The prime coat for asphalt paving shall be cured minimum of not less
3 A
than …….. hours.
Under foundations with static loads over 320kPa and foundations for
6 vibrating or heavy machinery and pavements ….….% of the maximum B
density as determined by ASTM D1557 for cohesive materials.
Fine grout mix proportions shall be …... Part Portland cement …….. Part
7 slaked lime and parts fine aggregates.(ACl 530.1, Sec. 2.6B.1) A
Concrete shall be discharged from the mixer within ………..of the mixer
8 D
from the time the mixing water was added. ASTM C-94, Sec. 11.7
The labortory California Bearing Ratio (CBR) per ASTM D1883 or AASHTO
10 T-193 for base class material at 100% compaction D1557 shall conform D
to:…………
Testing shall be Conducted at a rate of one test every ……. Of base 'or"
11 C
Sub-base
How many days should a masonry wall be cured prior to grout pouring
14 C
for high lift grouted construction?
15 Light weight aggregate shall have a dry loose weight of ……….. or less C
The minimum bend diameter for No.16 Bar commonly used for stirrups
19 B
and ties shall be ………………..
20 Enlarging of bolt hole can be made by buring, gouging or dift punching B
Dune sand or clean sand used, as fill material requires a cap layer of
23 A
cohesive material, 150mm thick to 300mm thick.
25 ACI means, A
Compaction shall begin only after the fill or backfill has been properly
placed and the material to e compacted is at the proper moisture
27 D
content………….of the optimum moisture content per ASTM D1557 or
ASTM D698, whichever is applicable.
Fill or backfill placed beneath footings, grade beams, mats, buildings, and
28 process areas shall be compacted to at least …….% of the maximum B
Modified Proctor density as determined by ASTM D1557
When the extent of damaged coating exceeds _____ % of the surface
29 area of the coated steel reinforcing bar in any 0.3m (1-ft) length, the B
coated bar should be rejected. (ASTM A775, Sec. )<1.3.8)
The labortory California Bearing Ratio (CBR) per ASTM D1883 or AASHTO
31 T-193 for sub base class "A" material at 95% compaction D1557 shall A
conform to
The rolling shall continue until the base materials are compacted to no
32 less than ……..% of the maximum laboratory dry density (per ASTM D- C
1557 or AASHTO T-180) for the full layer depth
33 Tack coats shall not be placed during rain, on a moist surface when the D
air or surface temperature is below ………….
What are the things mixed with a cementing __is form a hydraulic
36 A
cement concrete or mortar?
The bottom of pipes in the trenches shall be above …………of the highest
48 D
recorded ground water level
The concrete specimens shall be subjected for final curing with free
49 water maintained on their surfaces at all times at a temperature of B
(ASTM C94/ASTM C-31 sec. 10.1.3)
The rolling shall continue until the subbase is compacted to no less than
52 ………% of the maximum laboratory dry density (per ASTM D-1557 or B
AASHTO T-180) for the full layer depth
The tack coat shall be applied on paved surfaces and vertical surfaces
which will be in contact with the asphalt paving by means of a bitumen
53 B
distributor at a maximum rate of …………….
60 Concrete cover for pipes, conduits shall not be less than ……. For concrete C
exposed to earth or weather.
Fill materials shall be placed in lift or layer not exceeding ………in loose
64 C
depth.
65 Rakes and vibrators may be used to move concrete after placement B
Mixing water for concrete shall not contain more than …….. of total
66 A
dissolve solid.
68 Fill material shall be placed in lifts not exceeding ………… in loose depth. B
The pipe shall be embedded in clean sand not less than above the top of
70 D
the pipe.
Maximum total dissolved solids in water used for moist curing shall not
72 B
exceed........
81 What is TDS ? B
The final finished right of way shall be at least …...meters wide and
93 B
…………. meters in Sabkha areas.
Temperature test shall be made with a frequency of not less than one
94 test for every of concrete on each day, or 1 test each day for each class C
of concrete delivered. (ASTM C94-04, Sec. 16.5)
The hot mix asphalt concrete shall be placed only when the air
96 temperature is above ………………. and it is not foggy, rainy and the C
existing surface is free of moisture.
The minimum thickness of grout between the foundation and base plates
100 D
shall besteel 1m and Packings to be provided
Fill materials shall be placed in lift or layer not exceeding ………...in loose
101 B
depth.
As per ACI 318M sec. 5.6.1.1 , sample grouting shall be taken not less
104 B
than once a day or less than ……… m³ of concrete.
