Project and Location: 65 MW Noor Laayoune Solar PV Project at Laayoune

This document outlines the quality plan for the transmission line superstructure of the 65 MW Noor Laayoune Solar PV Project in Laayoune, Morocco. It details the inspection procedures, frequencies, acceptance criteria and responsibilities at each stage of the project, including: 1) Document checking and materials review prior to execution. 2) Visual inspection and measurement of steel structure assembly, bolt tightening torque, and verticality/orientation at a frequency of 100%. 3) Testing of bolt tightening torque according to ISO 1461 standards. 4) Final visual inspection and acceptance of the completed work.

Uploaded by

Oussama Bourim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views1 page

Project and Location: 65 MW Noor Laayoune Solar PV Project at Laayoune

This document outlines the quality plan for the transmission line superstructure of the 65 MW Noor Laayoune Solar PV Project in Laayoune, Morocco. It details the inspection procedures, frequencies, acceptance criteria and responsibilities at each stage of the project, including: 1) Document checking and materials review prior to execution. 2) Visual inspection and measurement of steel structure assembly, bolt tightening torque, and verticality/orientation at a frequency of 100%. 3) Testing of bolt tightening torque according to ISO 1461 standards. 4) Final visual inspection and acceptance of the completed work.

Uploaded by

Oussama Bourim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

FIELD QUALITY PLAN Document: SW-LYN-FQP-TLS-016

SUBJECT: Transmission Line SuperStructure Rev: 0

PROJECT AND LOCATION: 65 MW NOOR LAAYOUNE SOLAR PV PROJECT AT LAAYOUNE Date: 01/01/2018

SUB-CONTRACTOR STERLING AND WILSON ACWA THIRD PARTY


Quality
No. Operation descriptions Method Inspection Frequency Acceptance criteria
Document Inspection Inspection Inspection
Resp Inspection Point Signature Resp Signature Resp Signature Resp Signature
Point Point Point

1 PREVIOUS CONTROL

Approved Drawing.
Technical Specification. All relevant Quality QA/ QC QA/ QC
1.1 Documents checking Review 100% R R R NA
Method Statment. documents. Engineer Engineer Engineer
Calibration Report of the measuring equipments.

2 Materials

Supplier Approval.
Quality QA/ QC QA/ QC
2.1 Steel Structure Review 100% Technical Specifications. MRI R R R NA
Engineer Engineer Engineer
Material Desptch Clearance Certificate MDCC.

Supplier Approval.
Quality QA/ QC QA/ QC
2.2 Bolts, Nuts and Washers Review 100% Technical Specifications. MRI R R R NA
Engineer Engineer Engineer
Material Desptch Clearance Certificate MDCC.

3 EXECUTION

Approved Drawing .
Quality QA/ QC QA/ QC
3.1 Steel Structure Assembling Visual Inspection 100% Technical Specification. ICL-M-001 H H W NA
Engineer Engineer Engineer
Method Statment.

Approved Drawing .
Quality QA/ QC QA/ QC
3.2 Titghening Torque test Measurment AQL procedure Technical Specification. ICL-M-001 H H W NA
Engineer Engineer Engineer
Method Statment.

Approved Drawing .
Verticality and Orientation Quality QA/ QC QA/ QC
3.3 Measurment 100% Technical Specification. SR-001 H H W NA
Check Engineer Engineer Engineer
Method Statment.

4 TESTING

Quality QA/ QC QA/ QC


4.1 Titghening Torque test Test / Review 100% Test according to standard ISO 1461 ICL-M-001 H H R NA
Engineer Engineer Engineer

5 FINAL ACCEPTANCE

Approved Drawing,
Final Examination and work Visual Inspection / Technical Specifications. All relevant Quality QA/QC QA/QC
5.1 100% R R R NA
Acceptance Review Method Statment. RFIs & ICLs Engineer Engineer Engineer
All Relevant Documents.

COMMENTS:

Remarks: The Construction Management may request additional tests in anytime during the develop of the works.

Notes Abreviations Sub-Contractor Sterling and Wilson Owner


MS : Method Statement.
MRI : Material Receiving Inspection
R: Review
W: Witness Point
H: Hold Point Sign: Sign: Sign: