2 KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE 3
PWD - Underpass
Power
1
13
27.59
5200.00
Registration
Labour & Skills
6
5
89.88
82.50
Industrial Infra
Beside the Infrastructure Projects, KIIFB has also approved the following Projects related to Industrial
Water Resources 68 3501.22 Tourism 3 73.47 Infra. The Projects are conceived as revenue generating and revenue generated will be utilised to repay the
General Education 76 2037.91 Housing 1 45.00 finance provided by KIIFB
Health & Family Welfare 16 1615.70 Local Self Government 3 31.69 Type of Project Nos. Approved Amount (Rs. in Crores)
Information Technology 3 1174.13 Agriculture 1 14.28 Industrial Park 2 1565.17
Coastal Shipping & Inland
1 566.51 Revenue 1 10.99 Land for Industrial Infra 1 12710.00
Navigation
Higher Education 26 562.02 Total 3 14275.17
Health 1 70.03
PWD - Hill
2 158.44 1 93.14
Highways
Of the above Infrastructure projects, power Rs.6431.38 crore) are conceived as projects with Water Resources 3 98.13 1 27.95 1 27.34
projects totalling Rs. 5200 Crore, IT projects revenue generating potential and revenue from the
totalling Rs. 1174.13 Crore and 5 Cultural project will be utilised to repay the finance provided Total 50 1895.31 18 575.68 17 545.40 12 450.60
Projects totalling 57.25 Crore (21 projects totalling by KIIFB.
4 KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE 5
Sector Wise Project Status of Palakkad District Depiction of Coastal & Hill Highway
Work tendered
Work Started / Kasaragod
Approved (including work Under Appraisal
Work Awarded
started)
Department
No. of Amount in No. of Amount in No. of Amount in No. of Amount in
Projects Rs. cr. Projects Rs. cr. Projects Rs. cr. Projects Rs. cr.
Kannur
Culture 1 56.48
Wayanad
General Education 7 125.43 5 89.89 55 89.59
Ernakulam
PWD - Flyovers 1 31.31 Idukki
Alapuzha
Registration 1 17.39 1 15.47 1 13.15
Pathanamthitta
SC / ST 1 5.30 1 4.54 1 3.85
Kollam
Sports & Youth
3 40.25 1 15.32 1 8.96 2 18.90
Affairs
6 KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE 7
8
KIIFB Projects
Kasaragod
Legend
— National Highway
— State Highway
— Road Projects
Higher Education Department
Kannur Cath Lab & CCU
Dialysis Centres
Sport Centres
Wayanad
Malappuram Palakkad
Thrissur
Ernakulam
Idukki
Kottayam
Alapuzha
Pathanamthitta
Kollam
Thiruvananthapurm
10 KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE 11
Main building is provided with workshops, staff Entrance Gate with Security Cabin and Compound infrastructure. This helps to incentivizes higher Sustainability has 3 dimensions defined as Triple
rooms, store etc. The first floor of the Main building is wall. The proposed floor includes Classrooms (2 performance goals beyond minimum requirements Bottom Principle comprises of social, economic &
provided with three class rooms, workshops, library, nos.), Office, Principal’s Room, Vice Principal’s and gives recognition to projects that make environmental aspects. Sustainable Engineering
office, placement cell. The Project Outlay approved Room, Conference room, Startup cell, Placement significant contributions to sustainability; and philosophies to be followed in the above phases
for the upgradation is Rs. 8.92 Cr. cell etc. Amount approved for the upgradation is provide a common language for collaboration including the processes of designing or operating
Rs. 4.107 Cr. and clear communication both internally and systems such that they use energy and other
Єʇ ²ÅŲÁÁ²¿²ʁµÆ¼¼º externally. The infrastructure development lifecycle resources sustainably.
The upgradation plan consists of construction Їʇ ²ÊÊÆÃʁ²Ä²Ã²¸Àµ includes mainly 5 stages such as planning, design &
of a main building with a plinth area of 1300 SqM. Major principles of Sustainable Infrastructure
The upgradation plan involves construction of
The academic building consists of staff dining, vice Management (SIM) upon which any sustainability
i) Courts cum auditorium – 832.32 SqM, ii) MRAC Planning
principal room, principal room, staffroom, Wireman, vision and action plan is to be developed can be
Workshop – 165.12 sq. m. and iii. Front gate and
Plumber, MMV workshop, etc. Amount sanctioned briefly listed below.
small gate with security cabin Design &
for the upgradation is Rs. 5.58 Cr. Estimaton
Formation / Levelling of Play ground is Ͽʰ Ʋ½ºÅÊÀ·º·¶
Ѕʇ Àʺ½²¿µºʁÀ˹º¼¼Àµ¶ considered in also Phase 1. The project outlay Execution Improve community quality of life, stimulate
The upgradation plan consists of i) a New Main approved for the upgradation is Rs. 4.23 Cr. sustainable growth and development, develop local
building with an area of 1157.554 SqM and ii) Front Operation & skills and capabilities, enhance public health and
gate with security cabin. ϿϾʇ ²½²¾ÁÆ˹²ʁ²½²¼¼²µ Maintenance safety, minimize noise and vibration, minimize light
The ground floor of the main building will be The upgradation plan involves i) the Main pollution, improve community mobility and access,
provided with placement cell, office, principals room, Building in three floors (LG+G+1) with an area Decommissioning encourage alternative modes of Transportation,
vice principals room, superintendent room etc . The of 4288.64 Sq.M, ii) levelling and resurfacing improve accessibility, safety & way finding, preserve
first floor of the main building will be provided with of the playground and iii) Bituminous surfacing historic and cultural resources, preserve views and
estimation, execution, operation and maintenance
three class rooms, start up cell, record room etc. The of road and ancillary works. The Main Building local character, Enhance public space.
and decommissioning.
second floor will have a seminar hall, drawing hall will have parking facility, thirteen class rooms,
and store room. The project outlay approved for the three workshops, seminar hall, stores, staff rooms, Demand assessment, Stakeholder Consultation, Ѐʰ¶²µ¶ÃĹºÁ
upgradation is Rs. 4.006 Cr. Preliminary Estimate, Inclusion in the Budget and Provide effective leadership & commitment,
principal room, vice principal room, superintendent
Administrative Approvals comes under Planning establish a sustainability management system,
Іʇ²¿¿Æà room, waiting rooms, record room, store and library.
Stage. The Functional Design, Engineering Design,
The Project Outlay approved for the upgradation is foster collaboration and teamwork, provide for
The upgradation plan involves construction of a Detailed Estimation, Technical Sanction comes under
Rs. 12.79 Cr. stakeholder involvement, pursue by-product synergy
main building with the plinth area of 789.5 M2 and Design & Estimation. The Procurement Process, opportunities, improve infrastructure integration,
Contract Management, Quality Management comes plan long-term maintenance and monitoring,
under the Execution Stage. Routine Operations, address conflicting regulations and policies, extend
Sustainable Infrastructure Management (SIM) Routine Maintenance, Periodic Maintenance & useful life, innovate or exceed credit requirements.
Upkeep come under Operation and Maintenance.
Sustainable infrastructure development enables facilities, Administrative facilities, Environmental Dismantling & Safe Disposal and exploiting Ёʰ¶ÄÀÆô¶½½À´²ÅºÀ¿
sound economic development, job creation and the Protection Facilities, Waste Management Facilities, reuse and alternate use potential are issues in the Support sustainable procurement practices, use
utilisation of local goods and services and impacts Agricultural Facilities, there is a huge potential for decommissioning phase. recycled materials, use regional materials, divert
the economic viability and competitiveness of integrated sustainable development initiatives. waste from landfills, reduce excavated materials
The conflicts are identified at different stages
our communities. The facilities built based on the However, Infrastructure development organisations taken off site, provide for deconstruction and
and the conflict management at various stages are to
principles of sustainability enhances quality of life like KIIFB must know how their actions, interventions recycling
be adopted are stakeholders consultation at various
for citizens, increases positive impacts (benefits), and decisions will contribute to sustainability or not. stages, proactive approach to potential issues,
helps protect our vital natural resources and The challenges include bringing to the attention planning and design to suit the local needs, concern
Ђʰ²ÅÆò½Àýµ
environment, along with the promotion of a more of all stakeholders the need for more sustainable Preserve prime habitat, preserve wetlands
about environment at all stages, value for money
effective and efficient use of financial resources. infrastructure and communicating the shared and surface water, preserve prime farmland,
approach in project management , strict adherence
As KIIFB has key role in development of understanding of what sustainability means. Rating avoid adverse geology, preserve floodplain
to regulatory norms, understand and act positively
infrastructure in sectors such as Transportation, systems proposed by various agencies provide a functions, avoid unsuitable development on
on the issues of project affected people, methods
Water Supply & Sewerage, Inland Navigation, Energy, consistent, consensus-based framework for assessing steep slopes, preserve greenfields, manage storm
like social audit, sustainability based infrastructure
Communication, Recreational, Sports & Hospitality, sustainability and resilience in infrastructure and water, reduce pesticides and fertilizer impacts,
design and management.
Health Services Facilities, Academic and Educational set the standard for what constitutes sustainable
12 KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE 13
prevent surface and groundwater contamination, the projects are acceptable to KIIFB standards from • Support the organizational level initiatives • Initiate and co-ordinate capability building
preserve species biodiversity, control invasive sustainability perspective. No funding for projects of SPV’s to adopt sustainable infrastructure activities to manage the issue of huge resource
species, restore disturbed soils, maintain wetland which are having components violating principles of management practices. shortage in the project organisations and sector.
and surface water functions, innovate or exceed environmental sustainability.
credit requirements. • Formulate guidelines for availing the services • Develop frame work for carbon management
In project planning phase KIIFB supports SPV’s
of rating agencies, experts and resource persons in infrastructure projects with the objective of
Ѓʰ½º¾²Å¶ȹ¶Äº½º¶¿´¶ to develop the infrastructure facilities in a social,
required by the SPV’s for their project specific attracting finance and investment in the sector.
environmental and economical sustainability
Reduce greenhouse gas emissions, Reduce requirements.
framework. Ensure project specific funding • Promote low carbon procurement policies
air pollutant emissions, assess climate threat,
support to SPV’s for conducting studies and • Act as a technology support provider with respect and facilitate the green supply chain initiatives in the
avoid traps and vulnerabilities, prepare for long-
capacity development for developing sustainable to new and sustainable technologies in key sectors. construction sector.
term adaptability, prepare for short-term hazards,
infrastructure plans. Support for approaching rating
manage heat island effects, innovate or exceed credit
agencies to associate with the project development
requirements of rating agencies.
À½º´Ê·Ã²¾¶ÈÀü
process from the initial stage itself. Training to the
key personnel in SPV’s for carrying out the planning RECENT RBI LENDING POLICY
Thrust on public procurement of infrastructure and design process conforming to the sustainability
philosophies.
DECISION - IMPACT ON KIIFB
with focus on value for money through the entire
lifecycle and following the low carbon inclusive Developing the framework for evaluation of The Reserve Bank of India recently reduced the more funds to flow in via this route as lower repo
growth models advocated by national level carbon–foot print (keymeasure of sustainability) repo rate by a marginal 25 basis points following a rates would lower interest rates of MV loans as well,
organizations like Planning Commission / Niti ayog during execution and operation of the facility decision by the RBI Monetary Policy Committee. The which would ideally push up the motor vehicle sales.
and adopting provisions in ECBC, NBC guidelines and provide advisory support for appropriate and new repo rate now stands at 6.25 from the earlier 6.50. The resultant increased inflow, besides lowering
shall be considered as basic guidelines in KIIFB sustainable technologies applicable for each sector Repo rate, also known as the benchmark interest the need for borrowed funds, can also enhance the
approach to sustainability. are also to be considered as prime tasks in KIIFB’s rate, is the rate at which the RBI lends money to the creditworthiness of KIIFB.
KIIFB vision shall be to promote and facilitate context. banks for a short term. When the repo rate increases, The lowering borrowing costs reduces inflation
sustainability-based planning and design of During the implementation phase KIIFB shall borrowing from RBI becomes more expensive. RBI and cost of production. This will also be beneficial
infrastructure systems in all sectors through a evaluate the adequacy of SIA, EIA and other increases the repo rate when it wants to limit the to KIIFB as lower input cost of materials would lead
route with least stress on diminishing natural commitments made during the planning stage. borrowing by the banks. Similarly, if it wants to pump to lower quotes for implementing KIIFB projects. A
resources, without compromising the social needs, Evaluate the implementation process to confirm the money into circulation, it reduces the repo rate and high repo rate would have the opposite impact.
maximised use of renewable and natural resources commitment given by SPV’s in each area. makes it cheaper for banks to borrow money. Also, The announcement by the RBI Monetary Policy
and minimized use of energy and water, improved the reverse repo rate (the interest rate at which banks Committee regarding the shift in its policy stance
pollution prevention by reduced carbon emissions KIIFB shall associate with the rating agencies
lend money to the RBI) has been lowered to 6.0%, from calibrated tightening to neutral is welcoming
and better labour and community relations. The other for accommodating design improvements in the
forcing banks to lend more to the market. for KIIFB. This would mean that the repo rate is likely
important aspects shall include selection of materials execution process. Analyses of the output given by
execution and rating agencies for developing sector The main impact of the RBI action of reducing to remain steady for a longer period of time. Steady
and products that minimise environmental impacts repo rates would enable KIIFB to fine tune a strong
specific intervention methodologies and monitor the the repo rate is that bank loan interests are likely to
by reuse of the existing infrastructure, identification Asset Liability Management (ALM) which plays a
compliance of EMP, HSE, etc. will ensure that the become cheaper.
of facilities near public transport systems and vital role in anticipating the liquidity risks.
