FIELD QUALITY PLAN Document: SW-LYN-FQP-TLS-016
SUBJECT: Transmission Line SuperStructure Rev: 0
PROJECT AND LOCATION: 65 MW NOOR LAAYOUNE SOLAR PV PROJECT AT LAAYOUNE Date: 01/01/2018
SUB-CONTRACTOR STERLING AND WILSON ACWA THIRD PARTY
Quality
No. Operation descriptions Method Inspection Frequency Acceptance criteria
Document Inspection Inspection Inspection
Resp Inspection Point Signature Resp Signature Resp Signature Resp Signature
Point Point Point
1 PREVIOUS CONTROL
Approved Drawing.
Technical Specification. All relevant Quality QA/ QC QA/ QC
1.1 Documents checking Review 100% R R R NA
Method Statment. documents. Engineer Engineer Engineer
Calibration Report of the measuring equipments.
2 Materials
Supplier Approval.
Quality QA/ QC QA/ QC
2.1 Steel Structure Review 100% Technical Specifications. MRI R R R NA
Engineer Engineer Engineer
Material Desptch Clearance Certificate MDCC.
Supplier Approval.
Quality QA/ QC QA/ QC
2.2 Bolts, Nuts and Washers Review 100% Technical Specifications. MRI R R R NA
Engineer Engineer Engineer
Material Desptch Clearance Certificate MDCC.
3 EXECUTION
Approved Drawing .
Quality QA/ QC QA/ QC
3.1 Steel Structure Assembling Visual Inspection 100% Technical Specification. ICL-M-001 H H W NA
Engineer Engineer Engineer
Method Statment.
Approved Drawing .
Quality QA/ QC QA/ QC
3.2 Titghening Torque test Measurment AQL procedure Technical Specification. ICL-M-001 H H W NA
Engineer Engineer Engineer
Method Statment.
Approved Drawing .
Verticality and Orientation Quality QA/ QC QA/ QC
3.3 Measurment 100% Technical Specification. SR-001 H H W NA
Check Engineer Engineer Engineer
Method Statment.
4 TESTING
Quality QA/ QC QA/ QC
4.1 Titghening Torque test Test / Review 100% Test according to standard ISO 1461 ICL-M-001 H H R NA
Engineer Engineer Engineer
5 FINAL ACCEPTANCE
Approved Drawing,
Final Examination and work Visual Inspection / Technical Specifications. All relevant Quality QA/QC QA/QC
5.1 100% R R R NA
Acceptance Review Method Statment. RFIs & ICLs Engineer Engineer Engineer
All Relevant Documents.
COMMENTS:
Remarks: The Construction Management may request additional tests in anytime during the develop of the works.
Notes Abreviations Sub-Contractor Sterling and Wilson Owner
MS : Method Statement.
MRI : Material Receiving Inspection
R: Review
W: Witness Point
H: Hold Point Sign: Sign: Sign:
Date: Date: Date: