The document compares the specifications of two batch plants - a 50m3 batch plant and a 40m3 batch plant. It provides details on flow rates, times, and pressures for mixing water to the mix tank and wetting head, as well as mixing, transfer, and total batch times. The current offer aims to reduce the total batch time for both plants from 120/150 minutes to 60 minutes for faster filling.
The document compares the specifications of two batch plants - a 50m3 batch plant and a 40m3 batch plant. It provides details on flow rates, times, and pressures for mixing water to the mix tank and wetting head, as well as mixing, transfer, and total batch times. The current offer aims to reduce the total batch time for both plants from 120/150 minutes to 60 minutes for faster filling.
The document compares the specifications of two batch plants - a 50m3 batch plant and a 40m3 batch plant. It provides details on flow rates, times, and pressures for mixing water to the mix tank and wetting head, as well as mixing, transfer, and total batch times. The current offer aims to reduce the total batch time for both plants from 120/150 minutes to 60 minutes for faster filling.
Time Mix Water to Mix Tank Flowrate (m3/h) 93.8 46.9 Mix Water to Mix Tank Time (min/batch) 30 60 Mix Water to Mix Tank Pressure (kPa) 200 - 300 200 - 300
Mix Water to Wetting Head Flowrate (m3/h) max 12.0 12.0 Mix Water to Wetting Head Time (min/batch) 30 15.5 Mix Water to Wetting Head Pressure (kPa) 200 - 300 200 – 300
Mixing Time Time (min/batch) 60 60
Solution Transfer Time (min/batch) 30 30 Total Batch Time Time (min/batch) 120mins / 150mins / 2hr 2.5 hr 40m3 Batch Plant Current Offer 60min Filling Time Mix Water to Mix Tank Flowrate (m3/h) 93.8 46.9 Mix Water to Mix Tank Time (min/batch) 30 60 Mix Water to Mix Tank Pressure (kPa) 200 - 300 200 - 300
Mix Water to Wetting Head Flowrate (m3/h) max 12.0 12.0 Mix Water to Wetting Head Time (min/batch) 30 15.5 Mix Water to Wetting Head Pressure (kPa) 200 - 300 200 – 300
Mixing Time Time (min/batch) 60 60
Solution Transfer Time (min/batch) 30 30 Total Batch Time Time (min/batch) 120mins / 150mins / 2hr 2.5 hr