Batching Plant Inspector
Qualification Guideline [Vol-3]
www.qcskills.com
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Concrete batching plants provide the highest quality of concrete for every single
project. Depending on the project, jobsite and required capacity, stationary,
mobile, compact and on-site concrete batching plants are available.
Difference between QA and QC, Quality Manual and quality plan , Documents and records.
Just go through Table -2 of SAES-Q-001
Q1. What are the minimum concrete cylinders should be cast for each set to be
tested for compression strength as per Saudi Aram co standard?
Answer: 4
Q2. What is the maximum allowable fresh concrete temperature until used as per
Saudi Aramco standard?
Answer: 32 OC
Q3. What are the requirements of water to be used for curing concrete specimens
as per ASTM specification?
Q4. In what temperature range should concrete specimen be cured as per ASTM
specification?
Q5. At what age concrete cylinders should be tested for Saudi Aram co projects?
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: ( 15 min )
Q9. The slump test is filled in ( 3 ) layers. And each layer shall be rod for
Answer: ( 25 strokes).
Q10. The diameter of standard tamping rod casting six inches diameter cylinder
is 5/8"
.
Q11. How many seconds does ASTM specifies to remove the slump cone?
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: ( 5 +- 2 sec)
Q12. The number of blows, layers, and size of proctor molds depends
on of soil?
Answer: Gradation
Q13. How many layers do you apply during standard proctor compaction?
Answer:
A: (Mold dia 4" 3 layers, 25 Blows/layer B: Mold dia 6" 3 Layers, 56 blows/layer
Q14. How many layers does the modified proctor consist of?
Q15. How many points (as minimum) does modified proctor test should be
consisted of?
Answer: ( 96 Hrs )
Q17. What sieve size do you need to obtain a sample for liquid/plastic limits?
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: ( # 40 )
Q18. At what temperature do you dry soil sample that is prepared for gradation
only?
Answer: (110 + 5 0C)
Answer:
a: Quartering the sample
b: Keep the sample in oven for dry at 110 + 5 degree centigrade
c: Sieve the material on specified meshes and note the retained weight on each sieve.
d: Calculate the percent passing for each sieve.
Q20. At what sieve size do you wash soil sample in order to determine the % of fine
materials?
Q21. What are the Safety equipment do you need when you perform field density
test using nuclear gauges?
Q22. Briefly describe how to conduct field density test using a nuclear gauge?
Answer:
Take standard count for density and moisture to confirms the counts as per
calibration Certificate
Select the location at least 10 meter away from structure and make hole by rod
minimum 2'' more deeper the testing depth.
Keep the Nuclear at hole in position so that the soil not disturbed by rod.
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Q23. Briefly describe how to run CBR test as per ASTM procedures (compaction
and penetration)?
Answer:
Prepare 3 specimen molds for compaction as follow: 10-Blows5 Layers
25-Blows''
56-Blows''
After compaction soak the specimen for 96 Hrs, drain for 15 minute after soaking and crush
taking reading @ 1", 2" penetration.
Q24. What is the minimum weight of fine aggregate for sieve analysis as per ASTM
C136?
Answer:
1. 100g
2. 300 g
3. 1000g
4. 1500g
5. 2000g
Q25. After the soundness cycles, what sieve sizes do you use to determine fine
aggregate loss?
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer:
a. # 4'' b. # 1/4'' c. 5/16'' d. ( In the same sieve on which it was retained before the
test.)
Q26. After the soundness cycles, what sieve sizes do you use to determine coarse
aggregate loss?
Answer:
a. # 4''
b. # 1/4'' c. # 5/16''d. (depends on aggregate fraction size.)
Q27. What is the minimum weight of coarse aggregate for sieve analysis as per
ASTM C 136?
Answer:
Size 2'' Kg 20
1 1/2'' 15
1'' 10
3/4'' 5
1/2'' 2
3/8'' 1
a. 2000g b. 100g c. 1000g
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
d. 1500g
Answer: ( 5 cycles )
Q30. What type of solution shall be used to perform soundness test as per Saudi
Aram co requirements?