For Cast-in-place concrete size of spirals shall not be less than …..
106 C
Dimeter.
How many days should a masonry wall be cured prior to grout pouring
108 C
for high lift grouted construction?
Asphalt mix can be placed & compacted if the temperature is not less
113 A
than 139 degrees centigrade.
116 Prime coat shall be applied using a pressure distributor at a rate of? A
The depth of the test holes for nuclear method shall be no greater than
120 D
deep. (ASTM D 2922…SEC 1.1)
Coarse grout mix proportions shall be: …...part Portland cement; …….part
121 A
slaked lime; …….. parts coarse aggregates. (ACI 530.1, Sec. 2.6B.1)
Alignments of masonry walls shall be within for bearing walls (ACI 530.1,
122 A
Sec3.3.G.2d
123 Minimum clear distance from anchor bolts or sleeves to edge of concrete C
shall be ……..
The hot mix asphalt using the conventional bitumen, shall have a
125 A
temperature between …………….. at the time of delivery
The entire subgrade shall be compacted to not less than ………..% of the
127 maximum dry density (ASTM D1557) while within 1.5% of the optimum B
moisture content (for cohesive soils)
The entire subgrade shall be compacted to not less than ……..% relative
128 C
density (ASTM D4253/D4254) (for cohensionless soils).
Prime coat is to be applied only when the surface to be treated is dry and
129 D
the atmospheric temperature is or above.
The prime coat shall be applied uniformly to the surface of the base using
130 B
a pressure distributor at a rate between ……….
Measurement of any cores shall not be less than ………….of the design
131 A
thickness, whichever is less.
Gypsum board corners shall be square with a tolerance of over the full
134 A
width of the board. (1997 UBC, Sec. 2502.14; ASTM 06, sec. 6.2.5)
Wood supports for lath or gypsum board shall not be less than………… in
135 A
least dimension. (1997 UBC, Sec. 2503.2)
138 The primary member use to carry the axial compressive load is? C
The admixture can be reJected of the air content found more than ………..
143 B
% in non-air Entrained concrete.
145 Retempered concrete can be used after add sufficient water on it. B
Reinforcement partially embedded in concrete can be field bent, it
146 A
shown in IFC drawing or permitted by company engineer.
149 The grout shall be placed in ………… direction to prevent trappng air. B
Compaction shall begin only after the fill or backfill has been properly
placed and the material to e compacted is at the proper moisture
153 D
content………….of the optimum moisture content per ASTM D1557 or
ASTM D698, whichever is applicable.
What are the things mixed with a cementing __is form a hydraulic
154 A
cement concrete or mortar?
155 ASTM means ??? A
157 The minimum thickness of gusset and stiffener plate should be? A
Maximum total dissolved solids in water used for moist curing shall not
158 B
exceed........
How many days should a masonry wall be cured prior to grout pouring
162 C
for high lift grouted construction?
Wood supports for lath or gypsum board shall not be less than………… in
165 A
least dimension. (1997 UBC, Sec. 2503.2)
Concrete shall be discharged from the mixer within ………..of the mixer
167 D
from the time the mixing water was added. ASTM C-94, Sec. 11.7
The tack coat shall be applied on paved surfaces and vertical surfaces
which will be in contact with the asphalt paving by means of a bitumen
172 B
distributor at a maximum rate of …………….
173 Minimum thickness of cantilever solid slab is……..? D
176 End lap for metal panels shall not be less than? A
179 Prime coat shall be applied using a pressure distributor at a rate of? A
The hot mix asphalt using the conventional bitumen, shall have a
180 A
temperature between …………….. at the time of delivery
Gypsum board corners shall be square with a tolerance of over the full
181 A
width of the board. (1997 UBC, Sec. 2502.14; ASTM 06, sec. 6.2.5)
The admixture can be reJected of the air content found more than ………..
182 B
% in non-air Entrained concrete.
The labortory California Bearing Ratio (CBR) per ASTM D1883 or AASHTO
184 T-193 for base class material at 100% compaction D1557 shall conform D
to:…………
The minimum bend diameter for No.16 Bar commonly used for stirrups
185 B
and ties shall be ………………..
Fill or backfill placed beneath footings, grade beams, mats, buildings, and
186 process areas shall be compacted to at least …….% of the maximum B
Modified Proctor density as determined by ASTM D1557
189 The minimum thickness of gusset and stiffener plate should be? A
Fill materials shall be placed in lift or layer not exceeding ………in loose
190 C
depth.
All compaction shall be completed before the temperature of the mix
191 C
falls below ………….
The minimum thickness of grout between the foundation and base plates
194 D
shall besteel 1m and Packings to be provided
The entire subgrade shall be compacted to not less than ………..% of the
197 maximum dry density (ASTM D1557) while within 1.5% of the optimum B
moisture content (for cohesive soils)
199 Retempered concrete can be used after add sufficient water on it. B
Fine grout mix proportions shall be …... Part Portland cement …….. Part
200 slaked lime and parts fine aggregates.(ACl 530.1, Sec. 2.6B.1) A
Review
Review
https://qcskills.blogspot.com/
HOME CBT - Exam Result Date: 23-Apr-2020
Total Questions 50 Remarks1% EXAMINAR NAME: *********
2 Incompleted
3 Incompleted
4 Incompleted
5 Incompleted
6 Incompleted
7 Incompleted
8 Incompleted
9 Incompleted
10 Incompleted
11 Incompleted
12 Incompleted
13 Incompleted
14 Incompleted
15 Incompleted
16 Incompleted
17 Incompleted
18 Incompleted
19 Incompleted
20 Incompleted
21 Incompleted
22 Incompleted
23 Incompleted
24 Incompleted
25 Incompleted
26 Incompleted
27 Incompleted
28 Incompleted
29 Incompleted
30 Incompleted
31 Incompleted
32 Incompleted
33 Incompleted
34 Incompleted
HOME CBT - Exam Result Date: 23-Apr-2020
Total Questions 50 Remarks1% EXAMINAR NAME: *********
36 Incompleted
37 Incompleted
38 Incompleted
39 Incompleted
40 Incompleted
41 Incompleted
42 Incompleted
43 Incompleted
44 Incompleted
45 Incompleted
46 Incompleted
47 Incompleted
48 Incompleted
49 Incompleted
50 Incompleted
CBT - COMPUTER BASED TES
RESULT
RESULT
REVIEW
REVIEW
ID,NUMBER: ****
TER BASED TEST
Q-DATA
Q-DATA
START
START
DATE: 25-Jul-2020
CHAPTER: 1
TEST-1
TEST-2
TEST-3
TEST-4
TEST-5 [Empty]
TEST-6 [Empty]
HOME CBT - COMPUTER BASED TEST
Review 1 'to' 50 questions number that are Incomplete. (Click the icon t
1 Incompleted 18 Incompleted
2 Incompleted 19 Incompleted
3 Incompleted 20 Incompleted
4 Incompleted 21 Incompleted
5 Incompleted 22 Incompleted
6 Incompleted 23 Incompleted
7 Incompleted 24 Incompleted
8 Incompleted 25 Incompleted
9 Incompleted 26 Incompleted
10 Incompleted 27 Incompleted
11 Incompleted 28 Incompleted
12 Incompleted 29 Incompleted
13 Incompleted 30 Incompleted
14 Incompleted 31 Incompleted
15 Incompleted 32 Incompleted
16 Incompleted 33 Incompleted
17 Incompleted 34 Incompleted
ASED TEST 23-Apr-2020
Clear
Clear
Selection
Selection
a. 75mm(3")
b. 100mm(4")
c. 150mm(6")
d. 200mm(8")
Review
ASED TEST
>> Next
1
CBT - COMPUTER BASED TEST
b. 3000psi
c. 4000psi
d. 5000psi
>> Next
1
CBT - COMPUTER BASED TEST
b. 48Hours
c. 36Hours
d. 12Hours
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. 3
b. 7
c. 14
d. 28
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. 50mm
b. 100mm
c. 75mm
d. 90mm
.. ............sieve
>> Next
1
CBT - COMPUTER BASED TEST
b. 95
c. 98
d. 100
>> Next
1
CBT - COMPUTER BASED TEST
b. 1part cement, 0.25 part slaked lime and 3.25-3.5 parts fine aggr
c. 1 part cement, 0.27 part slaked lime and 2.25-2.5 parts fine aggr
e. 1 part cement, 1 part slaked lime and 4.0-6.25 parts fine aggreg
5 parts fine
>> Next
1
CBT - COMPUTER BASED TEST
>> Next
1
CBT - COMPUTER BASED TEST
b. 350mm
c. 400mm
d. 450mm
>> Next
1
CBT - COMPUTER BASED TEST
b. 50Min
c. 30Min
d. 100Min
>> Next
1
CBT - COMPUTER BASED TEST
>> Next
1
CBT - COMPUTER BASED TEST
b. 36Hours
c. 2Days
d. 3Days
>> Next
1
CBT - COMPUTER BASED TEST
b. 3mm
c. 4mm
d. 5mm
>> Next
1
CBT - COMPUTER BASED TEST
b. 3 Days
c. 7 Days
d. 14 Days
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. 1150 kg/m³
b. 2000 kg/m³
c. 1120 kg/m³
d. 1080 kg/m³
>> Next
1
CBT - COMPUTER BASED TEST
b. Distribution bar
c. Stirrup
d. Diagnose bar
nd Torsion Stresses in a
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. Reduce Slump
b. Reduce workability
c. Increase Slump
….?
