You are on page 1of 248

Questions Database ( No's :200) Home Review

Home Review
S.No. Questions Answer

1 The minimum concrete slab thickness supported on the ground is B

2 Minimum compressive strength of structural concrete at 28 days is ……… C

The prime coat for asphalt paving shall be cured minimum of not less
3 A
than …….. hours.

4 Curing of concrete shall be done continuously for at least …….. days B

5 No marl fill material shall be retained on . .. ............sieve C

Under foundations with static loads over 320kPa and foundations for
6 vibrating or heavy machinery and pavements ….….% of the maximum B
density as determined by ASTM D1557 for cohesive materials.

Fine grout mix proportions shall be …... Part Portland cement …….. Part
7 slaked lime and parts fine aggregates.(ACl 530.1, Sec. 2.6B.1) A

Concrete shall be discharged from the mixer within ………..of the mixer
8 D
from the time the mixing water was added. ASTM C-94, Sec. 11.7

Place concrete in layers not to exceed thick and consolidate.(ACl 301,


9 D
Sec. 8.3.1.3)

The labortory California Bearing Ratio (CBR) per ASTM D1883 or AASHTO
10 T-193 for base class material at 100% compaction D1557 shall conform D
to:…………
Testing shall be Conducted at a rate of one test every ……. Of base 'or"
11 C
Sub-base

If application of the surface course is delayed by more than…………...or if


dirt, sand, or other impurities have contaminated the tack coat, then a
12 D
new tack coat shall be applied after the original one has been swept
clean.

Gypsum board width shall be 1220mm to 1370mm with a tolerance of


13 under the specified width. (1997 UBC, Sec. 2502.14; ASTM C36, Sec. B
6.2.2)

How many days should a masonry wall be cured prior to grout pouring
14 C
for high lift grouted construction?

15 Light weight aggregate shall have a dry loose weight of ……….. or less C

Reinforcement bar used to resist shear and Torsion Stresses in a


16 C
structural member is?

17 Adding chemical to the concrete lead to….? A

18 Minimum clear spacing between parallel bar in a layer shall be …? A

The minimum bend diameter for No.16 Bar commonly used for stirrups
19 B
and ties shall be ………………..
20 Enlarging of bolt hole can be made by buring, gouging or dift punching B

The minimum time that a plastic sheet should be in place on concrete


21 surface to determine its moisture content by plastic sheet method, ASTM B
D4263 is

22 End of Vibration to be covered with as coate bar used in concrete. A

Dune sand or clean sand used, as fill material requires a cap layer of
23 A
cohesive material, 150mm thick to 300mm thick.

24 Base and sub base of asphalt paving shall be compacted to …… and …… B


%.respectively of the maximum laboratory density.

25 ACI means, A

26 Amount of selected fill material passing ..................sieve shall be 100%. B

Compaction shall begin only after the fill or backfill has been properly
placed and the material to e compacted is at the proper moisture
27 D
content………….of the optimum moisture content per ASTM D1557 or
ASTM D698, whichever is applicable.

Fill or backfill placed beneath footings, grade beams, mats, buildings, and
28 process areas shall be compacted to at least …….% of the maximum B
Modified Proctor density as determined by ASTM D1557
When the extent of damaged coating exceeds _____ % of the surface
29 area of the coated steel reinforcing bar in any 0.3m (1-ft) length, the B
coated bar should be rejected. (ASTM A775, Sec. )<1.3.8)

Concrete shall not be dropped freely where reinforcing will cause


30 B
segregation nor where it would fall freely for more than ……………..

The labortory California Bearing Ratio (CBR) per ASTM D1883 or AASHTO
31 T-193 for sub base class "A" material at 95% compaction D1557 shall A
conform to

The rolling shall continue until the base materials are compacted to no
32 less than ……..% of the maximum laboratory dry density (per ASTM D- C
1557 or AASHTO T-180) for the full layer depth

33 Tack coats shall not be placed during rain, on a moist surface when the D
air or surface temperature is below ………….

Direct Buried Cable / Conduit Trench - A minimum of ……….. dry sand


34 D
cover shall be installed on top of the cable or conduit (as a cushion).

The minimum time that a plastic sheet should be in place on concrete


35 surface to determine its moisture content by plastic sheet method, ASTM D
D4263 is

What are the things mixed with a cementing __is form a hydraulic
36 A
cement concrete or mortar?

37 Reinforcement formed in a cylindrical helix ______? A


38 Deformed Reinforcement shall be conform to…? B

39 The avarage strength of 3 core is equal to ……………… % B

Construction joints in floor shall be located in the ………… of span to slabs,


40 B
beams & girders.

The structural steel members, the bolts shall be tightened to a SnUg –


41 A
tight condition.

42    Is the hot dipped galvanized steel may be embedded in concrete? A

Free draining soils or cohesion less material shall be compacted to ……….


43 A
% relative density

44 Concrete may be allowed to drop freely at a maximum height of? B

45 ASTM means ??? A

46 Fill material retained on 75mm sieve shall be ………%. A


Fill material shall be placed in lifts not exceeding in loose depth for hand-
47 C
operated compaction.

The bottom of pipes in the trenches shall be above …………of the highest
48 D
recorded ground water level

The concrete specimens shall be subjected for final curing with free
49 water maintained on their surfaces at all times at a temperature of B
(ASTM C94/ASTM C-31 sec. 10.1.3)

Water curing shall be continuous until the compressive strength has


50 A
reached 70% of the specified strength, but not less than ………….

The compaction requirements shall be equal to or greater than


51 ………………% of the Marshall density (ASTM D2726/ASTM D1559), based C
on material sampled from the road site.

The rolling shall continue until the subbase is compacted to no less than
52 ………% of the maximum laboratory dry density (per ASTM D-1557 or B
AASHTO T-180) for the full layer depth

The tack coat shall be applied on paved surfaces and vertical surfaces
which will be in contact with the asphalt paving by means of a bitumen
53 B
distributor at a maximum rate of …………….

Direct Buried Cable / Conduit Trench - A minimum of dry sand shall be


54 installed from bottom of trench to bottom of cable or conduit (as a C
cushion).

55 The minimum thickness of gusset and stiffener plate should be? A


56 ACI - 318M-95 Means? A

Method of pre stressing, the tendons are tensioned before concrete


57 B
is…………… ?

58 What is the test Cylinder size of concrete compressive strength test ? B

59 Concrete cores shall be immersed in water for ……….and be tested wet. A

60 Concrete cover for pipes, conduits shall not be less than ……. For concrete C
exposed to earth or weather.

Tolerance in minimum concrete cover in component, which has depth of


61 B
≤ 200mm?

62 Minimum thickness of cantilever solid slab is……..? D

63 The minimum thickness of gusset and stiffener plate should be? A

Fill materials shall be placed in lift or layer not exceeding ………in loose
64 C
depth.
65 Rakes and vibrators may be used to move concrete after placement B

Mixing water for concrete shall not contain more than …….. of total
66 A
dissolve solid.

Concrete mix with temperature of more than …… degrees centigrade


67 B
shall be readily rejected

68 Fill material shall be placed in lifts not exceeding ………… in loose depth. B

69 Below foundations applying.? C

The pipe shall be embedded in clean sand not less than above the top of
70 D
the pipe.

Allowable concrete temperature during delivery and placement shall be


71 C
maximum.

Maximum total dissolved solids in water used for moist curing shall not
72 B
exceed........

All compaction shall be completed before the temperature of the mix


73 C
falls below ………….
The water content of the base or subbase material shall be maintained to
74 within of the optimum moisture content per ASTM D-1557 or AASHTO T- B
180 during compaction.

75 Maximum distance of epoxy grout points. A

The prime coat shall be applied at a temperature between ………… for


76 A
MC-250.

77 For trench deeper than………..,RTR pipe shall be assembled in the trench. A

78 In bolted connections, what is the minimum size of high strength bolts A


that should be used?

79 A beam with a depth of 8 inches requires minimum of …….rows of bolts. A

Method of pre stressing in which tendons are tensioned after concrete


80 A
had hardened is?

81 What is TDS ? B

As part of investigation on concrete structure, which one is destructive


82 B
testing...?
The conduits or pipes embedded in slab, wall or beam shall not be larger
83 B
in out side dimension than ……….the overall thickness of these structures.

84 Tolerance in of component,in depth of > 200mm is? B

85 Thickness of bearing wall shall not be less than ………. C

In bolted connections, what is the minimum size of high strength bolts


86 B
that should be used?

87 A fill material to be classified, as "select fill" shall contain ………….% C


particles passing thru #200 sieves

Conduits, pipes and other items made of aluminum can be embedded in


88 A
structural concrete if effectively coated.

89 End lap for metal panels shall not be less than? A

90 A beam with a depth of 8 inches requires minimum of …….rows of bolts. A

91 Using Proper vibrating in concrete as ………. B


92 Clear space on all sides of excavation shall be at least………….. B

The final finished right of way shall be at least …...meters wide and
93 B
…………. meters in Sabkha areas.

Temperature test shall be made with a frequency of not less than one
94 test for every of concrete on each day, or 1 test each day for each class C
of concrete delivered. (ASTM C94-04, Sec. 16.5)

Variation in elevation of the tops of anchor bolts shall be equal to or less


95 B
than (AISC .1c)

The hot mix asphalt concrete shall be placed only when the air
96 temperature is above ………………. and it is not foggy, rainy and the C
existing surface is free of moisture.

Granular base materials shall be placed in layers of uniform thickness


97 A
with approved spreaders not exceeding …….. after compaction

The prime coat shall be applied at a temperature


98 C
between ... ... .... .. .............for MC-70

Minimum Compressive Strength of pre-packaged cement based grout at


99 D
28 days shall be

The minimum thickness of grout between the foundation and base plates
100 D
shall besteel 1m and Packings to be provided
Fill materials shall be placed in lift or layer not exceeding ………...in loose
101 B
depth.

102 Basic Requirement for strength design? A

103 Pontlard cement shall be confirm to …. A

As per ACI 318M sec. 5.6.1.1 , sample grouting shall be taken not less
104 B
than once a day or less than ……… m³ of concrete.

105 Conduits and pipes of Aluminum can be embedded in concrete, if it is A


effectively coated.

For Cast-in-place concrete size of spirals shall not be less than …..
106 C
Dimeter.

Minimum number of longitudinal in a Compression member shall be


107 C
………..

How many days should a masonry wall be cured prior to grout pouring
108 C
for high lift grouted construction?

109 Minimum diameter of anchor bolt using to fixing ladder ….. C


110 The maximum particle size of fill material shall be? A

Paving slabs subject to vehicular traffic shall have a minimum thickness


111 B
of?

Control or construction joints for concrete paving shall be spaced at a


112 C
maximum ofmeters in both directions.

Asphalt mix can be placed & compacted if the temperature is not less
113 A
than 139 degrees centigrade.

114 Cementations non-shrink grout shall have a compressive strength ………. C

Bituminous mixture shall be compacted to …… % of the marshal density


115 A
per ASTM D 1559

116 Prime coat shall be applied using a pressure distributor at a rate of? A

As a minimum, 'Select Fill Material' shall be used within of the bottom


117 elevation of fundations, spread footings, or slabs-on-grade when fill is B
required to achieve final grade.

Any excavation or trench with a minimum depth of ……….,the shoring


118 shall be installed or the sides shall be sloped or benched and treated as a B
confined space.
Under foundations with static loads over 320kPa and foundations for
119 vibrating or heavy machinery and pavements ........ ..... ..% of relative D
density (ASTM D4253/ASTM D4254) for cohesion less soils.

The depth of the test holes for nuclear method shall be no greater than
120 D
deep. (ASTM D 2922…SEC 1.1)

Coarse grout mix proportions shall be: …...part Portland cement; …….part
121 A
slaked lime; …….. parts coarse aggregates. (ACI 530.1, Sec. 2.6B.1)

Alignments of masonry walls shall be within for bearing walls (ACI 530.1,
122 A
Sec3.3.G.2d

123 Minimum clear distance from anchor bolts or sleeves to edge of concrete C
shall be ……..

The minimum anchor bolt diameter shall be .....................unless specified


by the vendor for small equipment or for the anchorage of small
124 B
miscellaneous items e.g. ladder supports, small piping supports, handrail
anchorage, stair stringers, small platforms etc.

The hot mix asphalt using the conventional bitumen, shall have a
125 A
temperature between …………….. at the time of delivery

At the time of spreading and compaction, the conventional hot mix


126 D
asphalt concrete material all be at least ………….

The entire subgrade shall be compacted to not less than ………..% of the
127 maximum dry density (ASTM D1557) while within 1.5% of the optimum B
moisture content (for cohesive soils)
The entire subgrade shall be compacted to not less than ……..% relative
128 C
density (ASTM D4253/D4254) (for cohensionless soils).

Prime coat is to be applied only when the surface to be treated is dry and
129 D
the atmospheric temperature is or above.

The prime coat shall be applied uniformly to the surface of the base using
130 B
a pressure distributor at a rate between ……….

Measurement of any cores shall not be less than ………….of the design
131 A
thickness, whichever is less.

132 Minimum compressive strength of epoxy grout to be.? B

Core compaction requirements shall be equal to or greater than ……..%


133 of Marshall density (ASTM D-2726/ASTM D1559) using samples taken at B
the road site

Gypsum board corners shall be square with a tolerance of over the full
134 A
width of the board. (1997 UBC, Sec. 2502.14; ASTM 06, sec. 6.2.5)

Wood supports for lath or gypsum board shall not be less than………… in
135 A
least dimension. (1997 UBC, Sec. 2503.2)

136 The maximum particle size of fill material shall be? A


A fill material to be classified, as "select fill" shall contain ………..%
137 C
particles passing thru 20O sieves

138 The primary member use to carry the axial compressive load is? C

139 Density of light weight concrete is? A

140 Intensity of force per unit area is? B

141 Complete record of test of materials and of concrete shall be available B


for inspection after completion of project for ….. Years

142 How dose the Accelerating admixture act in a concrete? C

The admixture can be reJected of the air content found more than ………..
143 B
% in non-air Entrained concrete.

Short chutes, which made by Aluminum can be used to convey concret


144 A
from a truck mix.

145 Retempered concrete can be used after add sufficient water on it. B
Reinforcement partially embedded in concrete can be field bent, it
146 A
shown in IFC drawing or permitted by company engineer.

147 Bundled bar shall be not be enclosed within stirrups or ties. B

Concrete surface to be chipped out minimum of ……………… as the surface


148 B
preparation for grouting.

149 The grout shall be placed in ………… direction to prevent trappng air. B

150 Ceramic tile joint smoothness tolerance? B

Place concrete in layers not to exceed thick and consolidate.(ACl 301,


151 D
Sec. 8.3.1.3)

152 Minimum clear spacing between parallel bar in a layer shall be …? A

Compaction shall begin only after the fill or backfill has been properly
placed and the material to e compacted is at the proper moisture
153 D
content………….of the optimum moisture content per ASTM D1557 or
ASTM D698, whichever is applicable.

What are the things mixed with a cementing __is form a hydraulic
154 A
cement concrete or mortar?
155 ASTM means ??? A

Direct Buried Cable / Conduit Trench - A minimum of dry sand shall be


156 installed from bottom of trench to bottom of cable or conduit (as a C
cushion).

157 The minimum thickness of gusset and stiffener plate should be? A

Maximum total dissolved solids in water used for moist curing shall not
158 B
exceed........

159 What is TDS ? B

160 A beam with a depth of 8 inches requires minimum of …….rows of bolts. A

Minimum Compressive Strength of pre-packaged cement based grout at


161 D
28 days shall be

How many days should a masonry wall be cured prior to grout pouring
162 C
for high lift grouted construction?

As a minimum, 'Select Fill Material' shall be used within of the bottom


163 elevation of fundations, spread footings, or slabs-on-grade when fill is B
required to achieve final grade.
At the time of spreading and compaction, the conventional hot mix
164 D
asphalt concrete material all be at least ………….

Wood supports for lath or gypsum board shall not be less than………… in
165 A
least dimension. (1997 UBC, Sec. 2503.2)

Short chutes, which made by Aluminum can be used to convey concret


166 A
from a truck mix.

Concrete shall be discharged from the mixer within ………..of the mixer
167 D
from the time the mixing water was added. ASTM C-94, Sec. 11.7

168 Adding chemical to the concrete lead to….? A

169 Amount of selected fill material passing ..................sieve shall be 100%. B

The minimum time that a plastic sheet should be in place on concrete


170 surface to determine its moisture content by plastic sheet method, ASTM D
D4263 is

171 Concrete may be allowed to drop freely at a maximum height of? B

The tack coat shall be applied on paved surfaces and vertical surfaces
which will be in contact with the asphalt paving by means of a bitumen
172 B
distributor at a maximum rate of …………….
173 Minimum thickness of cantilever solid slab is……..? D

Allowable concrete temperature during delivery and placement shall be


174 C
maximum.

Method of pre stressing in which tendons are tensioned after concrete


175 A
had hardened is?

176 End lap for metal panels shall not be less than? A

177 The prime coat shall be applied at a temperature C


between ... ... .... .. .............for MC-70

Minimum number of longitudinal in a Compression member shall be


178 C
………..

179 Prime coat shall be applied using a pressure distributor at a rate of? A

The hot mix asphalt using the conventional bitumen, shall have a
180 A
temperature between …………….. at the time of delivery

Gypsum board corners shall be square with a tolerance of over the full
181 A
width of the board. (1997 UBC, Sec. 2502.14; ASTM 06, sec. 6.2.5)
The admixture can be reJected of the air content found more than ………..
182 B
% in non-air Entrained concrete.

183 The minimum concrete slab thickness supported on the ground is B

The labortory California Bearing Ratio (CBR) per ASTM D1883 or AASHTO
184 T-193 for base class material at 100% compaction D1557 shall conform D
to:…………

The minimum bend diameter for No.16 Bar commonly used for stirrups
185 B
and ties shall be ………………..

Fill or backfill placed beneath footings, grade beams, mats, buildings, and
186 process areas shall be compacted to at least …….% of the maximum B
Modified Proctor density as determined by ASTM D1557

187 Reinforcement formed in a cylindrical helix ______? A

188 Fill material retained on 75mm sieve shall be ………%. A

189 The minimum thickness of gusset and stiffener plate should be? A

Fill materials shall be placed in lift or layer not exceeding ………in loose
190 C
depth.
All compaction shall be completed before the temperature of the mix
191 C
falls below ………….