Answer:
a. 12 +/- 4 hours.b. 300g
c.( 24 +/- 4 hours )d. 48 +/- 4 hours.
Q32. To prepare Clay Lump fraction as per ASTM C 142, the mass of aggregate
should be:
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer:
a. 500g b. 300g c. 10,000g d. (Depends on the aggregate)
Q33. Prior running liquid limit, you should place the prepare material in its
mixing dish and cover to prevent moisture loss for at least
Q34. Explain in brief how you perform Maximum Index Density and Unit weight of
soil using a Vibrating Table (using wet method)?
Answer:
1. Take Minimum density loose
2. Keep mold on vibrating table surcharge weight on it
3. Remove water from top of mold with sponge.
4. Sample should be in SSD conditi
Bar Bending Schedule, commonly referred to as “BBS” is a comprehensive list that
describes the location, mark, type, size, length and number, and bending details of each
bar or fabric in a Reinforcement Drawing of a Structure.
This process of listing the location, type and size, number of and all other details is called
“Scheduling”. In context of Reinforcement bars, it is called bar scheduling. In short, Bar
Bending Schedule is a way of organizing rebars for each structural unit, giving detailed
reinforcement requirements.
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
· The bars should be grouped together for each structural unit, e.g. beam, column, etc.
· For cutting and bending purposes schedules should be provided as separate A4 sheets
· The form of bar and fabric schedule and the shapes of bar used should be in accordance
with BS 8666.
· It is essential that the bar mark reference on the label attached to a bundle of bars refers
uniquely to a particular group or set of bars of defined length, size, shape and type used on the job.
· This is imperative as a bar mark reference can then point to a class of bar characteristics.
Also, this helps steel fixers and laborers keep track of the type and number of bars needed to
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
· Detailer
· steel fixer
Diameter
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Spacing
Length of bar
Cutting Length
Number of bars
Most of the information in a BBS can be found in reinforcement drawings of the structural unit. Bar shape, diame
Number of bars:
Suppose the spacing of stirrups is 150 c/c and the length along which they are placed is 6800 mm,
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Cutting Length:
We must remember than steel is ductile in nature and is subject to elongation. Hence, the length of a
bar is increased when bends or hooks are introduced. Hence, certain deductions are needed to offset
For 45 degree
For 90 degree
Cutting length = Total length – 2 x Dia of bar x No. of bends
For stirrups:
90 degree hook:
Length of stirrup = (2A + 2B) + 20 x dia
135 degree hook:
Length of stirrup = (2A + 2B) + 24 x dia
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
bar bending schedule calculation pdf,bar bending schedule calculation excel,bar bending
schedule for slab,bar bending schedule for column,bar bending schedule format,bar bending
schedule example,bar bending schedule calculation for footing,bar bending schedule software
free download,how to prepare bar bending schedule in civil engineering pdf,rebar detailing, bar
barbend, rebar detailing,steel bar bending, bar bending schedule software,bar bending
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
QUE 37- How will trucks be checked on-site when receiving concrete?
B. Ticket Checked for Concrete Batching time and Slump Value at the plant.
C. Slump Test.
specification.
Answer: - To determine the consistency of the workability of the concrete mix and to check for
Answer: - 2.5cm to 7.5cm (for vibrated structure and without admixture ) and If with
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
QUE 41 - What is the maximum temperature of concrete that can be poured into a
concrete structure?
Answer: - 32 Degrees C.
Answer: - Min is 5 Degree C in cold weather and 45 degrees C max for hot weather.
QUE 43 - Min and Maximum temperature of concrete at the site prior to pouring?
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: Water Curing - as in ponding, spraying, wet sand and wet earth
Membrane Curing - as in plastic film, liquid membrane curing compound, and reinforced paper
Steam Curing.
QUE 46- When will you apply the curing of the concrete?
Answer: - After the concrete has initially set (35 to 40 minutes is the initial setting time of
concrete)
QUE 47 - For how many days are you going to cure a structure?