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. 25mm
b. 40mm
c. 20mm
d. 50mm
>> Next
1
CBT - COMPUTER BASED TEST
b. 4 db
c. 6 db
d. 12 db
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. True.
b. False.
>> Next
1
CBT - COMPUTER BASED TEST
b. 16 hours
c. 15 hours
d. 24 hours
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. Rubber or Non metalic
b. Plastic
c. Metal Cladding
d. Galvanized Sheet
>> Next
1
CBT - COMPUTER BASED TEST
b. False.
>> Next
1
CBT - COMPUTER BASED TEST
b. 98 and 95
c. 95 and85
d. 95 and 70
ll be compacted to …… and
ratory density.
>> Next
1
CBT - COMPUTER BASED TEST
ACI means,
Clear
Clear
Selection
Selection
a. American Concrete Institute
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. 100mm
b. 50mm
c. 75mm
d. 150mm
>> Next
1
CBT - COMPUTER BASED TEST
b. +2.0%,
c. +2.5%,
d. ,± 3.0%
>> Next
1
CBT - COMPUTER BASED TEST
b. 90
c. 95
d. 98
>> Next
1
CBT - COMPUTER BASED TEST
b. 2
c. 3
d. 5
>> Next
1
CBT - COMPUTER BASED TEST
b. 1.0m
c. 1.2m
d. 1.5m
>> Next
1
CBT - COMPUTER BASED TEST
b. 50Min
c. 30Min
d. 100Min
>> Next
1
CBT - COMPUTER BASED TEST
b. 95
c. 98
d. 100
>> Next
1
CBT - COMPUTER BASED TEST
b. 4Deg C
c. 10Deg C
d. 16Deg C
>> Next
1
CBT - COMPUTER BASED TEST
b. 200mm
c. 250mm
d. 300mm
>> Next
1
CBT - COMPUTER BASED TEST
b. 24Hours
c. 5Hours
d. 16Hours
>> Next
1
CBT - COMPUTER BASED TEST
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. Spiral Reinforcement
b. Lateral Reinforcement
c. Diagonal Reinforcement
d. Flexural Reinforcement
ix ______?
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. ASTM - A-608m
b. ASTM - A-615m
c. ASTM - A-620m
d. ASTM - A-720m
m to…?
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. 90
b. 85
c. 70
d. 98
o ……………… %
>> Next
1
CBT - COMPUTER BASED TEST
c. ¼ of span
d. ¾ of span
>> Next
1
CBT - COMPUTER BASED TEST
b. False.
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. Yes
b. No
be embedded in concrete?
>> Next
1
CBT - COMPUTER BASED TEST
b. 75
c. 90
d. 95
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. 0.5m
b. 1m
c. 3m
d. 2m
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. American Society for Testing & Materials
>> Next
1
CBT - COMPUTER BASED TEST
Clear
Clear
Selection
Selection
a. [0]
b. 15
c. 35
d. 5
be ………%.
>> Next
1
CBT - COMPUTER BASED TEST
b. 150mm
c. 100mm
d. 75mm
>> Next
1
CBT - COMPUTER BASED TEST
b. 120mm
c. 150mm
d. 200mm
>> Next
1
CBT - COMPUTER BASED TEST
b. 23 Deg.C±2 Deg.C
c. 25 Deg.C±2 Deg.C
d. 28 Deg.C±2 Deg.C
>> Next
1
CBT - COMPUTER BASED TEST
b. 10days
c. 14days
d. 28days
End
End
C
l
i
c
k
t
o
M
o
v
e
N
e
x
t
Q
u
e
s
t
i
o
n
HOME CBT - COMPUTER BASED TEST
Thank
Thank You.
You
BASED TEST Date: 23-Apr-2020
k You...
You...