As part of investigation on concrete structure, which one is destructive


192 B
testing...?

193 Using Proper vibrating in concrete as ………. B

The minimum thickness of grout between the foundation and base plates
194 D
shall besteel 1m and Packings to be provided

195 Minimum diameter of anchor bolt using to fixing ladder ….. C

Any excavation or trench with a minimum depth of ……….,the shoring


196 shall be installed or the sides shall be sloped or benched and treated as a B
confined space.

The entire subgrade shall be compacted to not less than ………..% of the
197 maximum dry density (ASTM D1557) while within 1.5% of the optimum B
moisture content (for cohesive soils)

198 The maximum particle size of fill material shall be? A

199 Retempered concrete can be used after add sufficient water on it. B
Fine grout mix proportions shall be …... Part Portland cement …….. Part
200 slaked lime and parts fine aggregates.(ACl 530.1, Sec. 2.6B.1) A
Review
Review

For More Test Purchase

https://qcskills.blogspot.com/
HOME CBT - Exam Result Date: 23-Apr-2020
Total Questions 50 Remarks1% EXAMINAR NAME: *********

Correct Answer 0% CANDIDATE NAME: ********

Wrong & Incomplete 50 FAIL ID,NUMBER: ****


Answered Data
S.No. Test Status
A B C D E
1 Incompleted

2 Incompleted

3 Incompleted

4 Incompleted

5 Incompleted

6 Incompleted

7 Incompleted

8 Incompleted

9 Incompleted

10 Incompleted

11 Incompleted

12 Incompleted

13 Incompleted

14 Incompleted

15 Incompleted

16 Incompleted

17 Incompleted

18 Incompleted

19 Incompleted

20 Incompleted

21 Incompleted

22 Incompleted

23 Incompleted

24 Incompleted

25 Incompleted

26 Incompleted

27 Incompleted

28 Incompleted

29 Incompleted

30 Incompleted

31 Incompleted

32 Incompleted

33 Incompleted

34 Incompleted
HOME CBT - Exam Result Date: 23-Apr-2020
Total Questions 50 Remarks1% EXAMINAR NAME: *********

Correct Answer 0% CANDIDATE NAME: ********

Wrong & Incomplete 50 FAIL ID,NUMBER: ****


Answered Data
S.No. Test Status
A B C D E
35 Incompleted

36 Incompleted

37 Incompleted

38 Incompleted

39 Incompleted

40 Incompleted

41 Incompleted

42 Incompleted

43 Incompleted

44 Incompleted

45 Incompleted

46 Incompleted

47 Incompleted

48 Incompleted

49 Incompleted

50 Incompleted
CBT - COMPUTER BASED TES

RESULT
RESULT

REVIEW
REVIEW

EXAMINAR NAME: *********

CANDIDATE NAME: ********

ID,NUMBER: ****
TER BASED TEST

Q-DATA
Q-DATA

START
START

DATE: 25-Jul-2020

EXAM TITLE: CIVIL Inspector

CHAPTER: 1
TEST-1
TEST-2

TEST-3
TEST-4

TEST-5 [Empty]

TEST-6 [Empty]
HOME CBT - COMPUTER BASED TEST
Review 1 'to' 50 questions number that are Incomplete. (Click the icon t
1 Incompleted 18 Incompleted
2 Incompleted 19 Incompleted
3 Incompleted 20 Incompleted
4 Incompleted 21 Incompleted
5 Incompleted 22 Incompleted
6 Incompleted 23 Incompleted
7 Incompleted 24 Incompleted
8 Incompleted 25 Incompleted
9 Incompleted 26 Incompleted
10 Incompleted 27 Incompleted
11 Incompleted 28 Incompleted
12 Incompleted 29 Incompleted
13 Incompleted 30 Incompleted
14 Incompleted 31 Incompleted
15 Incompleted 32 Incompleted
16 Incompleted 33 Incompleted
17 Incompleted 34 Incompleted
ASED TEST 23-Apr-2020

te. (Click the icon to review Status)


35 Incompleted
36 Incompleted
37 Incompleted
38 Incompleted
39 Incompleted
40 Incompleted
41 Incompleted
42 Incompleted
43 Incompleted
44 Incompleted
45 Incompleted
46 Incompleted
47 Incompleted
48 Incompleted
49 Incompleted
50 Incompleted
End
End
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The minimum concrete slab thickness supported on the

Clear
Clear
Selection
Selection
a. 75mm(3")

b. 100mm(4")

c. 150mm(6")

d. 200mm(8")

e. None of the above

Review
ASED TEST

Saturday, July 25, 2020 1 of 50

pported on the ground is

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Minimum compressive strength of structural concrete a


