KE LENGKUNGAN
LS PANJANG LENGKUNG SPIRAL
(AC) PENYEJUK UDARA ELEV ELEVASI
LV PANJANG LENGKUNG VERTIKAL SII STANDAR INDUSTRI INDONESIA
EP TITIK AKHIR
AC ASPHALT CONCRETE
SP SALURAN PELUNCUR
EQ SEIMBANG
ASTM THE AMERICAN SOCIETY FOR TESTING SQ PERSEGI
EV BEDA TINGGI ANTARA PVI DAN
AND MATERIALS SQM METER PERSEGI
LENGKUNG VERTIKAL
M ATAU m METER
EXC PENGGALIAN SS LENGKUNG SPIRAL KE LENGKUNG SPIRAL
M2 ATAUm 2 METER PERSEGI
EXP PERLUASAN (SS) SIMPANG SUSUN
M3 ATAUm 3 METER KUBIK
EVCS STATION AKHIR LENGKUNG VERTIKAL ST PANJANG LENGKUNG SPIRAL
MAX MAKSIMUM
EVCE ELEVASI AKHIR LENGKUNG VERTIKAL (ST) SEPTICTANK
BC BOX CULVERT (DRAINASE) MB BOR MESIN
STA STASIUN
BJ BANGUNAN TERJUN MCCB MOULDED CASE CIRCUIT BREAKER
So KEMIRINGAN SALURAN
BJTD BAJA TULANGAN DEFORMED MCB MINIATURE CIRCUIT BREAKER
BJTP BAJA TULANGAN POLOS MIN MINIMUM
BP TITIK AWAL MM ATAU min MILLIMETER
FG ELEVASI RENCANA
BH BORE HOLE MM2 ATAUmm 2 MILLIMETER PERSEGI
fc' KUAT TEKAN BETON UMUR 28 HARI t TEBAL
BVCS STATION AWAL LENGKUNG VERTIKAL DENGAN UJI SILINDER. MOV PERLETAKAN YANG BERGERAK (MOVE)
T TON
BVCE ELEVASI AWAL LENGKUNG VERTIKAL fy TEGANGAN LELEH BAJA MPA MEGA PASCAL (NEWTON/mm2)
TC LURUS KE LENGKUNGAN
TL PANJANG TALI BUSUR
TS LURUS KE LENGKUNG SPIRAL

N UTARA TTA TINGGI TANAH ASLI

N/NO NOMOR TB TURAP BETON / SHEET PILE


CL ATAU C GARIS SUMBU GR GUARDRAIL
CM2 SENTIMETER PERSEGI GV KLEP PINTU NYFGbY JENIS KABEL
CM3 SENTIMETER KUBIK
CP KONTROL PANEL
U WEIGHT SATUAN BERAT
CS LENGKUNG KE LENGKUNG SPIRAL OP JEMBATAN PERLINTASAN ATAS
UP JEMBATAN / BOX PERLINTASAN BAWAH
CT LENGKUNGAN KE GARIS LURUS
H ATAU h TINGGI
CTC PUSAT KE PUSAT
HB KOTAK HYDRANT
HP HYDRANT PILAR PC PIPE CULVERT
(PC) PRESTRESS CONCRETE V KECEPATAN
PI TITIK POTONG DARI ALINYEMEN HORISOTAL VA VOLT AMPERE
PL PLAT
DC BANGUNAN PELENGKAP
PVC PIPA PARALON
DEL DELINEATOR
JIS JAPANESE INDUSTRIAL STANDARDS PVI TITIK PERPOTONGAN DARI
DI PINTU SALURAN MASUK (INLET)
JOK JEMBATAN OVERPASS JALAN KABUPATEN ALINYEMEN VERTIKAL (W) ATAU w LEBAR
D ATAU Ø DIAMETER TULANGAN
JOD JEMBATAN OVERPASS JALAN DESA (%) PERSEN W WATT
DJ JOINT BOX
JR JEMBATAN JALAN REL WC LAPIS PERMUKAAN (AUS)
DKR SKEDUL PANEL q1,q2 SUPERELEVASI
WS TANDA PERINGATAN
DL DATUM LEVEL
DO PINTU SALURAN KELUAR (OUTLET)
DS DRAINASE SAMPING
(R) RUANG
DSW DINDING PASANGAN BATU K KUAT TEKAN BETON UMUR 28 HARI R JARI-JARI LENGKUNG X KOORDINAT TITIK X DALAM METER
DV DRAINASE VERTIKAL UJI KUBUS RB BALOK BULAT
DW BETON MORTAR UNTUK SALURAN Kr KRAN RC BETON BERTULANG
YANG DIPERKERAS KG kg KILOGRAM RCP REINFORCED CONCRETE PIPE
,' , '' DERAJAT, MENIT, DETIK Y KOORDINAT TITIK Y DALAM METER
KM KILOMETER RS LAMPU DARURAT ( BERPUTAR )
KM/H KILOMETER PER JAM RW DINDING PENAHAN TANAH
ATAU KPH
ROW RUANG MILIK JALAN (RUMIJA)
Z ELEVASI DALAM METER
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO PENJELASAN UMUM UNTUK JALAN Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

