Vendor PT. Weebz Mandiri-Turbine Flowmeter-130123
Vendor PT. Weebz Mandiri-Turbine Flowmeter-130123
of Turbine Flowmeter
(13 January 2023)
(Vendor could add content based on the template. But any additional
11 CERTIFICATE OF 28-Feb-23
ORIGIN (COO)
12 CALIBRATION 28-Feb-23
CERTIFICATE
13 HYDROTEST 28-Feb-23
CERTIFICATE
14 HYDROTEST 28-Feb-23
REPORT
17 POSITIVE 28-Feb-23
MATERIAL
IDENTIFICATION
(PMI) TEST
18 HANDLING Rev. A (IFR) Rev. A (IFR) Rev. 0 Rev. 0 Doc has been
PROCEDURE 28-Sept-22 28-Sept-22 (IFC) (IFC) approved
Rev. B (IFA) Rev. B (IFA) 13-Nov- 14-
19-Oct-22 19-Oct-22 22 Nov-22
Rev. 0 (IFC) Rev. 0 (IFC)
03-Nov-22 03-Nov-22
19 MDR INDEX Rev. A (IFR) Rev. A (IFR) Rev. 0 Rev. 0 Doc has been
19-Oct-22 19-Oct-22 (IFC) (IFC) approved
Rev. B (IFA) Rev. B (IFA) 26-Nov- 04-Dec-
03-Nov-22 03-Nov-22 22 22
Rev. 0 (IFC) Rev. 0 (IFC)
13-Nov-22 16-Nov-22
20 VDRL List Rev. A (IFR) Rev. A (IFR) Rev. 1 Rev. 1 Doc has been
22-Sep-22 22-Sep-22 (Re-IFC) (Re-IFC) approved
Rev. B (IFA) Rev. B (IFA) 4-Dec- 4-Dec-
19-Oct-22 19-Oct-22 22 22
Rev. 0 (IFC) Rev. 0 (IFC)
03-Nov-22 03-Nov-22
Rev. 1 (Re- Rev. 1 (Re-
IFC) IFC)
24-Nov-22 24-Nov-22
Summary of status:
(All the VDRs required in MR should be listed in the table above)
(if any delay or any impact on delivery schedule, write the issue here and give
explanation)
(if the VDR plan has not been submitted, leave the date columns blank)
3. Monthly progress (Vendor could use own format in this part (number,
description, chart, or any method to show the progress), but the basic information
as below need to be followed)
Monthly progress:
Accumulated progress:
Delay already confirmed: (if has, the reason, impact and mitigation plan need to be
listed)
4. Inspection status
5. Delivery status