………
Clear
Clear
Selection
Selection
a. 2500psi

b. 3000psi

c. 4000psi

d. 5000psi

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 2 of 50

ural concrete at 28 days is

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The prime coat for asphalt paving shall be cured minim


than …….. hours.
Clear
Clear
Selection
Selection
a. 24Hours

b. 48Hours

c. 36Hours

d. 12Hours

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 3 of 50

e cured minimum of not less

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Curing of concrete shall be done continuously for at lea

Clear
Clear
Selection
Selection
a. 3

b. 7

c. 14

d. 28

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 4 of 50

ously for at least …….. days

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

No marl fill material shall be retained on . .. ............sieve

Clear
Clear
Selection
Selection
a. 50mm

b. 100mm

c. 75mm

d. 90mm

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 5 of 50

.. ............sieve

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Under foundations with static loads over 320kPa and fo


vibrating or heavy machinery and pavements ….….% of
density as determined by ASTM D1557 for cohesive ma
Clear
Clear
Selection
Selection
a. 90

b. 95

c. 98

d. 100

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 6 of 50

320kPa and foundations for


ents ….….% of the maximum
r cohesive materials.

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Fine grout mix proportions shall be …... Part Portland c


slaked lime and parts fine aggregates.(ACl 530.1, Sec.
Clear
Clear
Selection
Selection
a.   1part cement, 0.1 part slaked lime and 2.25-3.0 parts fine aggr

b. 1part cement, 0.25 part slaked lime and 3.25-3.5 parts fine aggr

c. 1 part cement, 0.27 part slaked lime and 2.25-2.5 parts fine aggr

d. 1 part cement, O. 3part slaked lime and 3.0-3.25 parts fine

e.  1 part cement, 1 part slaked lime and 4.0-6.25 parts fine aggreg

Prev << Review


ASED TEST

Saturday, July 25, 2020 7 of 50

Part Portland cement …….. Part


ACl 530.1, Sec. 2.6B.1)

.0 parts fine aggregates

3.5 parts fine aggregates

2.5 parts fine aggregates

5 parts fine

parts fine aggregates

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Concrete shall be discharged from the mixer within ……


from the time the mixing water was added. ASTM C-94,
Clear
Clear
Selection
Selection
a. 80 minutes or 250 revolutions,

b. 90 minutes or 350 revolutions

c. 100 minutes or 300 revolutions,

d. 90 minutes or 300 revolutions

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 8 of 50

xer within ………..of the mixer


d. ASTM C-94, Sec. 11.7

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Place concrete in layers not to exceed thick and consol


Sec. 8.3.1.3)
Clear
Clear
Selection
Selection
a. 300mm

b. 350mm

c. 400mm

d. 450mm

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 9 of 50

ck and consolidate.(ACl 301,

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The labortory California Bearing Ratio (CBR) per ASTM


AASHTO T-193 for base class material at 100% compac
conform to:…………
Clear
Clear
Selection
Selection
a. 25Min.

b. 50Min

c. 30Min

d. 100Min

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 10 of 50

BR) per ASTM D1883 or


100% compaction D1557 shall

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Testing shall be Conducted at a rate of one test every …


Sub-base
Clear
Clear
Selection
Selection
a. 1000 ft2 (90 m 2)

b. 1500 ft2 (135 m2)

c. 2000 ft2 (180 m2)

d. 500 ft2 (45 m2)

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 11 of 50

ne test every ……. Of base 'or"

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

If application of the surface course is delayed by more t


if dirt, sand, or other impurities have contaminated the
new tack coat shall be applied after the original one has
Clear
Clear
Selection
Selection clean.
a. 24Hours

b. 36Hours

c. 2Days

d. 3Days

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 12 of 50

ayed by more than…………...or


aminated the tack coat, then a
riginal one has been swept

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Gypsum board width shall be 1220mm to 1370mm with


under the specified width. (1997 UBC, Sec. 2502.14; AST
6.2.2)
Clear
Clear
Selection
Selection
a. 2mm

b. 3mm

c. 4mm

d. 5mm

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 13 of 50

1370mm with a tolerance of


c. 2502.14; ASTM C36, Sec.

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

How many days should a masonry wall be cured prior t


for high lift grouted construction?
Clear
Clear
Selection
Selection
a. 8 Days

b. 3 Days

c. 7 Days

d. 14 Days

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 14 of 50

e cured prior to grout pouring

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Light weight aggregate shall have a dry loose weight of

Clear
Clear
Selection
Selection
a. 1150 kg/m³

b. 2000 kg/m³

c. 1120 kg/m³

d. 1080 kg/m³

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 15 of 50

oose weight of ……….. or less

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Reinforcement bar used to resist shear and Torsion Str


structural member is?
Clear
Clear
Selection
Selection
a. Main bar

b. Distribution bar

c. Stirrup

d. Diagnose bar

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 16 of 50

nd Torsion Stresses in a

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Adding chemical to the concrete lead to….?