PENJELASAN UMUM UNTUK JALAN


GAMBAR SITUASI DAN POTONGAN MEMANJANG
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO LAYOUT Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

Pilecap, Beton Struktur, Fc '20 Mpa

Saluran Berbentuk U Tipe DS-2


Beton F'c 10 Mpa

Saluran Eksisting

Laston Lapis Aus Ac-Wc


Beton Struktur Fc '20 Mpa

Rel Pengaman ( Guard Rail )

Panjang Penanganan
90 m
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO PLAN & PROFILE Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo
STRATIGRAFI TANAH
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO STRATIGRAFI TANAH Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

BH 1
0

1 1

4 2 4 2

4 3 6 3
BH 03
A = Lempung Lunak 0
4 4 8 4

B = Lempung Medium - Kaku 1 7 5 9 5


C = Lempung Kaku - Sangat Kaku 3 2 11 6 11 6
D = Lempung Keras 4 3 11 7
10 7

6 4 9 8 11 8
BH 04
0 6 5 11 9
11 9

2 1 A 10
6 6

7
13 10 12

13
10

11
5 2 15 11

8 3 15 8 18 12 15 12

10
9 4

5
B 15

16
9

10
20

22
13

14
17

20
13

14

13 6 17 11 21 15 22 15

17 7 18 12 21 16 25 16

18 8 21 13 26 17 30 17

C
20 9 24 14 31 18 36 18

22 10 27 15 33 19 42 19

24 11 31 16 36 20 49 20

26 12 40 17 44 21 54 21

28 13 50 18 52 22 60 22

34 14 55 19 60 23 60 23

40 15 60 20 60 24 60 24

60 21 60
41 16 25

60 22
42 17

43 18

45 19

47 20

50 21

50

50
22

23
D
50 24

50 25

55 26

60 27

60 28

60 29

60 30
TIPIKAL POTONGAN MELINTANG
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO TIPIKAL POTONGAN MELINTANG STA 00+010 s.d 00+065 Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

Lajur Lalu lintas


Bahu Jalan Bahu Jalan

750

170 175 375 375 100

Marka Termoplastik (Solid) Warna Putih


Beton Struktur Fc' 20 Mpa, t = 20 cm CL Marka Termoplastik ( Solid )
Beton Fc' 10 Mpa, t = 10 cm Warna Kuning
Marka Termoplastik (Solid) Warna Putih
Rel Pengaman ( Guard Rail ) Beton Struktur Fc' 20 Mpa, t = 20 cm
Saluran Berbentuk U Tipe DS-2 Beton Fc' 10 Mpa, t = 10 cm
Galian Biasa & Timbunan Pilihan Dari Sumber Galian
Geotekstil Stabilisator (Woven, Tult = 100 KN/m) 3% 2% 2% 3%

Tanah Eksisting
70
Beton Fc' 10 Mpa,t = 10 cm, Wiremesh M8 Laston Lapis Aus AC - WC, t = 4 cm
Detail A 70 Laston Lapis Aus AC - BC, t = 6 cm
240
Laston Lapis Fondasi AC Base, t = 8 cm
50
Lapis Fondasi Agregat Kelas A, t = 30 cm
Pilecap. Beton Struktur, Fc' 20 Mpa
50
10
520 100 100