Answer: - Seven days (in some cases like PPC types of cement, 14 days of curing are
recommended)
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: - It is the formation of a compound by the combination of water and other substances
Answer: - At least two times. The second application is perpendicular to the first and applied
QUE 50 - Concrete Curing Water shall not have more than.......................Of total
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: - Increased strength, Increase water tightness, Lower absorption, Increased resistance
QUE 55 - How would you compare 7 days and 28 days compressive strength of
concrete?
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: - Poor Curing Practice, Poor design, Poor Vibration which results in segregation, less
rebar covering, poor quality of concrete, movement of falsework or forms, higher water-cement
ratio, Severe atmospheric attack which shows the effect on the heat of hydration with water
initially
Answer: - The cylinder and the cubes for the compressive strength test.
QUE 61 - Within how many hours should concrete mix be discharged after leaving
the batching plant or after all the aggregates, cement, and water are in the mixer?
Answer: - Within one hour if the mixer is an agitated mixer (Also depends on the design mix)
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: - 35 to 40 minutes.
(concrete)?
Answer: - 50 to 90 seconds
Answer: - 6 to 18 rpm
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
QUE 69 - How would you know if the concrete has gained its initial set?
Answer: - If there is no more water seen (brightness) on the surface of the concrete, or if there
QUE 70 - If agitated concrete is discharged after more than one hour, what will
happen?
Answer: - The concrete is over mixed, becomes hot, and the strength is reduced
QUE 72 - How many strokes are done in one layer in a concrete cube?
QUE 73 - What is the size of rode used in concrete cube casting and slump test?
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: - Height - 20cm, Top of Cone - 10cm, and Bottom of cone - 20cm.
QUE 77- How many strokes are done in one layer in a slump test?
Answer: - 25 Strokes
Answer: -
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
A. The maximum height of the concrete drop is less than or equal to 1.5 meters.
revolution counter, no adding water after batching, and concrete is placed in such a manner to
prevent segregation (only shovels can be used to move concrete around inside the forms no
C. Proper vibration must be implemented (proper vibrating - dropping the vibrator under its
own weight until it gets to the desired drop height, then leaving it there for 3-7 seconds then
pulling at the count of 3 to 4 seconds. When vibrating subsequent layers, vibrator must
D. Some labors must be continuously watching the forms in case a wall is being poured, proper
height of each concrete lift must be observed, such as the usual 600mm stated normally in
project specifications. Also, tamping on the wall is necessary to assist in the consolidation
process.
E. The concrete temperature and the slumps are two strong indicators of the inspector's
knowledge. A slump between 75mm and 125mm is normal for normal pours. The maximum
allowed temperature for concrete when arriving at the project site is 32 degrees celsius.
80) Clean Sand: what is the max % to be passed in no. 200 sieve?
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer: 10%
Answer: (6M)
82) General Fill Material shall consist of gravel, sand and/or marl. The
maximum size of the fill material shall be one-half the lift thickness or mm),
whichever is less
Answer: ( 75mm)
83). The portion of Select Fill material passing the No. 40 sieve shall have a
maximum liquid limit of ----- and a maximum plasticity index of--------per ASTM
D4318
Answer: ( 0.6 m)
86) In no case shall compaction be allowed on slopes greater than ----- (V) to -------
(H)
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
Answer:.( 1V 5 H)
87) The moisture content of the material being compacted shall be within ------------
-, of the optimum moisture content as determined by ASTM D1557.
Answer: (+/- 3)
88) Tests shall be performed for Select Fill Material under all foundations,
buildings and process areas - one test every------------of each lift.
89) APCS-10 is not suitable for direct --------- and ---------- as per SAES-H-003
90) Paving slabs subject to vehicular traffic shall be a minimum thickness of --------
------- mm of reinforced concrete
Answer: ( 150mm )
Answer: (14)
92) What is the minimum strength of the concerete for S2 type exposure as
per SAES Q-001 table 2
Answer: ( 32 MPa)
93) Minimum concrete cover in sulfur pits shall not be less than-----------mm
Answer: ( 75mm)
www.qcskills.co
OIL & GAS STANDARD
QA/QC - CIVIL
Batching Plant Interview
Questions Vol-3
94) Saudi Aramco shall be notified before proceeding with repair if the defect is
the following: Depth is greater than---------mm at the maximum point and surface
area is greater than------------mm