consideration of redevelopment of contaminated SPV’s are in the right track of sustainability. KIIFB The recent changes made in the Repo rates is
properties and increase the use of recycled content shall also help SPV’s to develop sustainable O&M likely to favour KIIFB in its financial obligations. To sum up, the recent monetary policies adopted
and other environmentally preferred products. plan and auditing process as post project completion The decrease in Repo rate would enable KIIFB to by the RBI are giving positive vibes for KIIFB as we
Developing transportation criteria that prioritize support activities. borrow at a lower cost. Since a fair share of the state’s look forward to evolve and grow as an efficient and
low-impact transportation models are also important Motor Vehicle Tax revenue is now flowing to KIIFB, effective institution to roll out the State’s prestigious
along with above considerations. ¹¶²Ê·ÀÃȲõ with the lowering of repo rates, KIIFB can expect projects on time.
To achieve the objective of bringing all
Based on the current level of activities KIIFB shall
infrastructural developmental activities in the ambit 22600 Registered Customers
after the project selection phase, which takes place
of KIIFB’s investment plan, the following actions
at Govt. level, KIIFB evaluates the projects from 4254 Subscribers
shall be initiated.
sustainability and environmental aspects and revert
Registration open for all GCC Countries
to govt. if the objectives and design are not acceptable • Develop organizational level sustainable
as per the accepted principles. Provide assistance to vision and action plan with strategies aligned with 141 Chitty announced for UAE, OMAN, BAHRAIN and KUWAIT
SPV’s and Government to rework the plan so that national and international level policy guidelines.
14 KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE KERALA INFRASTRUCTURE INVESTMENT FUND BOARD - DEFINING THE FUTURE 15
Administrative Inspection Wing notes...
During the last fortnight the Administrative Mararikkulam where the work started on 21.11.2018
Inspection Wing (AIW) inspected the progress of and is progressing well.
implementation of the Project “Construction of 52 Of the 37 works approved under Ernakulam
Office Buildings for Registration Department” by the Circle, the project files of the works tendered at
Kerala State Construction Corporation Ltd (KSCC Ernakulam Circle Office (25) and Trissur Regional
Ltd) at an estimated cost of Rs. 89.88 Cr. Out of the Office (7) were verified. The works tendered at
52 sub-projects approved by KIIFB, 15 are under Kozhikode and Kannur Regions (2+3) are to be
Thiruvananthapuram Circle and the remaining 37 verified. Out of the 32 tendered works, agreement
are under Eranakulam Circle. The status of work executed for 17, work order issued for 13, re-tender
progress in each Region under the above Circles are initiated for West Hill, Kozhikode and tender not
given below: floated for the other Manamchira, Kozhikode due to
delay in getting building permit.
Southern Circle at Thiruvananthapuram The works that have started in 11 sites are
Kuzhippilly (Ernakulam), Thodupuzha (Idukki),
Sl Total Work Agreement Work
No
Regional Offices
Works Tendered Executed Started Akkikavu (Thrissur), Kunnamkulam (Thrissur),
Pazhayannur (Thrissur), Thrithala (Palakkad),
1 Thiruvananthapuram 9 6 2 1 Kuttipuram (Malappuram), Thanoor (Malappuram),
Kalpakancherry (Malappuram), Permbra
(Kozhikode) and Thalipramba (Kannur).
2 Alappuzha 2 1 1 1
The Regional Manager, Eranakulam reported
mudslide at the construction site of Kuzhippilly
3 Kottayam 4 3 2 2
(near Vypin) during foundation works for Columns
posing threat to the nearby structures but there is no
The Technical Sanction amount for 3 works viz. provision in the estimate for preventing mudslide.
Kanjiramkulam, Chirayinkeeze and Navayikkulam There is reported presence of Clay in a depth of 1.5
exceeds KIIFB sanction and the same was intimated mtrs which could not be identified at the time of soil
to KIIFB for approval. The works started in 4 sites viz. investigation. The request for changes in design and
estimate has been submitted to the General Manager
Northern Circle at Thiruvananthapuram for further processing.
The Inspection also observed the following
Sl
Regional Offices
Total Work Agreement Work drawbacks in the tender process:
No Works Tendered Executed Started
• Several works were retendered due to
1 Eranakulam 3 3 2 2 insufficient participation of bidders. It was
observed that wide publicity of tender was not
given which could be the reason for the poor
2 Thrissur 16 16 10 7
participation of bidders.
• Agreements were not executed in some cases
3 Kozhikode 13 11 4 1
though the work orders were issued in time as
the Contractors failed to submit the required
4 Kannur 5 2 1 1 Performance Guarantee within the prescribed
time limit.
Kanjiramkulam, Mararikulam, Thopramkudi and • The WBS (Base line-1) is not prepared in many
Udumbanchola and the AIW visited the site of SRO cases.