Clear
Clear
Selection
Selection
a. Reduce Slump

b. Reduce workability

c. Increase Slump

d. Reduce initial setting time

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 17 of 50

….?

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Minimum clear spacing between parallel bar in a layer s

Clear
Clear
Selection
Selection
a. 25mm

b. 40mm

c. 20mm

d. 50mm

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 18 of 50

bar in a layer shall be …?

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The minimum bend diameter for No.16 Bar commonly u


and ties shall be ………………..
Clear
Clear
Selection
Selection
a. 2 db

b. 4 db

c. 6 db

d. 12 db

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 19 of 50

ar commonly used for stirrups

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Enlarging of bolt hole can be made by buring, gouging

Clear
Clear
Selection
Selection
a. True.

b. False.

c. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 20 of 50

ring, gouging or dift punching

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The minimum time that a plastic sheet should be in plac


surface to determine its moisture content by plastic she
ASTM D4263 is
Clear
Clear
Selection
Selection
a. 10 hours

b. 16 hours

c. 15 hours

d. 24 hours

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 21 of 50

ould be in place on concrete


by plastic sheet method,

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

End of Vibration to be covered with as coate bar used in

Clear
Clear
Selection
Selection
a. Rubber or Non metalic

b. Plastic

c. Metal Cladding

d. Galvanized Sheet

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 22 of 50

ate bar used in concrete.

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Dune sand or clean sand used, as fill material requires


cohesive material, 150mm thick to 300mm thick.
Clear
Clear
Selection
Selection
a. True.

b. False.

c. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 23 of 50

erial requires a cap layer of


m thick.

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Base and sub base of asphalt paving shall be compacte


…… %.respectively of the maximum laboratory density.
Clear
Clear
Selection
Selection
a. 100 and 95

b. 98 and 95

c. 95 and85

d. 95 and 70

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 24 of 50

ll be compacted to …… and
ratory density.

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

ACI means,

Clear
Clear
Selection
Selection
a. American Concrete Institute

b. American Civil Institute

c. American Concrete Instruction

d. American Concrete Inspection guide

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 25 of 50

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Amount of selected fill material passing ..................sieve

Clear
Clear
Selection
Selection
a. 100mm

b. 50mm

c. 75mm

d. 150mm

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 26 of 50

................sieve shall be 100%.

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Compaction shall begin only after the fill or backfill has


placed and the material to e compacted is at the proper
content………….of the optimum moisture content per A
Clear
Clear
Selection
Selection ASTM D698, whichever is applicable.
a.   +1.5%,

b.   +2.0%,

c.   +2.5%,

d.   ,± 3.0%

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 27 of 50

or backfill has been properly


s at the proper moisture
content per ASTM D1557 or

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Fill or backfill placed beneath footings, grade beams, m


and process areas shall be compacted to at least …….%
maximum Modified Proctor density as determined by A
Clear
Clear
Selection
Selection
a. 85

b. 90

c. 95

d. 98

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 28 of 50

ade beams, mats, buildings,


at least …….% of the
termined by ASTM D1557

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

When the extent of damaged coating exceeds _____ %


area of the coated steel reinforcing bar in any 0.3m (1-ft
coated bar should be rejected. (ASTM A775, Sec. )<1.3.8
Clear
Clear
Selection
Selection
a. 1

b. 2

c. 3

d. 5

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 29 of 50

eeds _____ % of the surface


any 0.3m (1-ft) length, the
75, Sec. )<1.3.8)

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Concrete shall not be dropped freely where reinforcing


segregation nor where it would fall freely for more than
Clear
Clear
Selection
Selection
a. 0.9m

b. 1.0m

c. 1.2m

d. 1.5m

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 30 of 50

re reinforcing will cause


for more than ……………..

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The labortory California Bearing Ratio (CBR) per ASTM


AASHTO T-193 for sub base class "A" material at 95% c
D1557 shall conform to
Clear
Clear
Selection
Selection
a. 25Min.

b. 50Min

c. 30Min

d. 100Min

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 31 of 50

BR) per ASTM D1883 or


aterial at 95% compaction

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The rolling shall continue until the base materials are co


less than ……..% of the maximum laboratory dry densit
1557 or AASHTO T-180) for the full layer depth
Clear
Clear
Selection
Selection
a. 90

b. 95

c. 98

d. 100

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 32 of 50

materials are compacted to no


ory dry density (per ASTM D-
depth

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Tack coats shall not be placed during rain, on a moist s


air or surface temperature is below ………….
Clear
Clear
Selection
Selection
a. 12Deg C

b. 4Deg C

c. 10Deg C

d. 16Deg C

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 33 of 50

n, on a moist surface when the


…….