Beton Fc' 10 Mpa,t = 10 cm


Beton Fc' 10 Mpa, t = 10 cm
Beton Fc'10 Mpa, t=10 cm
15000

Wiremesh M8

Bore Pile, ø 800 mm,


Beton Struktur, Fc' 25 Mpa
200 200 Stek tulangan D16-200

Fondasi Cerucuk ø10cm, L=4m

160

320

DETAIL A
Typikal STA 00+010 sd 00+065
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO TIPIKAL POTONGAN MELINTANG STA 00+065 s.d 00+100 Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

Lajur Lalu lintas


Bahu Jalan Bahu Jalan

750

170 175 375 375 100

Marka Termoplastik (Solid) Warna Putih


Beton Struktur Fc' 20 Mpa, t = 20 cm CL Marka Termoplastik ( Solid )
Beton Fc' 10 Mpa, t = 10 cm Warna Kuning
Marka Termoplastik (Solid) Warna Putih
Rel Pengaman ( Guard Rail ) Beton Struktur Fc' 20 Mpa, t = 20 cm
Saluran Berbentuk U Tipe DS-2 Beton Fc' 10 Mpa, t = 10 cm
Galian Biasa & Timbunan Pilihan Dari Sumber Galian
Geotekstil Stabilisator (Woven, Tult = 100 KN/m 3% 2% 2% 3%

Tanah Eksisting
70
Beton Fc' 10 Mpa,t = 10 cm, Wiremesh M8 Laston Lapis Aus AC - WC, t = 4 cm
Detail A 70 Laston Lapis Aus AC - BC, t = 6 cm
240
Laston Lapis Fondasi AC Base, t = 8 cm
50
Lapis Fondasi Agregat Kelas A, t = 30 cm
Pilecap. Beton Struktur, Fc' 20 Mpa
50
10
520 100 100

Beton Fc' 10 Mpa,t = 10 cm


Beton Fc' 10 Mpa, t = 10 cm
Beton Fc'10 Mpa, t=10 cm
15000

Wiremesh M8

Bore Pile, ø 800 mm,


Beton Struktur, Fc' 25 Mpa
200 200 Stek tulangan D16-200

Fondasi Cerucuk ø10cm, L=4m

160

320

DETAIL A
Typikal STA 00+065 sd 00+100
DETAIL STRUKTUR
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO DETAIL SUSUNAN GEOTEKSTIL Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

CL

Geotekstil Stabilisator
(Woven, Tult = 100 KN/m) 2%

70

70
240

50

520 50
10
100 100

200 200

Detail Susunan Geotekstil


Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO DENAH FONDASI CERUCUK Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

50 200 200 200 200 200 100 100 100 100 100 100 100 100 100 100 50

60 60

200 200

200 200

60 60

Fondasi Cerucuk ø10cm, L=4m

Denah Fondasi Cerucuk

10 5

Detail A

60
Detail A Beton Fc' 10 Mpa, t = 10 cm

Beton Fc' 10 Mpa, t = 10 cm


400 Fondasi Cerucuk ø10cm, L=4m

Fondasi Cerucuk ø10cm, L=4m

200 200
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO DETAIL TULANGAN Skala
Ruas Jalan Syaifuddin Yoes
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

80 160 160 160 160 320 320 80

80 80

160 160

80 80

Kedalaman BorePile 15 M

D19- 500 D25-125

Pilecap Beton Struktur, Fc' 20 Mpa


125 3D22 D19- 500 D25-125
D22- 200
Beton Fc' 10 Mpa, t = 10 cm

3D22 D22- 200


75
Bore Pile, ø 800 mm Sengkang
Beton Struktur, Fc' 25 Mpa ø12-150

11-D25

15000

80 80 80 80

160 160

320
POTONGAN MELINTANG
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R Ruas Jalan Syarifuddin Yoes PT. ADIYA WIDYAJASA KSO POTONGAN MELINTANG Skala
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L STA 2+490 Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

