Professional Documents
Culture Documents
Disaster Risk 1. School has a Contingency Plan, i.e. Contingency Plan on contagious
Management Preparedness Plan turned into response actions diseases is already in place as per
/
when a disaster strikes requirement for the reopening of f2f
classes.
2. School has available, accessible and Medical kit in every classroom and
/
adequate first aid kit in every instructional room. building is evident.
3. School has at least 2 necessary and Emergency tools and equipment are
functioning equipment, in case of a disaster (e.g. available such as:
fire extinguisher, handheld/base radio, 1. Fire extinguishers;
generator, etc.) 2. Two-way radio units;
3. Axe;
4. Pick mattock;
5. Power tools;
/
6. Aluminum ladder;
7. Rubber boots;
8. Back spine stretcher;
9. Megaphone;
10. Hand shovel;
11. Hand tool set; and
12. Safety whistle.
4. School has identified spaces for putting up School area is flood-prone
Temporary Learning Spaces / Shelters in the /
aftermath of disaster
5. School has ready resumption strategies and Creation of school digitally-available
alternative delivery modes to ensure education Learning Resource Portal and
continuity / inclusion in the WFP for FY 2023 of
reproduction of SLMs for use in
alternative delivery modes.
6. School has ensured that students completed / Emergency response an
the Family Earthquake Preparedness Homework preparedness of school is still at the
Plan; and school has reported completion to developing stage where DRRM-
Division Office and Central Office. related activities include
procurement of tools, materials and
equipment for use in emergency
drills; teachers and learners still
need to be properly oriented on
emergency preparedness and
response.
7. School has established a school personnel Mechanism not yet in place.
tracking system/ protocol in the event of a /
disaster
8. School has trained personnel to administer School clinic teacher is trained but
first aid to students and personnel. / needs to be reinforced with various
capacity-building activities.
9. School has psychosocial interventions for Required in the reopening of f2f
/
personnel and students classes.
10. School has trained teachers and other Required in the reopening of f2f
personnel who could provide psychosocial / classes.
support to students
11. School DRRM Plan and SIP with DRRM School DRRM Plan is aligned to
integration were reviewed annually / SIP; Reviewed and/or revisited
annually during crafting of AIP.
12. School has established functional early As required in the reopening of f2f
warning system to inform students and classes. But need reprinting and
personnel of hazards and emergencies updating of signages and IECs.
/
(protocol, warning signs, devices, IEC),
considering national and LGU warning systems
and protocols
13. School conducted regular hazard -specific Mechanism not yet in place.
drills (at least 3 hazards) with participation of
/
stakeholders (BFP, Medic, LGUs, NGOs,
community, PTA, alumni, and others)
14. School has an evacuation plan and As required in the reopening of f2f
/
procedures classes.
15. School has a student -family reunification
plan that is clearly disseminated to students, /
teachers, and parents
16. School has conducted awareness and
/
capacity building for families and learners
17. School participated in the different
/
DRRM/CCA/EiE activities of the LGU
Risk Reduction 1. School has integrated key DRRM/CCA/EiE Inclusion of data to the BEIS for CY
and Resilience concepts in at least 4 subjects based on the / 2022
Education national Curriculum Guide (Lesson Plan)
2. Grade levels and subjects where DRRM and Grade 10 Science, EsP 7-10
/
CCA been integrated
3. More than 75% of students are actively 92 of the 112 learners participated
participating in various DRRM/CCA/EiE activities / in the earthquake drill done on
March 9, 2023.
4. School has a DRRM/CCA/EiE capacity Approved School DRRM Plan
/
building plan for teachers and personnel
5. School Head and personnel have received at
least 3 DRRM/CCA/EiE trainings from division or /
region or partners
6. At least more than 10 DRRM/CCA/EiE Not yet determined.
/
resource materials are available in the school
7. Presence of DRRM corner, with updated IEC / evident
materials posted in it, in every classroom
8. School carries out monitoring and evaluation Annual conduct of monitoring and
to assess sustainable implementation. evaluation of activities implemented
/ and results are analyzed and
realigned and/or forwarded to the
next planning cycle.