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Direct Buried Cable / Conduit Trench - A minimum of …


cover shall be installed on top of the cable or conduit (a
Clear
Clear
Selection
Selection
a. 150mm

b. 200mm

c. 250mm

d. 300mm

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 34 of 50

minimum of ……….. dry sand


e or conduit (as a cushion).

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The minimum time that a plastic sheet should be in plac


surface to determine its moisture content by plastic she
ASTM D4263 is
Clear
Clear
Selection
Selection
a. 10Hours

b. 24Hours

c. 5Hours

d. 16Hours

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 35 of 50

ould be in place on concrete


by plastic sheet method,

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

What are the things mixed with a cementing __is form a


cement concrete or mortar?
Clear
Clear
Selection
Selection
a. Sand, gravel ,crashed stone, Blast furnace slag

b. Sand, Blast furnace slag

c. Blast furnace slag, Water

d. Blast furnace slag, Retarders

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 36 of 50

ng __is form a hydraulic

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Reinforcement formed in a cylindrical helix ______?

Clear
Clear
Selection
Selection
a. Spiral Reinforcement

b. Lateral Reinforcement

c. Diagonal Reinforcement

d. Flexural Reinforcement

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 37 of 50

ix ______?

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Deformed Reinforcement shall be conform to…?

Clear
Clear
Selection
Selection
a. ASTM - A-608m

b. ASTM - A-615m

c. ASTM - A-620m

d. ASTM - A-720m

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 38 of 50

m to…?

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The avarage strength of 3 core is equal to ………………

Clear
Clear
Selection
Selection
a. 90

b. 85

c. 70

d. 98

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 39 of 50

o ……………… %

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Construction joints in floor shall be located in the ………


slabs, beams & girders.
Clear
Clear
Selection
Selection
a. ½ of span

b. Middle third of span

c. ¼ of span

d. ¾ of span

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 40 of 50

ed in the ………… of span to

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The structural steel members, the bolts shall be tighten


tight condition.
Clear
Clear
Selection
Selection
a. True.

b. False.

c. None of the above

Prev << Review


1
ASED TEST

Saturday, July 25, 2020 41 of 50

hall be tightened to a SnUg –

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

   Is the hot dipped galvanized steel may be embedded i

Clear
Clear
Selection
Selection
a. Yes

b. No

c. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 42 of 50

be embedded in concrete?

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Free draining soils or cohesion less material shall be co


……….% relative density
Clear
Clear
Selection
Selection
a. 70

b. 75

c. 90

d. 95

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 43 of 50

rial shall be compacted to

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Concrete may be allowed to drop freely at a maximum h

Clear
Clear
Selection
Selection
a. 0.5m

b. 1m

c. 3m

d. 2m

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 44 of 50

t a maximum height of?

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

ASTM means ???

Clear
Clear
Selection
Selection
a. American Society for Testing & Materials

b. American Society for Testing & Minerals

c. American Society of Testing & Minerals

d. American Society of Testing & Materials

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 45 of 50

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Fill material retained on 75mm sieve shall be ………%.

Clear
Clear
Selection
Selection
a. [0]

b. 15

c. 35

d. 5

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 46 of 50

be ………%.

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Fill material shall be placed in lifts not exceeding in loo


hand-operated compaction.
Clear
Clear
Selection
Selection
a. 200mm

b. 150mm

c. 100mm

d. 75mm

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 47 of 50

ceeding in loose depth for

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The bottom of pipes in the trenches shall be above ……


highest recorded ground water level
Clear
Clear
Selection
Selection
a. 100mm

b. 120mm

c. 150mm

d. 200mm

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 48 of 50

be above …………of the

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

The concrete specimens shall be subjected for final cur


water maintained on their surfaces at all times at a temp
(ASTM C94/ASTM C-31 sec. 10.1.3)
Clear
Clear
Selection
Selection
a. 20 Deg.C±2 Deg.C

b.   23 Deg.C±2 Deg.C

c. 25 Deg.C±2 Deg.C

d. 28 Deg.C±2 Deg.C

e. None of the above

Prev << Review


ASED TEST

Saturday, July 25, 2020 49 of 50

ed for final curing with free


imes at a temperature of

>> Next
1
CBT - COMPUTER BASED TEST

CIVIL Inspector Date: Saturday, July 25, 20

Water curing shall be continuous until the compressive


reached 70% of the specified strength, but not less than
Clear
Clear
Selection
Selection
a. 7days

b. 10days

c. 14days

d. 28days

e. None of the above

Prev << Review End


End
ASED TEST

Saturday, July 25, 2020 50 of 50

e compressive strength has


ut not less than ………….

End
End
C
l
i
c
k

t
o

M
o
v
e

N
e
x
t

Q
u
e
s
t
i
o
n
HOME CBT - COMPUTER BASED TEST

Thank
Thank You.
You
BASED TEST Date: 23-Apr-2020

k You...
You...

You might also like