0+010.00
CL

3% 2% 2% 3%

0+020.00
CL

3% 2% 2% 3%
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R Ruas Jalan Syarifuddin Yoes PT. ADIYA WIDYAJASA KSO POTONGAN MELINTANG Skala
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L STA 2+490 Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

0+030.00
CL

3% 2% 2% 3%

0+040.00
CL

3% 2% 2% 3%
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R Ruas Jalan Syarifuddin Yoes PT. ADIYA WIDYAJASA KSO POTONGAN MELINTANG Skala
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L STA 2+490 Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

0+050.00
CL

3% 2% 2% 3%

5%

0+060.00
CL

3% 2% 2% 3%
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R Ruas Jalan Syarifuddin Yoes PT. ADIYA WIDYAJASA KSO POTONGAN MELINTANG Skala
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L STA 2+490 Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

0+070.00
CL

3% 2% 2% 3%

5%

0+080.00
CL

3% 2% 2% 3%
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R Ruas Jalan Syarifuddin Yoes PT. ADIYA WIDYAJASA KSO POTONGAN MELINTANG Skala
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L STA 2+490 Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

0+090.00
CL

3% 2% 2% 3%

5%

0+100.00
CL

3% 2% 2% 3%
GAMBAR STANDAR
Saluran Type DS-2
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO Skala
Ruas Jalan Syaifuddin Yoes Gambar Standar Saluran DS-2
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

Pipa drainase
PVC ø2"
(D1)
Pipa drainase (D1)
PVC ø2" (A1)
(A1)

Lantai Kerja Beton


Lantai Kerja Beton Fc' 10 MPa, t = 10 cm
Fc' 10 MPa, t = 10 cm
DETAIL SALURAN DETAIL SALURAN SIKU TIPE U
TERBUKA TIPE U

Tabel saluran terbuka tipe - U & dimensi


TULANGAN
TYPE Bo B Ho
Note 8 D1 A1
DS-1 400 700 350-850 P 12-150 P 12-200
DS-2 500 800 650-1050 P 12-150 P 12-200
P 12 DS-3 600 900 650-1050 P 12-150 P 12-200
DS-4 800 1100 650-1050 P 12-150 P 12-200

P 12 DS-5 1000 1300 650-1050 P 12-150 P 12-200


DS-6 1000 1300 1050-1500 P 16-150 P 12-200

Tabel saluran tipe - U tidak simetris


DETAIL 1 TYPE Bo B Ho
TULANGAN
Note 8 D1 A1

CATATAN : DS-2B 400 700 350-850 P 12-150 P 12-200


1. Gambar tanpa skala 6. Jika tidak di tentukan dalam gambar DS-3B 500 800 650-1050 P 12-150 P 12-200
2. Satuan dalam milimeter kecuali dinyatakan lain lebar bevel = 30mm x 30mm DS-4B 600 900 650-1050 P 12-150 P 12-200
3. Plat penutup saluran dicor ditempat U-Ditch boleh 7. Mutu beton Fc' 30 MPa, mutu baja tulangan BJTP-240
DS-5B 800 1100 650-1050 P 12-150 P 12-200
dicor ditempat atau pracetak desain alternatif bisa 8. Untuk kedalaman saluran > 1.5m digunakan tulangan ø16
DS-2C 1000 1300 650-1050 P 12-150 P 12-200
di ajukan untuk jenis U-Ditch pracetak
4. Jika tidak ditentukan, tebal selimut beton = 30mm DS-3C 1000 1300 1050-1500 P 16-150 P 12-200
5. Diameter pipa suling ø 2 Inch dengan ketentuan DS-4C 1000 1300 650-1050 P 12-150 P 12-200
setiap interval jarak : DS-5C 1000 1300 1050-1500 P 16-150 P 12-200
- Horizontal < 2.00 m
- Vertikal < 1.00 m
Marka Jalan
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO Skala
Ruas Jalan Syaifuddin Yoes Gambar Standar Marka Jalan
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

0
2.8
0
2.8

2.00
TYPE-1

1 5
0.
30°

2x3.50
TYPE-2
0. 4
5

2.00

3.00
30.00 TYPE-3 TYPE-1

0.50
TYPE-1
MARKA JALAN TOL
JARAK GARIS KONSTRUKSI MARKA

2x3.50
TYPE-4

4.00
DETAIL MARKA

1.00
L ACCESS ROADC TYPE-1
TYPE-3

1.00
MARKA RAMP

0.50
2 JALUR 4 GARIS
MARKA AKSES JALAN

MARKA KHUSUS PERSIMPANGAN


Max. 20 M Max. 20 M
5.00 5.00 7.50 7.50

7.50
5.00
2.00 3.00 3.00 4.50
Tabel tipe garis marka jalan

0.15

0.75

0.45
0.50

Tipe Garis Marka


0.10

0.30

15cm
I Jalan Tol
3.00 4.50

12 cm
5 8 5 8 5
II Jalan tol
0.3
0.3

0.375
0.3

12 cm
0.3
0.90 0.70 1.30 0.15 1.35 1.05 III Jalan Arteri
0.10
R=1

R=0

3 5 3 5 3
.0

.5

12cm
IV Jalan Arteri
0.25

0.45
0.60

0.30.3
0.35

1.40 1.10
1.05

Marka 3 1.5 3 1.5 3 1.5 3 1.5 3

15cm
2.50 2.50
V Memanjang Jalan
R=

pada Jalan Tol


R=1

2.10 1.65 3.75


2.0
.0

JALAN ARTERI JALAN TOL Marka 3 1.5 3 1.5 3 1.5 3 1.5 3

12cm
VI Memanjang Jalan
pada jalan arteri
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO Skala
Ruas Jalan Syaifuddin Yoes Gambar Standar Marka Jalan
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

BENTUK DAN UKURAN MARKA MEMBUJUR

1. BERFUNGSI SEBAGAI GARIS TEPI 4.a. JALAN 2 LAJUR, 2 ARAH DENGAN LEBAR > 550 CM
Tepi perkerasan dalam x x
12 cm V = < 60 Km/jam x
12 cm

3m 5m 3m 5m 3m

Tepi perkerasan luar x x


12 cm
x x

Tepi perkerasan (marginal strip) x x 4.b. JALAN LEBIH DARI DUA LAJUR
12 cm

V = < 60 Km/jam x
12 cm
2. BERFUNGSI SEBAGAI GARIS PENGARAH PADA PERSILANGAN SEBIDANG 5m 8m 5m

12 cm

Garis pengarah 5. JALAN LEBIH DARI DUA LAJUR


Tepi lalu lintas
V = < 60 Km/jam
15 cm

3m 1.5 m 3m 1.5 m 3m

Diukur dari Stop Line

Garis peringatan
Min 20 m
Min. 50 m
Garis pemisah Garis pendekat

3. BERFUNGSI SEBAGAI GARIS DILARANG PIDAH JALUR


12 cm x

xx
Garis peringatan
Min 10 cm
Maks 18 cm
xx xx

Permukaan jalan
Pemisah jalur

Min 2 mm
Maks 6 mm
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO Skala
Ruas Jalan Syaifuddin Yoes Gambar Standar Marka Jalan
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

WARNA MARKA MEMBUJUR JALAN NASIONAL

Median jalan

3 4 1 1 4 3 3 4 11 4 3 3 4 12 4 3 3 4 4 1 3 1 3 3 2 3

WARNA MARKA MEMBUJUR SELAIN JALAN NASIONAL


Median jalan

3 4 33 4 3 3 4 33 4 3 3 4 3 4 3 3 4 4 3 3 3 3 3 4 3

CATATAN :
1. Marka menerus warna kuning
2. Marka putus putus warna kuning
3. Marka menerus warna putih
4. Marka putus putus warna putih
Guide Rail
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO Skala
Ruas Jalan Syaifuddin Yoes Gambar Standar Guide Rail
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

Jarak pagar pengaman (X). Jarak pagar pengaman (Y).

