You are on page 1of 1

TN PN 1:2

Fill Slope

TN PN 120
126

120
Sewage Treatment for Smelter Building

120 8000m3
Fire Rescue Building
Initial rain water pool

Ore yard rain water pool Latter rain water pool


126
50000m 3
18000m 3 Backwater (Re-used) system

126 Cooling tower

Oxygen station

Toilet

Electrical distribution station for smelting


Diesel generator room Cooling tower
Muster Area
Fill Slope

Cooling tower for equipment Cooling tower for furnace(RKEF) Cooling tower for slag

Reserve for off-gas desulfurization

Coal storage Proportioning station and Circulating water pump house for RKEF smelting anddemineralized water station
dust pelletizing plant Circulating water

Feed belt gallery for drying

Main drying plant

Roasting and reduction plant

2
16500 m

Dryer offgas
cleaning system Circulating water
005 干矿及辅料堆场(三期建设范围)
DRIED ORE AND ADDITIVES STORAGE YARD
( CONSTRUCTION SCOPE OF PHASE III )
Dryer offgas Circulating water
cleaning system

Circulating water system for Ni/Fe granulation


Roasting and reduction plant
005 干矿及辅料堆场
005 DRIED ORE AND ADDITIVES STORAGE YARD

Main drying plant


FEED BELT GALLERY FOR DRYING

COAL HOMOGENIZATION STOREROOM

Proportioning station and Circulating water


dust pelletizing plant Electric furnace smelting plant

Cooling tower for shotting( slag granulation)


Cooling tower for furnace(RKEF) Cooling tower for furnace(RKEF)
Cooling tower for slag Cooling tower for equipment Cooling tower for slag
Electrical distribution station for smelting
COAL HOMOGENIZATION STOREROOM
Pulverized coal preparation plant Air compressor station Electrical distribution station for smelting
Diesel generator room Cooling tower for equipment

Circulating water pump house for RKEF Diesel generator room Circulating water pump house for RKEF
smelting and demineralized water station smelting and demineralized water station Toilet

ORE STOCKPILE AND TRANSFERRING STATION 32000m


2
Cut Slope

Central control room


Pulverized coal preparation plant
Bathroom Parking area
Product storage
Toilet
Maintenance Workshop
Comprehensive warehouse
Laboratory
Diesel room

Vegetation dust control area Personnel Entrance


Weighbridge Muster Area
Vegetation dust control area Cut Slope
Canteen
Pulverized coal preparation plant

WEIGHBRIDGE
Office Building Parking area

INTERCEPTING DITCH

This path can be used to connect the parking area to the external road
Exte
rnal
TO WHARF cont
act Vegetation dust control area
road

TO
SLAG
YARD

You might also like