Professional Documents
Culture Documents
Revision 1
1 NP Factory, Ltd.
2 Factory floor
6 Nathan Pocock
7 https://our.intranet/path/to/document.docx
I-ISMS Implementation
Industrial Information Security
Revision 1 (38)
Management System
1 Continuous Improvement
2 INTERNAL
NP Factory, Ltd.
[Company Address]
Factory floor
I-ISMS Implementation
704-491-5840
Manager Pocock
1 Executive Summary
2 A checklist for conducting an internal audit to determine compliance with the I-ISMS policy
3 Revision History
1 Contents
2 1 Instructions 2
3 2 Statement of Applicability 2
6 Figures
2 Instructions
1 The statement of applicability is a mapping between the security policies defined in the 01 - IISMS-
2 CompanyPolicy.docx and how they have been executed to comply with the requirements. This version of SoA
3 is simplified by reducing any need to map with regulations or other standards.
5 1. Review the table defined in Error: Reference source not foundError: Reference source not found.
6 2. Complete all actions marked as TODO or PARTIAL.
7 3. Add, edit, or remove rows/sections as necessary.
8 4. Press CTRL+A and then hit F9 to update the document references and page numbering.
10
3 Scope
2 Physical environment
3 Computer systems
4 Network infrastructure
5 Industrial machinery and devices connected to the network
6 Personnel
4 Audit Checklist
1 Please update the table below as you make progress through the implementation.
I-ISMS: RESPONSIBILITIES
2 Principal engineer recognized, documented, and identified in necessary documents, e.g. BCP Annu Hi
al g
h
2 I-ISMS team(s) created and documented, e.g. BCP. Annu Hi
al g
h
2 Review process for reporting cyber-security issues/weaknesses; verify is known by employees Annu Hi
al g
h
2 Review process for visitor/contractor training process for reporting cyber-security Annu Hi
issues/weaknesses al g
h
2 Review document security to assure authorized modification only Annu M
al e
d
PHYSICAL SECURITY
7 Verify the factory floor perimeter is physically secured to prevent unauthorized entry (doors, Annu Hi
windows) al g
h
7 Verify all factory-floor office spaces are physically secured to prevent unauthorized entry Annu Hi
al g
h
7 Verify all lockable cabinets, cages, drawers, panels, and boxes etc. are all locked Annu Hi
al g
h
7 Review the anchoring of all equipment and computing equipment Annu M
al e
d
CONFIGURATION MANAGEMENT
16 Verify the change management review board behavior of regular meetings and activities Annu Hi
al g
h
16 Review the documentation of working group minutes and decisions Annu M
al e