Pagar pengaman W-Beam


atau Three beam

Pagar pengaman W-Beam


Kemiringan maksimum
atau Three beam
1 : 10 (10%)
Kerb (pembatas, semi peninggi
atau peninggi)

Marka tepi

Bahu jalan Jalur lalu lintas

Jalur lalu lintas

POSISI PAGAR PENGAMAN - JALAN TANPA KERB POSISI PAGAR PENGAMAAN - JALAN DENGAN KERB

CATATAN : CATATAN :
1. Rancangan ini merupakan tipikal pada jalan kecepatan tinggi
(kecepatan operasional ≥80 km/jam). 1. Rancangan ini merupakan tipikal untuk jalan perkotaan dengan
2. Pengaturan jarak (x) dari tepi terdekat jalur lalulintas ke bagian muka kecepatan operasional < 80 km/jam. Namun demikian , dapat
pagar pengaman harus mempertimbangkan lebar bahu jalan yang digunakan pada jalan dengan kecepatan lebih tinggi dengan
diperlukan untuk pengoperasian yang berkeselamatan dan keperluan pemasangan kerb.
untuk mendapatkan lebar yang mencukupi guna memberikan kepada 2. Kerb pembatas tidak boleh dipasang di depan pagar pengaman pada
kendaraan untuk berhenti secara jelas pada jalur lalulintas dalam jalan dengan batas kecepatan > 80 km/jam. Kerb jenis lain hanya bisa
kondisi darurat atau terjadi kemacetan. digunakan pada jalan kecepatan tinggi dimana pembatasan diperlukan
3. Jarak (x) harus memenuhi: 3. Jarak yang diijinkan (y) dari bagian belakang kerb sampai dengan
Yang diinginkan : 3.0 m sampai 4.0 m bagian muka rel pembatas harus sesuai dengan tabel berikut.
Minimum : 1.0 m (kecepatan kendaraan ≥ 80km/jam) 4. Tanpa memperhatikan posisi pagar pengaman terhadap kerb, ruang
: 0.6 M (kecepatan kendaraan < 80 km/jam) bebas minimum terhadap jalur lalulintas terdekat harus sama dengan
dan jarak yang lebih besar tidak di jalan tanpa kerb seperti yang diinginkan 3.0 m - 4.0 m, minimum 1.0m,
mungkinkan. (kecepatan kendaraan > 80 km/jam) atau 0.6 m (kecepatan kendaraan
< 80 km/jam)
Tipe kerb
Kecepatan operasi
Pembatasan Semi peninggi Peninggi
60 KM/H 0 atau ≥ 2.5m 0 - 1.0m atau ≥2.5m
Tidak ada
70 - 80 KM/H 0 atau ≥ 4.0m 0 - 1.0m atau ≥3.0m pembatasan
> 80 KM/H Tidak direkomendasi 0 - 1.0m atau ≥4.0m
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO Skala
Ruas Jalan Syaifuddin Yoes Gambar Standar Guide Rail
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

Pagar pengaman W-Beam Pagar pengaman W-BEAM


atau Three Beam Atau Three Beam

600 (minimum)

lihat gambar standar Lihat gambar standar


lembar 6.02.1 lembar 6.02.1
Titik perpotongan Titik perpotongan

V
:1
ax

H
M

(2
V Bahu jalan Jalur lalu lintas Bahu jalan Jalur lalu lintas

V
:1

:1
2H

XH
an
1

) ng
Panjang tiang standar Panjang tiang ditambah dengan 1000 / x

ax iri
X

M em
W-Beam : 1800 ( misal jika kemiringan 4h : 1v panjang

K
Three Beam : 2150 tiang ditambah dengan 1000 / 4 = 250)

PAGAR PENGAMAN DI AMBANG SEMPIT


RUANG BEBAS TERHADAP SLOPE (LIHAT CATATAN 2)
(LIHAT CATATAN 1)
CATATAN :
1. Pemasangan pagar pengaman pada embankment ruang bebas
minimum adalah 600 mm (diukur dari bagian belakang tiang ke titik
perpotongan embankment), sehingga didapatkan dukungan lateral
yang memadai terhadap pagar pengaman. Ruang bebas yang lebih Ruang bebas tambahan mungkin Pagar pengaman W-Beam
besar harus diterapkan pada tanah lunak. diperlukan untuk hazard yang tinggi atau Three Beam
2. Pada ambang sempit, dimana ruang bebas minimum tidak dapat guna memberikan ruang untuk
diterapkan, pagar pengaman mungkin dapat dipasang lebih dekat gulingan kendaraan
dengan titik perpotongan embankment. Dalam kondisi seperti ini, Pagar pengaman W-Beam
panjang tiang harus ditingkatkan/diperpanjang (sebagaimana atau Three Beam
diperlihatkan dalam gambar) untuk memberikan dukungan lateral C
yang memadai terhadap pagar pengaman
3. Ruang bebas minimum antara pagar pengaman dan hazard
(sebagaimana diperlihatkan dalam gambar) harus menyediakan
ruang bagi terjadinya defleksi pagar pengaman bila terjadi tabrakan.
4. Untuk pagar pengaman w-beam, ruang bebas minimum terhadap
hazard dapat dikurangi menjadi 5oomm dengan memasang tiang
pada setiap jarak 1000mm, dimulai minimal 10 m sebelum titik awal
hazard dan diakhiri pada titik akhir luar hazard (catatan: hal ini
memerlukan lubang tambahan untuk bauttiang yang disediakan Ruang bebasminimum
pada w-beams selama fabrikasi/pembuatan). terhadap hazard (C) RUANG BEBAS TERHADAP HAZARD
5. Ruang bebas tambahan terhadap hazard yang tinggi (seperti: pilar 1000 untuk W-Beam (LIHAT CATATAN 3, 4 & 5)
jembatan; tiang; kerangka gantri dan pohon) harus disediakan pada 600 untuk Three Beam
jalan dengan volume kendaraan berat yang signifikan, guna
memberikan peluang tergulingnya kendaraan yang bertabrakan
dengan pagar pengaman. Tabel di bawah memberikan arahan nilai
gulingan (diukur 4.3m di atas permukaan tanah di depan pagar
pengaman). Nilai gulingan adalah tambahan terhadap ruang bebas Kemiringan di depan pagar pengaman
minimum (c) yang diperlukan untuk defleksi pagar pengaman. Nilai Kecepatan operasi 6%(Menuju pagar Datar atau menjauhi
kemiringan dan kecepatan lain dapat diinterpolasi. pengaman) pagar pengaman
6. a. Ketinggian guardrail untuk : 60 KM/H 750 MM 500 MM
- tipe W = 68.60 s.d 78.70 cm 70 - 80 KM/H 850 MM 600 MM
- tipe three beam = 80.50 s.d 86.50 cm > 80 KM/H 1050 MM 800 MM
b. Kedalaman tertanam guardrail = 110 s.d 125 cm
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO Skala
Ruas Jalan Syaifuddin Yoes Gambar Standar Guide Rail
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

Delineator plastik
(Catatan 3)
N 02

B 03

N 02
MUR SAMBUNGAN LONGSOR
N 02 (N 01)

B 03 WB 01 7.9 Bahu oval


5.0 0.4 32 18.0
M16
R35

36.0
230
P 02 WB 02
R5 32.0 15.0
N 02 Pengaku Dia. 36
P 01
BAUT SAMBUNGAN BAUT KEPALA JAMUR
B 02 (B 01)

N 01 MUR
P 01 7.9 M16 M16 (N 01)
5.0 0.4 10 14.5
24.0

B 01 as
int
lalul 50.0 35
N 01 h
Ara
BAUT TIANG BAUT BLOK
(B 02) (B 03)
B 02
B 01
DETAIL PERAKITAN TIANG DAN REL
Kuantitas per batang
Nomor Keterangan Kuantitas
komponen
WB01 W-Beams standar ( panjang 4 m ) 1
WB02 Pengaku 1

CATATAN : P01 Tiang (tebal 6 MM - panjang 1800 MM) 2

1. W-Beams harus disusun sedemikian rupa sehingga rel yang berada P02 Blok (tebal 6 MM - panjang 350 MM) 2
lebih awal dari arah lalu lintas berada di atas rel berikutnya B01 Baut sambungan kepala jamur 16X32 8
2. Semua baut harus dikencangkan (secara optimal)
B02 Baut tiang kepala jamur M16X50 2
3. Delineator plastik dipasang pada blok dengan jarak 12 m (maksimum)
B03 Baut blok kepala heksagonal M16X30 4
N01 Mur heksagonal longgar M16 untuk sambungan 8
N02 Mur heksagonal M16 untuk tiang dan blok 6
Nama Proyek : No. Paket - CORE TEAM KONSULTAN APBN TA.2021 Judul Gambar :
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT No Lembar
D I R E K T O R A T J E N D E R A L B I N A M A R G A Penanganan Longsoran No. Link - Ahli Geoteknik: Ahli Struktur: Team Leader:
B A L A I B E S A R P E L A K S A N A A N J A L A N N A S I O N A L K A L I M A N T A N T I M U R PT. ADIYA WIDYAJASA KSO Skala
Ruas Jalan Syaifuddin Yoes Gambar Standar Guide Rail
S A T U A N K E R J A P E R E N C A N A A N D A N P E N G A W A S A N J A L A N N A S I O N A L Nama Paket /Link -
P R O V I N S I K A L I M A N T A N T I M U R STA 2+490
P e r u m a h a n B a l i k p a p a n B a r u C l u s t e r S a n F r a n c i s c o B l o k F A N o . 1 1 , 7 6 1 1 4 T e l p . ( 0 5 4 2 ) 8 7 0 6 6 1 8
Provinsi Kalimantan Timur Tanggal
A. Taufik, ST,M.Sc AW Efendi ST.,MT Ir. Dody Widodo

Delineator dalam braket plastik


dipasang di blok setiap jarak 12 M
178 178

Bagian atas tiang


2000
A 2000

(catatan 1 dan 2)
312
Puncak rel W-Beam

760
585
(catatan 3)

1800
741
Sambungan rel Pelat Sambungan rel
Min 600

585
pengaku

B B
Tepi bahu jalan atau
bagian belakang kerb
Tiang tengah 400 - 500 Beton Fc' 20 MPa
TAMPAK DEPAN POTONGAN A - A
A
Delineator dalam braket plastik
dipasang di blok setiap jarak 12 m
178 178
Muka profil kanal dihadapkan sesuai Alternatif tiang fondasi Bagian atas tiang
arah lalu lintas (Catatan 4 dan 5) 400 - 500

POTONGAN B - B

312
ALTERNATIF 1
DENAH

585
ARAH LALU LINTAS

1800
Min 600

CATATAN :
1. Bila muka w-beam di belakang kerb ≥ 1 m, tinggi pemasangan harus dengan dimensi sebagaimana ditunjukkan dalam Potongan B - B.
diukur dari permukaan jalan di muka kerb. jika jarak antara muka Tiang-tiang harus diperkuat sejajar dan setingkat sementara lubang
Tepi bahu jalan atau B B
w-beam dengan kerb > 1 m, tinggi pemasangan harus diukur dari diisi kembali dengan material bersih, material sub-base bergradasi
bagian belakang kerb
permukaan tanah di belakang pagar pengaman baik atau material basecourse berbutir, dan dipadatkan sehingga
2. Jika tidak ada kerb, tinggi pemasangan harus diukur dari permukaan densitinya sama dengan density material/tanah di sekitarnya. POTONGAN A - A 400 - 500
Beton Fc' 20 MPa
batas bahu jalan bila pagar pengaman ≤ 2m dari batas bahu 6. Fondasi dari tiang dianggap layak bila pergeseran pada permukaan
jalan. Jika jarak pagar pengaman > 2m, tinggi pemasangan harus tanah 53mm ketika gaya sebesar I kn diterapkan 200mm di bawah

250
diukur dari permukaan tanah langsung di bawah w - beam. puncak tiang dari semua arah.
3. Pagar pengaman harus dipasang sedemikian sehingga bagian atas rel Alternatif tiang fondasi
400 - 500
(Catatan 4 dan 5)
di atas permukaan perkerasan dengan dimensi sebagaimana
diperlihatkan pada gambar ini dengan toleransi + 20 mm POTONGAN B - B
4. Tiang-tiang harus dipancang ke dalam tanah sehingga tidak terjadi ALTERNATIF 2
distorsi atau kerusakan yang dapat mengurangi daya guna tiang. Tiang
harus dipasang sesuai kedalaman rencana
5. Jika tiang-tiang tidak bisa dipancang, dapat dipasang di dalam lubang
bor